This weekend I've been blown away with Halogen qwen3.8-Flash-Next on Strix Halo. Speed:
Pre-fill: 1,196 - 1,409 t/s
Decode: 37-40 t/s
Even 256k context it's solid.
Quality-wise, qwen3.8-27b-8bit WAS my daily driver since it's launch, but Flash-Next is so far better.
1
1
112
Maybe it’s time to stop using average TPS as the headline benchmark for local LLMs.
Qwen3.8-27B-8bit on my Strix Halo averages 19.3 TPS, but during code edits it sits around 20-26 TPS.
That’s the performance I actually feel.
For coding agents, workload-specific TPS > average TPS.
After two days of coding full time with Qwen3.8-27b on EVO-X2 (Strix Halo) - no Codex, no Claude Code, here's what's working well:
Pi coding harness
Always use Low thinking
Use Q4 for planning, Q8 for implementation
Code in small iterations, reset each session context
AGENTS.md - how agents should engineer changes
VALIDATION.md - how agents should prove those changes are correct
github.com/yandaq/agents-def…
Make app observability a 1st class feedback loop for qwen3.8-27b, small iterations, and it 'just works'
3
6
307
Qwen3.8-27B code generation on Strix Halo (Ryzen AI Max+ 395), llama.cpp + Vulkan + the model's built-in MTP draft head:
Q4_K_M - 29.5 t/s
UD-Q4_K_XL - 29.3 t/s
UD-Q8_K_XL - 17.1 t/s
BF16 - 12.0 t/s
Draft acceptance holds at 0.77-0.80 across all four.
4
2
274
github.com/yandaq/qwen3.8-27…
Here's a write up of the optimisations. The write up is fragmented in places after a long session with Claude Code but hopefully you'll get the gist.
103
spent Fri evening / Sat morning wrestling with LM Studio and poor results. Got Claude Code involved and ended up dumping LM Studio for llama.cpp (LM Studio fork?!) and got above results. Today has been spent working with the model on real repos. Back down to averaging 17-20 t/s.
63
Ian Carroll retweeted
My RTX 5090 is ready. Expect some exclusive content.
First up will be Qwen 3.8 27B.
Claim your name if you’re into local ai:
local.ai/access?mode=claim&r…
51
I’ve been experimenting with using LLMs to build a persistent second brain for codebases in Obsidian.
Open sourced the prompt/framework today:
github.com/yandaq/codebase-s…
Curious what others think.
88
The real cost of inter-team dependencies:
• Increased wait times
• Higher coordination overhead
• Reduced flow
• More complex planning
• Decreased predictability
• Higher risk of delays
Track dependency-related metrics to drive improvement:
* Dependency lead time
* Blocking time
* Throughput
Measure to improve!
#ContinuousImprovement #FlowMetrics #DependencyManagement
1
1
438
Portfolio Kanban: Making Dependencies Visible
Hidden dependencies kill portfolio performance.
Lean solution? Visualise everything:
- Cross-team dependencies
- Technical prerequisites
- Business constraints
- External dependencies
- Regulatory requirements
Early dependency identification significantly reduces delays.
Remember: You can't manage what you can't see.
#PortfolioKanban #DependencyManagement #VisualManagement #LeanThinking
313
The power of probabilistic forecasting:
'When will it be done?'
Wrong answer: 'We estimated 3 weeks'
Right answer: 'Based on our data:
* 50% confidence: 15 days
* 85% confidence: 21 days
* 95% confidence: 28 days'
Stop promising single-point estimates. Start having data-driven confidence level discussions.
#FlowMetrics #Forecasting #PredictableDelivery
2
167
Transform your dependency management with these Lean practices:
1. Just-in-Time alignment meetings
2. Cross-team visualisation
3. Clear Class of Service policies
4. Explicit capacity allocation
5. Regular dependency retrospectives
Focus on reducing dependency resolution time before trying to eliminate all dependencies.
DM me to learn more about these practices.
#LeanPractices #TeamEfficiency #ContinuousFlow #Agile #Kanban
132
Stop estimating, start measuring!
Instead of spending hours estimating work items, successful organisations track:
• Actual cycle times
• Flow
• Throughput data
• Lead time distribution
Results speak for themselves:
* More accurate forecasting
* Less time in planning meetings
* Better predictability
Use real data, not guesswork.
#LeanMetrics #Forecasting #FlowMetrics #Estimation
117
Forget about resource utilisation.
Instead, track:
• Cycle Time
• WIP levels
• Throughput
• Aging WIP
Why? Because work flowing smoothly through your system delivers more value than keeping everyone busy.
Walk your Kanban board right-to-left in daily syncs. Focus on finishing work, not starting more.
#FlowEfficiency #LeanManagement #BusinessAgility #ProductivityMetrics
89
The hidden cost of portfolio multitasking:
Every time you switch between initiatives, you're paying an invisible tax:
• Context switching losses
• Delayed value delivery
• Reduced quality
• Team cognitive load
• Increased coordination overhead
Solution: Portfolio-level WIP limits and focus on finishing over starting.
#LeanThinking #PortfolioStrategy #Productivity
1
78
The Flow Manager's Guide to Capacity
Stop being a "resource manager" and become a "flow enabler":
• Remove bottlenecks, don't add resources
• Optimise handoffs, don't increase utilisation
• Reduce batch sizes, don't expand capacity
• Eliminate waste, don't add complexity
Your system's capacity is limited by its constraints, not its resources.
Transform your thinking, transform your results.
#FlowEfficiency #LeanManagement #OperationalExcellence #ContinuousFlow
68
Strategic Portfolio Alignment
Your portfolio is telling you something. Are you listening?
Key metrics to track:
• Flow
• Time-to-market
• Value delivered
• Strategic alignment
Data-driven portfolio decisions outperform gut feelings every time.
#StrategicAlignment #MetricsAndKPIs #PortfolioSuccess
1
85
Transform your planning meetings:
STOP discussing:
* Detailed estimates
* Resource availability
* Individual capacity
START discussing:
* System capacity
* Flow metrics
* Blocking issues
* Work aging
* Queue management
Result? Shorter meetings, better outcomes.
How have you transformed your planning approach?
#LeanPlanning #ContinuousDelivery #FlowEfficiency #Kanban