
Head Groundsman Rotherham United Football Club #rufc
Joined August 2012
- Tweets554
- Following461
- Followers2.2K
- Likes991
When you're a groundsman and the Mrs, moans about the garden, so you do her this as a present for when she get home from work 🦁🦁🦁🏴 – at Hellaby, England
Dave Fellowes retweeted
This @RUFC_CT fan is donating 13" of hair to @LPTrustUK a charity who creates wigs for children who have lost their hair due to medical treatments/illness. She is asking for sponsors so the charity can continue doing their brilliant work.
@DaveFellowes
fundraise.littleprincesses.o…
Dave Fellowes retweeted
VACANCY | Grounds Person
An exciting opportunity to join the grounds staff team at Rotherham United has arisen 👇
#RUFC | #TownCountyUnited
There is no tent this week for @RotherhamUnited, back to the old faithful frost covers. 💪🏻 – at Yorkshire and The Humber, England
Fantastic effect from my team over the last 4 day, all @RotherhamUnited staff who helped and @SSStadia for the brilliant service. Went to the wire getting the tent off and all went to plan. Makes it worth it for 3 points and a good performance #rufc – at Yorkshire and The Humber, England
Tent has done its job. All the snow and ice melted, pitch defrosted. Soil temperature sitting at a steady 4oc. Lads able to work underneath. – at Rotherham, England
Day 19 to 23.... all drainage pipes connected to main carrier pipes, rest of chambers fitted. Irrigation upgrades started (new sprinklers/control wires). Hot tubs drained and filled with stone. Secondary drainage started with koro top drain (slow process as lots of break downs. – at Yorkshire and The Humber, England
Sorry for no updates for a while. I've been very busy, loads happening. Day 11 to day 18.... all drains finished cutting out, pipe in/gravel/topped with sand. 300 tonnes of sand applied and some hot tubs dug 🤦♂️(very wet areas, could be a spring). Sand power harrowed in. – at Yorkshire and The Humber, England
Day 10.... Lads from @CSportsTurf doing a fantastic job. Drainage channels being cut out. Piped and filled.
Day 9... busy day on and off the field! Levels are starting to take shape. Drainage trenches being cut in, pipe, and gravel back fill. #rufc – at Yorkshire and The Humber, England
Day 8... finally, a dry day! Trenching out main carrier drains, more grading with the lazer grader and a rake to fluff up the surface to aid grading. – at Yorkshire and The Humber, England
Day 7.... heavy rain this morning, made any earth work impossible. So irrigation tank pad concreted and main drainage chamber finished. Hopefully start breaking ground tomorrow and install drain pipe channels. – at Yorkshire and The Humber, England
Day 6.... busy busy busy. Old junction boxes removed, tank pad ready for concrete, old irrigation pipe/control cable removed, laser grading has started. Happy Grounds Manager #rufc – at Yorkshire and The Humber, England
Day 5... sorry for the late update. Meal out with the family and got stuck into the masters with some bevvies. No groundworks today, i let it dry out after yesterday's setback. Level stone for new irrigation tank and started shuttering. Busy day tomorrow, I will post some photos – at Kirkby on Bain, England
































