ForgeAsset started as a spreadsheet built to answer one personal question: does hosting a Supercharger site actually pencil? The answer needed hundreds of inputs, a tax engine, and sensitivity analysis. It's now a product because the buyer side of this market had nothing.
ForgeAsset retweeted
What's in the $149 report: 15-year monthly and annual cash tables, sensitivity tornado, price-times-utilization matrix, funded-vs-self-funded comparison, per-year lender coverage ratios, a risk register, and the exact assumptions used to produce all of it.
Wrote up what it really costs to host a Tesla Supercharger — the full stack of cost lines behind one site. → forgeasset.com/blog/what-it-…
14
ForgeAsset retweeted
The federal 30% credit for EV charging infrastructure (Section 30C) sunset on June 30, 2026. Placed-in-service date now decides eligibility — a few months of construction slip can mean a six-figure difference in after-tax cost. The model checks the date against the sunset.
I mapped every US Supercharger by what it actually pays for electricity. The demand-charge regions light up instantly. → forgeasset.com/supercharger-…
ForgeAsset retweeted
New Hampshire has no personal income tax — but a 7.5% Business Profits Tax that applies to a charging LLC's operating income. State entity taxes are one of the quieter line items that a 15-year model surfaces.
Spent the week deep in utility tariffs across 50 states. Filed rates for the same kind of site swing by a factor of ten. No two territories play by the same rules.
3
ForgeAsset retweeted
Georgia taxes every kWh dispensed at a public charger — roughly 2.8¢/kWh of excise. Pennsylvania has its own per-kWh levy. Two sites with identical utilization and identical tariffs can diverge purely on state excise policy.
2019 me bought Tesla stock. 2026 me is modeling what it costs to host the chargers. Same thesis, different altitude — the interesting money in EVs is moving from the cars to the infrastructure under them.
ForgeAsset retweeted
Florida's FPL has an EV rate that caps billed demand as a function of energy delivered — effectively a protection for young, low-utilization sites. Structures like this change the early-year math more than any incentive.
ForgeAsset retweeted
Massachusetts prices demand charges by load factor: a site that spreads its energy use evenly pays a different rate structure than one with sharp peaks. The MA EV rate folds this into tiers — one of four distinct demand-charge structures we model.
Most people have no idea the utility behind their local Supercharger can charge 5–10x more for the same kWh than the next state over. Geography is the whole game.
1
9
ForgeAsset retweeted
Hawaii is the hardest Supercharger economics in America: ~38¢/kWh input cost on Maui, flat, all day. The retail price needed to clear that is a number most mainland operators never have to contemplate.
For the EV crowd: if you owned the land, would you host a Supercharger, lease to a third party, or stay out? Curious what people think the economics actually look like.
ForgeAsset retweeted
Lenders don't ask about payback. They ask about DSCR — debt service coverage. The model computes it per year, because a site that covers its loan in year 5 but not in year 2 has a year-2 problem.
ForgeAsset retweeted
"Payback in X years" means little without the cash curve behind it. A site can be cash-flow positive monthly and still sit under a six-figure cumulative deficit for years. The 15-year cumulative cash line tells the real story.
ForgeAsset retweeted
A few months ago I wanted a straight answer to one question:
what does it actually take to run a $tsla Supercharger as a business? Everything I could find was either a sales deck or a discussion in forum — confident numbers with nothing underneath them.
So I went and did the reading. What decides a site isn't the hardware, it's the utility bill, and demand charges are different in every territory. That meant working through filed rate schedules one utility at a time: 85 of them across 84 territories, 49 states and DC, each row stamped with the document it came from and the date it took effect.
Then I built the rest around it — hardware and install per stall, the utility upgrade nobody quotes you until late, contingency, the down payment and loan terms you'd actually sign, a utilization ramp that doesn't assume day-one traffic, LCFS where it applies, state tax treatment, and a 15-year cash flow. Every scenario is checked against the spreadsheet I'd been keeping by hand, and has to match it to within a dollar.
The whole point was taking the guessing out. So it ends on what must be true: the retail price and utilization the case depends on, where each sits today, and the gap between them. An estimate built from your inputs, not a verdict.
Type an address and it does the rest.
50-second walkthrough ↓ @Forge_Asset
The 30C tax credit and LCFS clean-fuel credits can flip a charging site from red to black. They're also the most misread line in the whole model — worth more than most assume, and easy to leave on the table.
1
6
ForgeAsset retweeted
Replying to @xbtcarat @Forge_Asset
Anyone weighing a Supercharger as an asset — from a first single stall to a tenth multi-stall site, including while you're still deciding whether the numbers work at all. you want me to run a scenario for a site ?
Below specifies possible use cases i can think of!
ForgeAsset retweeted
Weighing land for a charging site? The first question isn't how many stalls.
It's which utility territory you're in — it moves the economics more than anything else. 👇