So many massive projects are being built across America right now that I could not keep up with them all. I got tired of digging through filings and bookmarking articles just to see what actually broke ground, so I built Long Haul Ledger to track them in one place.
• 373 verified US builds totaling $2.81 trillion across all 50 states and DC
• 187 projects under construction right now, with 52 already operating
• $809.6B in data centers and $608.5B in semiconductor fabs leading the surge
• Updated daily with real filings, public records, and a source on every pin
Every power plant, chip fab, factory, and shipyard on this map feeds directly into the jobs, electricity, and tools that will shape everyday life over the next decade.
Are you in it for the Long Haul?
2
1
127
Explore the live US build map and sources: longhaulledger.com/projects/
Music: "The Climb" by Scott Buckley (scottbuckley.com.au), CC BY 4.0 (creativecommons.org/licenses…), 40s excerpt, volume-normalized.
15
NASA wants a nuclear Moon ☢️
On Nov 20th, NASA opened the bidding to build the first nuclear fission reactor on the Moon.
It's called Lunar Reactor 1. @NASA's Glenn Research Center in Cleveland (@NASAglenn) posted the final call for bids, and the spec sheet reads like a dare:
• 20 kilowatts of electricity, nonstop, even after a part fails
• 5 years at full power with no maintenance
• Built for the lunar south pole, where one night can last 354 hours (almost 15 days)
• Ready for launch by December 2030, with @ENERGY helping supply the uranium fuel
• Bids due Dec 21st, contracts worth up to $350 million, first awards planned for April 2027
How it works: the reactor splits uranium atoms to make heat, a sealed loop of gas spins a turbine to turn that heat into electricity, and big radiators shed the leftover heat.
When NASA asked who was interested in August, dozens of companies and labs answered, including @LockheedMartin, @WECNuclear, @blueorigin, @xenergynuclear, @oklo and @Int_Machines.
Twenty kilowatts covers the average electricity use of about 16 American homes. On the Moon, it will keep a base's lights, radios and rovers going through two weeks of darkness. I can't wait to see who wins this.
Small reactors that run for years with nobody touching them are the same kind of power remote towns, mines and military bases on Earth are asking for.
Everyone wants consistent energy an emergency situation. A Moon base demands it.
1
1
156
Follow the builds: longhaulledger.com
Caveat: first round pays for design and ground tests only; flight reactor needs a later go-ahead (down from 100 kW).
Source (Nov 20th NASA Glenn bid call): sam.gov/opp/1b4c7968126d4f4e…
📸 Artemis II crew, April 6th (NASA)
1
19
A shipyard in South Philadelphia is doing something in America that hasn't been done since 2017.
On Nov 17th, @PhillyShipyard cut the first steel for a run of four oil and chemical tankers ordered by Hanwha Shipping. The yard sits on the old Philadelphia Naval Shipyard and is part of @HanwhaDefenseUS.
• Each ship is 600 feet long, about 49,500 tons
• Deliveries are due from 2029 to 2030
• About 2,300 people work at the yard now, and Hanwha plans to pass 4,000
• A planned $5 billion goes into cranes, dry docks, piers and automated welding gear
• The goal is to go from one ship every eight months to one every few weeks
Matson container ships and Navy landing ships are already lined up behind these tankers on the same yard.
These ships will carry fuel between American ports, the fuel that heats homes and runs businesses. A yard that grows from 2,300 to 4,000 people also means thousands of welders, pipe fitters and crane operators with steady work, and more American capacity to build the things we move around.
3
1
133
A few notes:
• The last U.S.-built medium-range oil tanker, American Pride, left this same Philadelphia yard in November 2017.
• The 2029 to 2030 deliveries, the 4,000 workers and the $5 billion are Hanwha's plans. So far steel is being cut on the first ship.
• Analysts say U.S.-built ships usually cost more than double similar ships built in China. Hanwha says its costs come down as output rises.
• The business leans on the Jones Act, which says ships carrying cargo between U.S. ports must be U.S.-built with American crews. Some foreign ships currently have waivers.
• Headcount and speed goals come from Hanwha's Nov 17th details as reported by the Philadelphia Inquirer (@PhillyInquirer) and Vessels.
Source: hanwhaphillyshipyard.com/han…
📸 | Hanwha Philly Shipyard (@PhillyShipyard), a worker at the cutting machine console during the Nov 17th steel-cutting ceremony
More builds like this: longhaulledger.com
38
Scenes from Nvidia headquarters as Jensen comes back. The Nvidia employees wanted him back more than anything.
Grateful to the President, everyone in the administration, everyone who signed the petition, everyone who supported Jensen publicly, everyone who called the board, everyone on the board who fought for him, everyone.
This is why America is the greatest country on earth.
Every part of Jensen’s story would have only been possible in America.
And remember that Gandalf the White was even better than Gandalf the Grey in every way.
“Let’s get to work.” 🇺🇸
Did the US economy grow 3.4% in just three months?
No.
• Real GDP increased about 0.8% from the second quarter to the third quarter of 2026.
• The 3.4% is that same change shown at an annual rate, the pace if it held for four quarters, per @BEA_News.
• Compared with a year earlier, real GDP was up 2.1%.
• What led it: business equipment, mainly computers, plus consumer spending on health care, meals out and prescription drugs.
Spending by households and businesses together rose at a 4.9% annual rate.
Growth led by business equipment and everyday spending keeps orders flowing to plants, suppliers and the towns around them.
1
18
How BEA turns one quarter into a yearly pace, and which number to use for planning: longhaulledger.com/explainer…
📸 The US at night, NASA Earth Observatory (public domain)
7
Witness
How quickly we are to forget
to tell those who are alive to fret
that the things fragile to beget
do ultimately come to an end.
Often unceremoniously.
Like forgetting to hit save,
and then only remembering
because your computer crashes.
20
173 big US projects, $2.08 trillion, 50 states and DC. All on one map.
The Long Haul Ledger tracks the factories, chip fabs, data centers and power plants being built across America, with a source on every one.
• Data centers lead at $675.7B across 39 projects
• Semiconductors are $584.3B across 15 projects
• 71 projects are under construction right now
• 24 are already up and running
Explore the map: longhaulledger.com/projects/…
In it for the Long Haul.
1
32
Every project shows its sponsor, stage, dollar figure and source. The free Monday Haul covers the biggest new ones every week: longhaulledger.com/join/?x=1…
📸 Google's data center in Council Bluffs, Iowa. Chad Davis, CC BY 2.0, via Wikimedia Commons
15
Ohio just approved 2,150 megawatts of new natural gas power plants that won't connect to the public grid at all. On Nov 19th the Ohio Power Siting Board cleared a 1,350 megawatt plant in Millersport to power four data centers on a @VantageDC campus and an 800 megawatt plant in Ashville for EdgeConneX data centers.
Three more big builds 👇
1. ⚛️ Fusion company Pacific Fusion got New Mexico's first radioactive materials license for a private fusion company, clearing it to use tritium, a heavy form of hydrogen used as fusion fuel, at its $1 billion campus under construction in Albuquerque.
2. 🚂 The state-owned Alaska Railroad gave final approval to a $311 million, 32 mile rail line linking Port MacKenzie, a deep water port across Cook Inlet from Anchorage, to its main line near Houston, Alaska.
3. ⚓ New York Governor Kathy Hochul (@GovKathyHochul) announced $228 million for five port and shipyard projects, led by $100 million for a new heavy lift wharf at the Port of Coeymans.
Long Haul Ledger tracks where the world is building.
Check out the ledger here: longhaulledger.com/?x=1
3
3
198
Get The Monday Haul free by subscribing here: longhaulledger.com/join/?x=1
📸 The Oregon Clean Energy Center, a natural gas power plant in Oregon, Ohio. Photo: MrJacon000, CC BY-SA 4.0, via Wikimedia Commons (cropped and brightened).
18
“I am honored to return to NVIDIA and lead one of the most consequential technology companies in the world at the beginning of a new industrial revolution,” said Jensen Huang. “I take this responsibility with the greatest humility and renewed commitment. I want to thank the NVIDIA Board for its confidence and deliberation through this process. I am especially grateful to Harvey Jones for his leadership as Chair, and to Colette Kress and our executive staff for leading NVIDIA during this period. I am also deeply thankful to our employees, shareholders, leaders across the industry and partners around the world for their extraordinary support. Above all, I am grateful for the love and support of my family. I can’t wait to get back to work.”
“The NVIDIA Board of Directors has made the correct and proper decision to return Jensen Huang to the position of CEO… Congratulations to Jensen, the NVIDIA Board, to the People of the United States — and, indeed, the World!” - President DONALD J. TRUMP
45
NVIDIA (NASDAQ: NVDA) today announced that effective immediately, Jensen Huang has been reinstated as President and Chief Executive Officer and as a member of the Board. The Board of Directors voted unanimously to reinstate Mr. Huang following a series of discussions and meetings with Mr. Huang, after which the Board was satisfied with respect to Mr. Huang’s candor and ability to lead NVIDIA.
NVIDIA Board reinstates Jensen Huang as President, CEO and Board Director.
Read the release: nvidianews.nvidia.com/news/n…
1
105
Elon has bestowed the chef's-kiss on AI6, and if you’ve ever had a world-class chef give you one of those, well.
AI5 is Tesla's next AI chip, and Elon said this morning it's skipping the cars and going straight into the robots 👇
• AI4 is the self-driving computer already in every new Tesla. Elon says it's enough for superhuman driving, so cars stay on it. No need to give the toasters too much thinking space
• AI5 is the next, much more powerful chip, and it goes to @Tesla_Optimus first, along with Tesla's AI data centers
• Samsung's fab in Taylor, Texas and TSMC's in Arizona both make AI5, and Samsung is aiming for volume production in the second half of 2027
• Chips keep getting pricier too. Elon says AI4 now costs twice as much because memory and storage prices jumped
• That's the whole case for Terafab, the giant chip plant @SpaceX and @Tesla plan in Grimes County, Texas, to make chips for Optimus and Cybercab. Phase one is $16.8 billion, with volume output targeted for late 2028
Makes sense when you think about it. A robot has to see, walk, balance and work with its hands all at the same time. That's a lot more thinking than staying in a lane.
Every chip that goes into a robot is a bet on who does the heavy, dull and dangerous work. If more of those chips get made in Texas and Arizona, that means more good jobs here, more stuff built close to home, and more hours back in your day.
2
1
173
Elon's AI5 answer came in a reply this morning. The fab dates come from @Reuters and @tomshardware.
These are target dates, so they could move as the fabs come online. FSD is still supervised, and older HW3 cars don't have an upgrade date yet.
More big builds: longhaulledger.com
20