Specialists in BMS Service, Design & Commissioning. Contact us via [email protected] https://teapawt.net/t.co/szoqPUmrBv

London, England
Joined May 2014
Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)Photo by Developed Controls (@DevelopedCtrls)
Take a look at our website for further details of services we offer developedcontrols.co.uk
2
On site today at @30EustonSquare installing Mitsubishi AC Interface, a bespoke adapted Niagara 4 Jace
4
5
Recent retrofit 4G Router for remote access and alarm monitoring at Peckham Library
3
PPM Carried out on OSS controllers this week by one of our engineers, a first for Developed Controls working with OSS Controllers
2
Today one of our engineers are carrying out a service of this IQ251 controller
Earlier this week we replaced a total of 18 poorly maintained and faulty actuators on a residential manifold installation
Our engineers have been busy working on this panel design for a residential block boiler room in Brixton
1
Out with the old, in with the new, @belimoholdingag actuator fitted in place of faulty Honeywell actuator earlier this week in Hammersmith
1
Panel Bench testing being carried out earlier this week, ready to be installed Central London
1
This week we have replaced a faulty Inverter with a new @abb_uk 32A inverter and fully recommissioned the unit
1
We have also been busy down at Vauxhall installing & commissioning 68 No. FCU's controlled by IQECO35's
Niagara 4 control panel fitted with iSMA IO module has been fitted at a residential property in Notting Hill Gate replacing obsolete TAC
2
We have also carried out many full re-commission projects as well as smaller installations recently #BMS
Several of our sites have now been fitted with 4G routers for remote access, cost effective access managed by Developed Controls
We have carried out an upgrade of this obsolete R2 Panel to a Niagara 4 control system, an iPad has been installed to view graphics
We are happy to update you on some projects we have been working on the past months ....
Good Morning to all our followers, sorry for the social media silence past couple of months, it's has been busy times at Developed Controls
Its been a long day, but two large quotes turned around and sent to the client in less than 24 Hours, plus 2 orders received today #BeMS
1
Perfect day for some roof top AHU testing
1
Happy Friday all, we have been installing some more Ontrol smart wall adjusters this week, connected back to a Jace 8000
3⃣Days until the @TridiumInc #NiagaraForum, finalization of everything has begun, we look forward to seeing you... 😁