ALT A fluffy white dog wearing a white lab coat, red service dog vest, and boots is seating in front of a female scientist wearing jeans, boots, a white lab coat, and goggles pushed up in top of her head. The scientist looks serious. In the background is a laboratory setting.

ALT A fluffy white dog wearing a white lab coat, red service dog vest, and boots is looking back over his shoulder as they are seated in front of a female scientist wearing jeans, boots, a white lab coat, and goggles pushed up in top of her head. The scientist looks serious. In the background is a laboratory setting.

ALT I am reaching out regarding upcoming EPCOR Drainage construction on 102 Ave. Starting on Aug 31, for approximately two days, weather permitting, EPCOR will be replacing a storm service that was recently damaged. This work has been fast-tracked to address the issue of water pooling on the sidewalk. The repair will require open cut excavation and will impact the 102 Ave bike lane between 125-126 St. We’re working to support connectivity and access for people traveling by all modes during this work, and we wanted to share the accommodation plan for people cycling: · People cycling will be directed to dismount and walk for about half a block, using a temporary multiuse path in the northernmost westbound lane, which will be closed to traffic to accommodate pedestrians and cyclists. · Shared pathway signs will be posted on 102 Ave for bicyclists and pedestrians. · Signage will be posted on 102 Ave and 125 St in advance of the work area advising of the construction.