
Journalist focused on energy, mostly. Incoming Masters in IR student at @SAISHopkins
Washington, D.C.
Joined January 2015
- Tweets1.6K
- Following973
- Followers591
- Likes4.5K
Lea Booth retweeted
When Republicans control the White House, they abuse the permitting process to block solar & wind projects.
When Democrats control the White House, they abuse the permitting process to block oil & gas projects.
But energy infrastructure projects of all kinds require massive upfront investment (nuclear, solar, geothermal, wind, transmission, batteries, nat gas, etc).
Investors won't finance the billions of dollars in capex we need in such an uncertain regulatory environment.
Energy abundance requires permitting certainty, and the Freedom Act is the first bill that would make it happen.
🚨 Major new permitting reform bill just dropped!
The FREEDOM Act tackles one of the biggest barriers to energy projects: permitting certainty.
The problem is executive abuse of permitting. Officials can use permitting rules to kill projects from disfavored industries.
Democratic presidents use permitting to block oil & gas. Republican presidents use it to block solar & wind.
The FREEDOM Act would end this by creating the certainty needed for energy abundance.
The new bipartisan FREEDOM Act is led by @RepJoshHarder, and also sponsored by @RepMikeLawler, @RepChuckEdwards, @RepAdamGrayCA, and @RepDonBacon.
Why permitting abuse is hard to fix
The executive branch has enormous control over permitting. There are 5 stages where agencies can kill disfavored projects:
Pre-application: Gov can close off new applications (e.g. leasing moratoriums)
Application: Agencies can refuse to process applications
Processing: The executive can slow-walk permits or pause indefinitely (e.g. LNG pause, current renewables pause)
Litigation: Gov can sabotage sponsors by siding with NIMBY lawsuits
Construction: Gov can revoke permits or issue stop-work orders
How the FREEDOM Act solves it
The bill puts strict guardrails on the permitting process and backs them with court-enforceable remedies.
Applications: Executive must certify complete applications within defined timeframes. → Remedy: Sponsors can sue, agencies pay daily fees for violations.
Processing timelines: 90 days for routine permits, 1 year for complex permits, 2 years for NEPA EIS reviews. → Remedy: Sponsors can sue, courts can appoint contractors to finish reviews.
Litigation: Bans voluntary remand without sponsor consent.
Construction: Strict limits on revocations and stop-work orders. The executive must show harm and prove no alternative exists. → Remedy: Courts can award full damages for wrongful revocations.
Extra protection
FREEDOM creates an optional insurance program. Sponsors can buy in at 1.5% of project cost. The program pays out if agencies violate the law (e.g. timelines and revocations).
Miscellaneous
FREEDOM adds several miscellaneous provisions on geothermal permitting, some small lease changes, and a small tweak to judical review.
FREEDOM shows real certainty is possible
The FREEDOM Act is the first bill to offer a path to real permitting certainty.
Congress should build on this momentum and negotiate a broader permitting reform deal with permitting certainty, transmission reform, NEPA reform, and clean water reform.
Lea Booth retweeted
It's real: Indian Point nuclear plant can run again.
Call it a Rebuild rather than a Restart.
Containment dome cuts might be the easiest thing. No tensioning so just patch the hole and you're good to go.
Turbines are ready to go.
Hardest may be the reactor heads and internals. Need to order new heads from Korea or Japan.
In total: as short as four years and in the best case a few billion dollars each. Call it $10b for as much as $20 billion in market value of electricity over the next twenty years of plant life post rebuild. Indian Point could then run for decades longer than that.
I'm convinced. This needs to happen.
INDIAN POINT RESTART: REAL OR NOT?
Just landed and went straight from La Guardia to Indian Point.
Starting out New York Climate Week the hard core way: an investigation deep into the heart of the machines that gave New Yorkers the best 30% of their city's power.
I'll report back from inside containment.
I have to find out the truth before I hit the glitzy stages of the conference circuit.
Follow along with me.
Lea Booth retweeted
I was on the biggest solar farm in Canada with 1.5 million panels.
The most interesting thing I saw was the solar panels have increased the yield of the grass by protecting it from the sun and wind.
I've become friends with the farmer who is fifth generation and he has built up a herd of 2,000 sheep to graze it.
The panels have provided a ton of value to his family's land.
Lea Booth retweeted
Do it! More than two gigawatts of round the clock emissions free power deliverable straight into NYC. Closing it was a huge mistake. Let's fix that mistake now.
Lea Booth retweeted
The bulk of the world's intellectual talent lies within this green oval. If America cuts ourselves off from that talent, we are part of the global periphery.
Lea Booth retweeted
The NRC is being drained of expertise left and right. Caputo is now the second commissioner to leave this year.
The Senate must ensure these vacancies are filled with pragmatic leaders, not partisan idealogues. We cannot allow Trump to DOGE the NRC.
NEW: Commissioner Caputo resigns from Nuclear Regulatory Commission, the second abrupt departure of a commissioner in two months as Trump seeks overhaul of agency. W @kelseytam subscriber.politicopro.com/a…
Lea Booth retweeted
The US Nuclear Regulatory Commission provides a powerful legal barrier against antinuclear forces in the USA who seek to delay and destroy nuclear energy through legal uncertainty.
But now the NRC is under full-scale attack from a bunch of folks who don't seem to understand the crucial role the NRC plays in protecting nuclear energy from endless, arbitrary legal attack and investment-killing uncertainty.
Just a few minutes ago Republican Annie Caputo, perhaps the most pro-industry NRC commissioner of them all, resigned. @AlexCKaufman has the scoop. Caputo apparently resigned rather than be compromised by politics of NRC independence destruction.
The NRC helps ensure that there is only a tiny, extremely tough attack surface for antinuclear legal efforts to target. Running a reactor for 60 years? 80 years? There is very little that antinukes can do to stop it when the NRC says yes (and the NRC has agreed with its engineers and has said yes over and over).
Balkanizing nuclear regulation by handing it over to overworked and unqualified national or state-level bureaucrats and politicians radically expands nuclear's legal attack surface while making it thin and penetrable.
If I were at the Sierra Club or another antinuclear lobbying organization, I'd be delighted by the openings to attack nuclear energy this creates. You don't have to win your lawsuit against nuclear, you only have to delay it and add uncertainty to kill off a nuclear plant project. This was the playbook that the NRC killed off over time.
Does the NRC need to be reformed? Yes! Can it move faster? Yes! And this reform was happening and so is the speed-up. I've not met any serious, seasoned pro-nuclear expert who doesn't agree. But not a single one thinks the Commission itself should be politized or eliminated.
The NRC in the past has sharply limited the influence of antinuclear politicians from hurting nuclear.
Texas, for example, is attacking the NRC both from a "pro-nuclear" AND an antinuclear position! And we want to trust Texas non-technical lawyers and politicians to not abuse their nuclear power to hurt nuclear if it's politically expedient, as is happening now by trying to block a spent fuel storage facility?
And the vast majority of delays in developing and deploying new nuclear reactors have causes OTHER than the NRC. Developing nuclear reactors that function well is really hard! Building nuclear plants is hard! Blaming the NRC from the outside is easier than learning nuclear engineering or deployment history!
I hate seeing the current nuclear renaissance be jeopardized by ill-considered attacks on perhaps the most nuclear-friendly major regulator in the world.
I work on nuclear energy around the world and though the NRC isn't perfect, for those of us who love nuclear energy and want to expand it, it's better than pretty much any other regulator in a democracy.
I will be speaking out more publicly about this attack on nuclear energy's legal basis in the USA and I ask those who know the truth about this issue but who have not spoken out publicly to make your voices heard.
Lea Booth retweeted
Micro reactor developers and investors have made a purposeful choice to alter the nuclear cost allocation paradigm. They KNOW that their reactors will use an expensive fuel, often Triso-coated fuel particles with HALEU as the uranium component. They might even make it more expensive by choosing a fuel compound that isn’t the industry standard of UO2.
Why would they make such a seemingly illogical choice? Aren’t they giving up one of nuclear energy’s key advantages – cheap fuel?
“Everyone knows” that reactors have very high capital costs per unit of capacity, and that they have very low fuel costs per unit of energy produced.
Those facts combine to produce cost accounts where paying off capital borrowing and the associated interest cost dominate the cost of each kilowatt hour of electricity. Fuel for each kilowatt hour might be just 10-20% of the calculated cost of electricity. This paradigm pushes reactor owners to run their plants at full capacity whenever possible because that helps spread the fixed capital cost over a larger number of kilowatt hours.
But the thermal power plants that customers have proven through their purchase decisions during the past 30 years have much lower capital costs and much more unpredictable – often very high – fuel costs.
With the chosen fuel forms, micro reactor developers – along with several advanced reactor developers – have consciously chosen a route that might end up with reactors that have surprisingly low capital costs enabled by using “the most robust fuel form” available. When full containment of radioactive material is assured by expensively applied coatings on the fuel itself, a large portion of the typical systems, structures and components used in reactor designs are no longer needed.
Low capex, higher fuel costs can be a feature, not a bug.
In the next part of this thread, I’ll provide a link to a more complete exploration of this paradigm-altering design choice. It’s not for everyone, and it might not work, but it isn’t an accident or an illogical product development path.
FUEL COST: A MAJOR CHALLENGE FOR “ADVANCED REACTORS”
MIT professor Koroush Shirvan estimates the following fuel costs per MWh for new fuel contracts in North America with today’s higher enrichment costs and low price of natural gas.
CANDU: $6-8/MWh
LWR: 13-16/MWh
HALEU/TRISO: $30-85MWh
Natural gas: 25-40MWh
A big part of the case for nuclear energy is its low fuel cost about 20-30% of LCOE. This leads to relatively low operational expenses (OPEX) which justify its high capital expense (CAPEX) in the form of highly complex and lengthy construction projects which drives ~60-70% of nuclear LCOE.
The LCOE of fossil plants on the other hand is almost the opposite, dominated by OPEX, primarily as fuel costs.
For instance, a natural gas plant fuel cost represents ~60-80% of the LCOE. A coal plant’s fuel cost is ~40-70%.
A major hurdle, therefore for HALEU/TRISO fuelled “advanced reactor” vendors like @xenergynuclear is that their fuel cost exceeds the fuel cost of natural gas.
This makes the business case for such reactors, whose CAPEX intensive LCOE will be driven up even further by an uncompetitive fuel cost extremely challenging.
For a deeper dive check out the full interview with Koroush on the @DecoupleMedia podcast. Link in replies.
Lea Booth retweeted
“Congratulations to Westinghouse and to AP1000. Let’s build another one, so we can build 10, so we can build 100," says the "Nuclear Congressman," @RepChuck.
I couldn't agree more.
Like I said, we're going to build fleet after fleet of Industrial Cathedrals.
⚔️⚛️⚔️
Lea Booth retweeted
Vogtle took on a lot of heavy lifting for the nuclear industry:
- Re-learning how to build nuclear after decades since the start of construction on the last U.S. reactor
- Re-establishing fractured supply chains
- Training skilled crews that successfully delivered two AP1000 reactors
It’s a tragedy there’s no initiative to capitalize on this hard-won experience.
Without decisive action soon, the benefits of this project — the workers, the supply chains, the learning — will be lost. We’ll be nearly back to square one with the next first-of-a-kind reactor.
Joe Dominguez, CEO of @CEGCleanEnergy, tells @CERAWeek that the Vogtle nuclear project should be seen as a success.
-Unit 4 was 20% less than Unit 3
-$150/MWh is comparable to NY offshore wind prices and far more reliable.
He believes we should have built more AP1Ks immediately
Lea Booth retweeted
Joe Dominguez, CEO of @CEGCleanEnergy, tells @CERAWeek that the Vogtle nuclear project should be seen as a success.
-Unit 4 was 20% less than Unit 3
-$150/MWh is comparable to NY offshore wind prices and far more reliable.
He believes we should have built more AP1Ks immediately
Lea Booth retweeted
At Diablo Canyon, we love the environment and the environment loves Diablo Canyon.
Lea Booth retweeted
We are already counting down the days until NIB2025! There are 2 days left to submit your applications and you don't want to miss out on this opportunity! Click here to apply:
nuclearinnovationbootcamp.or…
Lea Booth retweeted
PROJECT STARGATE ENERGY ANALYSIS
Project Stargate is going to need an enormous amount of power: each of the five Stargates needs about 5 gigawatts (about five million people's worth) of constant electricity for each ~$100b supercomputer project.
Let's break it down.
Each center will want at least 6 GW of firm capacity available, minimum, at all times.
I expect total power costs to run (very roughly) $4 billion per year per Stargate, or about $100 per MWh. For reference, Microsoft is paying a bit more than $100/MWh to get 17% of one Stargate's-worth from restarting Three Mile Island.
This price will allow for building new power plants and securing power from old ones.
This is going to start as a natural gas and coal play. New natural gas turbines from GE-Vernova and others will be the backbone of this effort for the short and medium term.
Combined cycle natural gas plants use a natural gas-burning turbine (much like what powers jetliners), but with the hot turbine exhaust directed onto pipes filled with water, which boils into steam and runs a steam turbine. Combining the gas turbine and the steam turbine gets you above 60% efficiency converting fossil heat into electrical power.
Five GW of efficient gas turbines will need about 0.7 billion cubic feet per day (bcf/day) or 7 billion cubic meters (7 bcm) per year, just under 1% of the USA's current daily production of natural gas. Five of these 5GW centers would require about 4% of America's current natural gas production, if totally fueled by gas.
America currently exports about 10% of its natural gas production. If you are wondering why the "Energy Emergency" Executive Order, here it is: we can't increase gas exports to Europe and Asia while powering Project Stargate without natural gas price increases for Americans, unless we also increase and maintain that increase of natural gas production. Which in turn means we need to expand exploration and drilling straight away, to have the gas in a few years.
A number of coal plants will get a new lease on life, to provide replacement power for the grid, because power from nuclear, gas, and coal plants located close to a new Stargate cluster will be redirected to these centers instead of their existing customers.
Because Stargate will require ultra-firm power at highly concentrated locations, renewables will probably not play a major role in directly powering Stargate except as an accounting fiction to "offset" emissions from the steady fossil power built for each center.
So these companies may pay for some solar somewhere to be built to "lower the carbon" but it'll be even faker than it's been up until now.
NUCLEAR STARGATE?
Nuclear is 4 to 5 years behind where it should be for this exact moment. We can partially blame the companies behind Stargate because until very recently they had superwoke "100% Renewables" policies driven by their marketing/investor relations/ESG teams.
China can build America's best large reactor design in 5 years, plus a few years before that setting up the power plant location. We have lots of locations more or less ready to roll for these exact reactors. Each Stargate would require 6, or three pairs of 2 GW reactors linked together by transmission lines.
Existing nuclear can get small capacity uprates, and we can restart a few reactors in different states. That's not enough, though it will help a bit.
Can we use small reactors? Well, the designs aren't ready yet, so even in an optimistic case we won't get the first tiny prototypes turning on before 2028, and as late as 2031.
It would take 500 little 10 MW reactors running constantly to power a Stargate. It would take 5 large reactors. China will be building ten of these per year, year after year, by 2030.
I expect Stargate participants to make bets on one or more microreactor and small reactor plays just in case.
If we can get ready to build large reactors straight away, and if the US government supports with loans, we can aim to replace natural gas plants and retire the old coal plants ten years from now with new large reactors. To make this "gas first, then uranium" policy work, Stargates and their new gas plants will have to be sited near transmission corridors connecting them to nuclear plants ready to host new reactors.
Each Stargate would require 5% of America's current nuclear fleet to run, but there are only a few clusters of reactors close enough together to power a full center today.
More later.
Announcing The Stargate Project
The Stargate Project is a new company which intends to invest $500 billion over the next four years building new AI infrastructure for OpenAI in the United States. We will begin deploying $100 billion immediately. This infrastructure will secure American leadership in AI, create hundreds of thousands of American jobs, and generate massive economic benefit for the entire world. This project will not only support the re-industrialization of the United States but also provide a strategic capability to protect the national security of America and its allies.
The initial equity funders in Stargate are SoftBank, OpenAI, Oracle, and MGX. SoftBank and OpenAI are the lead partners for Stargate, with SoftBank having financial responsibility and OpenAI having operational responsibility. Masayoshi Son will be the chairman.
Arm, Microsoft, NVIDIA, Oracle, and OpenAI are the key initial technology partners. The buildout is currently underway, starting in Texas, and we are evaluating potential sites across the country for more campuses as we finalize definitive agreements.
As part of Stargate, Oracle, NVIDIA, and OpenAI will closely collaborate to build and operate this computing system. This builds on a deep collaboration between OpenAI and NVIDIA going back to 2016 and a newer partnership between OpenAI and Oracle.
This also builds on the existing OpenAI partnership with Microsoft. OpenAI will continue to increase its consumption of Azure as OpenAI continues its work with Microsoft with this additional compute to train leading models and deliver great products and services.
All of us look forward to continuing to build and develop AI—and in particular AGI—for the benefit of all of humanity. We believe that this new step is critical on the path, and will enable creative people to figure out how to use AI to elevate humanity.
Lea Booth retweeted
We will build these reactors again in America.
It's not magic. It took China nearly as long to build their first ones as it did for us.
Now there is a completed design. We didn't have that the first time, and yes, it really, really matters.
We have it now.
Watch us build.
Lea Booth retweeted
You heard it here first! The Nuclear Innovation Bootcamp is heading to Australia in 2025! Applications open on January 1st. Click here to learn more:
nuclearinnovationbootcamp.or…
Lea Booth retweeted
⚛️ REQUEST FOR THE NUCLEAR INDUSTRY:
I’m very concerned about minimizing competition between my daughters.
Please invite me to your plant, laboratory, or waste facility so Bebe2 can have her fair share of nuclear bump pictures.
newsweek.com/pregnant-woman-…







































