New rod ends & anti roll bar drop links have arrived, with 4 brand new SKF wheel bearings! She's gonna ride very freely with these I hope!
All rear suspension parts have been shot blasted and first coat of #POR15 has been put down. Really happy with how they came out
The engine rebuild is progressing and should be ready to collect next week. Head skimmed, piston rings&cam shells new & bottom end balanced.
Complete #Honda gasket kit is now at EDS along with new head bolts bottom end bolts and clutch plate bolts. Busy weekend ahead!
1
Bottom end is being balanced. #Fidanza 3.6kg flywheel, new fly bolts & #Exedy stage 1 clutch delivered to EDS Monday. Thanks @MikeJones66
Glad we had the engine checked out now, whiles in a million bits it would be a shame not to give it a birthday.....
With the #K20 having a "once over" last week Richard at EDS found the beginnings of a blown head gasket! Bullet dodged
1
Old ball joints and bushes have all been removed and this lot has been taken for shot blasting today.
The rear uprights are in need of some serious love! I pressed the old bearings out today and they have been dropped off for shot blasting.
1
The rear lower wishbone forward brackets where removed from the chassis and I'm halfway thru refreshing them.
1
After a few days off for Christmas I removed the rear bulkhead heat shield on Tuesday and gave everything a good clean up!
2
Managed to get the front back together for the journey to its new home for a few weeks! Dampers, steering rack and links still to do!
Before and after shot blasting. Pretty happy so far! Applying #POR15 treatment to all front suspension steel today.
#Honda g/box split last night for a once over! 3rd-4th synchro and hub worn so they will all be replaced along with new bearings all round.