
ALT An overhead view, taken at night, showing the wood form -- built of strong lumber -- with rebar, or steel reinforcing rods, already placed inside it, before the crew begins to pour hundreds of tons of wet concrete inside the form. Later the wood form will be removed, leaving the concrete-and-steel foundation in place. Next, the abutment, or bridge wall, will be constructed on top of this foundation.

ALT An aerial view of the construction site of the Wallis Annenberg Wildlife Crossing on US Highway 101, the Ventura Freeway, in Agoura Hills, California. A red box indicates the area where crews placed hundreds of tons of wet concrete on the night of November 3 and the early morning of November 4, 2023, for the foundation of the abutment, or bridge wall. This photograph was taken in the daytime, weeks before the nighttime operation when the concrete was placed here.

ALT An aerial photo taken at night showing where crews are placing hundreds of tons of wet concrete for the foundation of the abutment, or bridge wall, next to the southbound lanes of US Highway 101 near Liberty Canyon Road in Agoura Hills, California, to build the Wallis Annenberg Wildlife Crossing.






































