Marcus (@MarcusVanCan) header
Marcus (@MarcusVanCan) profile picture

Tesla Investor / X Explorer / Science & Nature / TSLA

Vancouver
Joined January 2020
Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)Photo by Marcus (@MarcusVanCan)
Replying to @elonmusk
Tesla Energy Tesla Solar Tesla Megapack Tesla FSD Tesla Fleet Tesla Semi Tesla Robotaxi Tesla Robotics Tesla Insurance Very likely that Elon is correct for TSLA 2030 tesla.com/
4
2
1
38
1,770
In all colors, as long as it's white @navierboat @Tesla
4
96
Coming to Marina near you soon
1
53
Should Tesla invest in:
0%xAI
0%Starlink
0%Navier
0%All of the above
0 votes • Final results
33
Could drones manufactured in the USA be a Tesla product?
42
Will Tesla manufacture drones?
3
41
Replying to @elonmusk
Tesla Energy Tesla Solar Tesla Megapack Tesla FSD Tesla Fleet Tesla Semi Tesla Robotaxi Tesla Robotics Tesla Insurance Very likely that Elon is correct for TSLA 2030 tesla.com/
15
July 4th fire works
25
This is beautiful engineering! teapawt.net/teslaenergy/status/180…
Common areas at Rivière apartment building are powered by 9 Powerwalls and solar energy
1
36
RIP Inflation 💀
16
Money-printing ponzi explained in under 2 minutes [my portion].
13
Buddy advises the president on economic policy. We might be cooked bros 😭
23
BREAKING: @Tesla has secured a new ~$650 million contract to build the largest battery energy storage system in Australia, over twice the size of the storage system pictured below. It will mean the Neoen Collie battery will be sized at a total 560 MW & 2,240 MWh. This $650M contract means French developer Neoen will add a 341 MW/1363 MWh second stage battery to the Collie facility. Its first stage, already under construction, is sized at 219 MW/877 MWh. Both are to be built with a total of ~572 Tesla Megapack batteries, making it a massive ~$1.1 billion project. When complete, the Collie battery will have the ability to charge and discharge 20% of the average demand in Western Australia's main grid. (Photo below is a Megapack system in Phoenix & not the Collie facility. It's just for reference) Source: reneweconomy.com.au/neoens-c…
18