James Downing (@JDowning37) profile picture

D.C. Correspondent at RTO Insider/Net Zero Insider. I am not Billy Jack IRL.

Arlington, VA
Joined June 2014
Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)Photo by James Downing (@JDowning37)
The pages of testimony filed at the Virginia SCC on NextEra and Dominion's merger:
82
This might break the record for latest @FERC order (>11 PM) - it tells @pjminterconnect to improve backstop procurement proposal - elibrary.ferc.gov/eLibrary/f…
1
4
5,838
James Downing retweeted
A three-judge panel of the U.S. Court of Appeals for the District of Columbia Circuit vacated DOE’s order keeping the Campbell coal plant in Michigan from retiring, saying it usurped the state’s authority. Why This Matters: The court's opinion means the Campbell coal plant in Michigan can retire after more than a year of delay, but it also has implications for other Federal Power Act 202 (c) orders that are pending appeal. ow.ly/VzPI50ZMGgV
4
2
7
1,632
The DC Circuit vacated DOE's 202 (c) order keeping the Campbell plant in Michigan open, finding it usurped state authority. The first time a court has reviewed DOE's effort to prevent retirements of fossil plants states had approved. media.cadc.uscourts.gov/opin…
3
8
3
30
17,574
I was mildly disappointed when it wasn't the lasagna cat
164
Reminds me of Joe Manchin shooting a copy of Waxman-Markey in an early Senate campaign ad
I became a Marine to fight for this country. Now, I'm running for Secretary of State to fight for you. Join us today at BeauBayh.com.
233
It’s been a privilege to watch this team. I’m a born and bred Red Sox fan. – at New York, NY
214
1,672
830
7,681
Mr. Burns is the type who would manipulate power markets and screw over his customers
Actually Springfield is affordable because it uses safe and cheap nuclear power.
210
"Speed to power" and transmission have some inherent tensions, but a new @EnergySystemsIG report explains how some planning can help connect large loads and how those large loads impact the long-term planning of the grid - rtoinsider.com/137839-esig-r…
2
276
James Downing retweeted
If Mamdani would like me, a white New Yorker who never owned slaves, to pay a black New Yorker who never was a slave, then I propose: Every Muslim in NYC starting with Mamdani, should pay us for 9/11. Please explain why the latter makes no sense but the former does.
1,923
15,671
539
105,294
2,801,233
FERC added James Danly and Joe Bowring to the list of speakers at the PJM technical conference next week - ferc.gov/media/third-supplem…
1
2
538
The long-awaited DEFRs?
GOV. HOCHUL: “We're waiting for the Trump administration to hopefully green-light us on my massive expansion of nuclear. I want to build more nuclear in New York than the entire country has in 30 years.”
211
FERC oversight hearing one week from today on 7/22 energy.senate.gov/hearings/2…
113
James Downing retweeted
ERCOT's "connect and manage" model has moved non-firm generator interconnection to the center of reform debates. Less examined: most US regions instead offer a non-firm option called Energy Resource Interconnection Service (ERIS). Has it worked? I’m pleased to share two new companion preprints I co-authored on this topic in my capacity @DukeU with Prof. Dalia Patino-Echeverri, @whgorman, Fredrich Kahrl, Joachim Seel, & @rand_joseph. Together, the papers provide the most comprehensive assessment of ERIS to date: the first statistically robust empirical comparison of ERIS and NRIS outcomes, paired with a systematic review of how ERIS is implemented. 📄 𝐏𝐚𝐩𝐞𝐫 𝟏: 𝐈𝐬 𝐄𝐧𝐞𝐫𝐠𝐲-𝐎𝐧𝐥𝐲 𝐈𝐧𝐭𝐞𝐫𝐜𝐨𝐧𝐧𝐞𝐜𝐭𝐢𝐨𝐧 𝐖𝐨𝐫𝐤𝐢𝐧𝐠? 𝐄𝐦𝐩𝐢𝐫𝐢𝐜𝐚𝐥 𝐄𝐯𝐢𝐝𝐞𝐧𝐜𝐞 𝐟𝐫𝐨𝐦 𝐓𝐰𝐨 𝐃𝐞𝐜𝐚𝐝𝐞𝐬 𝐨𝐟 𝐔.𝐒. 𝐌𝐚𝐫𝐤𝐞𝐭 𝐃𝐚𝐭𝐚 Drawing on a novel dataset of over 4,500 interconnection cost studies and 36,000 interconnection requests, we find that ERIS has not delivered a durable cost or speed advantage. Its historical cost advantage is largely a "threshold effect" that appears only when a project avoids network upgrades altogether. As grid saturation has cut the share of zero-cost ERIS outcomes from roughly 80% to 10%, that advantage has largely evaporated, and developer demand has contracted in step. 🔗 ssrn.com/abstract=6881698 📄 𝐏𝐚𝐩𝐞𝐫 𝟐: 𝐀 𝐑𝐞𝐯𝐢𝐞𝐰 𝐨𝐟 𝐔𝐧𝐢𝐭𝐞𝐝 𝐒𝐭𝐚𝐭𝐞𝐬 𝐄𝐧𝐞𝐫𝐠𝐲-𝐎𝐧𝐥𝐲 𝐆𝐞𝐧𝐞𝐫𝐚𝐭𝐨𝐫 𝐈𝐧𝐭𝐞𝐫𝐜𝐨𝐧𝐧𝐞𝐜𝐭𝐢𝐨𝐧 𝐒𝐞𝐫𝐯𝐢𝐜𝐞 𝐏𝐨𝐥𝐢𝐜𝐲 𝐚𝐧𝐝 𝐂𝐨𝐧𝐬𝐢𝐝𝐞𝐫𝐚𝐭𝐢𝐨𝐧𝐬 𝐟𝐨𝐫 𝐑𝐞𝐟𝐨𝐫𝐦 Reviewing six ISOs and three major vertically integrated utilities, we document wide and often poorly understood variation in study methods, cost allocation, and procurement rules, showing how regions range from managing congestion through real-time operations to triggering network upgrades during interconnection. 🔗 ssrn.com/abstract=6870718 Notably, both papers conclude that the issue is not the concept of energy-only interconnection – which remains economically sound – but how it has been implemented: restrictive study assumptions that require upgrades for congestion that could instead be handled through operational redispatch. We hope these serve as useful resources as stakeholders and researchers continue to evaluate these issues, and very much welcome feedback!
2
16
3
65
16,516
I hate this timeline
BLOCKBUSTER: The Boston Celtics have agreed to trade Jaylen Brown to the Philadelphia 76ers for Paul George, two first-round picks and two second-round picks, sources tell ESPN.
75
Trump v Slaughter was a 6-3 decision with the Democrat nominees dissenting. Justice Sotomayor wrote the dissent, indicating FERC will ultimately be impacted
119
Trump v Slaughter was just issued, SCOTUS agreed POTUS' firing independent commissioners at FTC was Constitutional, overturning an FDR-era precedent supremecourt.gov/opinions/25…
161
Inbox - @TKavulla named new Administrator/CEO for Bonneville Power Administration.
1
1
14
1,859
He stole this bit from Mitt Romney
Never change Mike Brown, never change 😭
173