PumpPoly Development Update October 26, 2026
Hey PumpPoly Community! π
We've reached another major milestone in development.
πSecurity Review Preparation READY
Our latest unified review candidate is now prepared, covering:
π£ Solana , Launchpad + Native DEX
π΅ Base, Launchpad + Native DEX
β« Robinhood Chain, Launchpad + Native DEX
The package includes our smart contracts, financial backend, indexers, database components, and reproducible test evidence.
Major Solana Performance Milestone
After extensive engineering, optimization, and testing, our latest local qualification results are:
β
S04 Performance qualification completed
β
Full V4 load qualification completed
β
30-stage fee economy implemented
β
Creator Rewards and fee discounts
β
Native DEX graduation and liquidity mechanics
β
Project ownership transfer
What's Next?
We're moving toward independent external security review, followed by final production infrastructure checks, real-wallet testing, and controlled deployment preparation.
Security comes first. We're not rushing mainnet at the expense of user funds or protocol reliability.
One platform. Three blockchains. A complete Launchpad-to-DEX ecosystem.
We're building PumpPoly for the long term.
Thank you for being part of the journey! π
More updates coming soon.
#PumpPoly #Solana #Base #DeFi #Crypto
PumpPoly Development Update π
PumpPoly is entering a more integrated stage of development.
The core systems are being brought together into one continuous lifecycle:
Launch
β’ Trade
β’ Graduate
β’ Migrate Liquidity
β’ Native DEX
β’ Rewards
β’ Recovery
Instead of treating the launchpad, DEX, rewards and infrastructure as separate products, weβre building them to operate as one coordinated trading environment across Solana + Base.
Current work is focused on:
β’ tighter launchpad + DEX integration
β’ graduation and liquidity migration flows
β’ unified rewards accounting
β’ stronger indexer consistency
β’ recovery and service continuity
β’ production-grade monitoring and infrastructure
β’ a cleaner, more connected trading experience
The direction has always been bigger than launching tokens.
PumpPoly is being built around the entire lifecycle of a market, from creation to long-term trading.
One platform.
One lifecycle.
Solana + Base. π£
#PumpPoly #Solana #Base #DeFi #DEX #Robinhoodchain
5
152
PumpPoly π
Verifiable Build evidence.
Instead of asking you to trust development screenshots, hereβs what can already be checked publicly, and what is still being tested before we call PumpPoly mainnet-ready.
ON-CHAIN BASE MAINNET
PumpPoly FactoryUpgradeable Proxy
0x84Af3ACE5d5A45aFc12dbef51eEd3B077341c730
Factory Implementation
0xf0eb4b94780f46094a89e3d9c6d79fd6d8495337
RewardClaim
0xb56BB863A8fC4a54267ac07A9AE151a770E4a38e
Paste the addresses into BaseScan.
You can independently inspect the deployed bytecode, proxy state, transactions and contract activity.
ON-CHAIN SOLANA MAINNET
PumpPoly Launchpad Program
7jgvVcBnapgriRY2PeLK2x7NaZ2UxpvZhaZkoxjLWVmU
Paste the Program ID into Solscan.
The public program account can be inspected directly on-chain.
LATEST ENGINEERING CHECKPOINT
3,059 PASS
0 FAIL
0 SKIP
Coverage across the latest confirmed suites included:
β backend + PostgreSQL
β frontend
β Base
β Solana/SBF
More importantly, we are testing complete economic flows β not isolated buttons.
Confirmed test scenarios now include:
β Phantom create β buy β sell
β Creator Rewards claim
β Trader Rewards claim
β graduation β PumpPoly DEX trading
β lost RPC-response recovery
β PostgreSQL/API restart recovery
β duplicate-accounting protection
The indexer has also been exercised under backlog and failure conditions, including a 2,100-transaction scenario with injected failures settling without duplicate accounting.
WHAT WE ARE NOT CLAIMING
The new PumpPoly native DEX stack is not being presented as fully mainnet-ready yet.
That distinction matters.
Development proof β deployment proof.
Local E2E proof β production qualification.
We will publish the new DEX deployment addresses only when the corresponding production gates actually pass.
CURRENT SECURITY, PRODUCTION GATES
Remaining critical work:
β production RPC capacity + failover qualification
β full real-wallet Solana E2E
β full Base wallet / proxy / storage E2E
β graduation + liquidity migration fault injection
β exactly-once accounting / reconciliation
β fuzz + invariant + adversarial testing
β release artifacts + deployment rehearsal
β rollback verification
β final mainnet security gate
PumpPolyβs intended lifecycle remains:
Launch β Trade β Graduate β Migrate Liquidity β Native DEX β Dynamic Fees β Rewards
Solana + Base.
Weβll keep publishing evidence as more of the stack becomes publicly verifiable.
Donβt trust the roadmap.
Verify what exists.
Build it.
Break it.
Recover it.
Verify it.
Then ship it.
#PumpPoly #Solana #Base #DeFi #DEX
2
123
PumpPoly Development π
Update 18 September 2026.
Since our last on-chain update on September 13, weβve continued pushing the full PumpPoly flow forward across both Solana and Base.
We are now testing the entire journey from launching a token, through trading and graduation, all the way to our native DEX and Creator + Trader Rewards.
On Solana, we tested real Phantom wallet interactions against a local validator. Token creation, buys, sells and both Creator and Trader Rewards claims worked as expected.
We also tested rejected transactions to make sure balances and accounting stayed unchanged.
Graduation into the DEX was tested separately, including buying and selling after graduation.
We also ran recovery scenarios where an RPC response was lost or the PostgreSQL/API stack restarted. The system recovered without creating duplicate accounting entries.
Security testing has been expanded as well.
We added more regression coverage around reward authorization, replay protection, fee calculations, liquidity accounting and dynamic DEX fee transitions using TWAP, hysteresis and minimum waiting periods.
We also continued improving wallet integration, frontend reliability, release configuration, migrations, backups and restore procedures.
Internal test runs.
β’ Backend + PostgreSQL: 1,558 passed
β’ Frontend: 946 passed
β’ Base contract suite: 475 passed
β’ Solana AMM: 80 passed in the SBF execution profile
Every test run listed above finished with zero failures and zero skipped tests.
These are separate internal development test runs. They are not an external security audit and they do not mean the full V2 release is already certified for mainnet.
Some of our existing deployments can already be inspected publicly on-chain.
π΅ Base mainnet
Existing Launchpad Factory proxy and linked FactoryUpgradeable implementation.
π΅ Base mainnet
Existing legacy RewardClaim contract with verified source, ABI and transaction history.
π£ Solana mainnet
Existing launchpad program where executable status, upgrade authority and deployment history can be inspected.
These explorer records confirm the existing deployments. They do not verify our latest internal test results and they do not mean the new DEX V2 release is already live.
What remains now is mainly sustained RPC and indexer load qualification, legacy settlement work, the remaining wallet E2E scenarios and the final security and release gates before mainnet cutover.
The direction stays the same.
Free launch. Trading. Graduation. Native DEX. Creator Rewards. Trader Rewards.
One connected PumpPoly ecosystem across Solana and Base. π£
#PumpPoly #Solana #Base #DEX #BuildInPublic
1
83
Mining PumpPoly live. βοΈπ
Planet Mining is more than just clicking, itβs a game, a grind, and a race to stack points early.
Jump in, start mining, play the game, and join the people getting in before the crowd.
The more players, the more fun.
Whoβs coming to mine with us?
pumppoly.com
#PumpPoly #Web3Gaming #Crypto #Solana #Base
1
2
110
PumpPoly
PUBLIC ON CHAIN PROOF OF WORK
Weβve talked a lot about building.
This time, here are public identifiers you can verify yourself.
ββββββββββββββββββ
π΅ BASE MAINNET
ββββββββββββββββββ
Network: Base
Chain ID: 8453
PumpPoly current Base launchpad FactoryUpgradeable proxy:
0x84Af3ACE5d5A45aFc12dbef51eEd3B077341c730
Factory implementation resolved from the ERC-1967 implementation slot:
0xf0eb4b94780f46094a89e3d9c6d79fd6d8495337
PumpPoly RewardClaim:
0xb56BB863A8fC4a54267ac07A9AE151a770E4a38e
Our direct mainnet RPC verification checkpoint confirmed:
β Factory proxy bytecode present
β Factory implementation bytecode present
β RewardClaim bytecode present
β proxy β implementation relationship resolved on-chain
These are public blockchain addresses.
Paste them into BaseScan or another Base explorer and inspect them yourself.
ββββββββββββββββββ
π£ SOLANA MAINNET
ββββββββββββββββββ
PumpPoly Launchpad Program ID:
7jgvVcBnapgriRY2PeLK2x7NaZ2UxpvZhaZkoxjLWVmU
Direct mainnet inspection confirmed the program account as executable under Solanaβs upgradeable BPF loader.
Again:
donβt trust the post.
Check the Program ID yourself on Solscan or another Solana explorer.
ββββββββββββββββββ
IMPORTANT DISTINCTION
ββββββββββββββββββ
These addresses prove existing PumpPoly production infrastructure.
They are NOT being presented as proof that the new PumpPoly native DEX V2 stack is already fully deployed to mainnet.
Weβre deliberately keeping those claims separate.
The new launchpad β graduation β liquidity migration β native DEX β rewards architecture is going through its own production and security gates.
When that deployment reaches the required verification standard, we intend to publish its public contract/program registry the same way.
Address.
Network.
Role.
Deployment evidence.
On-chain state.
No mixing development milestones with deployment claims.
ββββββββββββββββββ
WHAT WEβRE BUILDING TOWARD
ββββββββββββββββββ
PumpPoly is being engineered as one continuous market lifecycle:
Launch
β
Bonding Curve
β
Trading
β
Graduation
β
Liquidity Migration
β
PumpPoly Native DEX
β
Dynamic Fees
β
Creator + Trader Rewards
Pre-graduation trading is designed around the 1.10% fee model:
0.45% β Creator Rewards
0.30% β Trader Rewards
0.27% β PumpPoly
0.08% β DEX Liquidity Reserve
Post-graduation, the design moves to dynamic DEX fees rather than keeping the launchpad fee permanently.
And accounting is being built around one hard rule:
The frontend may DISPLAY balances and rewards.
It must never AUTHORIZE or INVENT them.
That means the production path is being hardened around:
β no double claims
β replay resistance
β deterministic fee accounting
β authoritative settlement
β finality-aware indexing
β graduation atomicity
β rollback testing
β E2E testing
β invariant testing
β fuzz testing
β adversarial testing
ββββββββββββββββββ
NEXT
ββββββββββββββββββ
The critical path remains:
graduation
β liquidity migration
β native DEX integration
β rewards
β indexer
β production reconciliation
β full E2E
β security gates
β mainnet cutover
And when the next-generation contracts/programs are ready for public verification, weβll publish those addresses too.
Until then, we wonβt call development code βmainnetβ just because it makes a better post.
Build it.
Test it.
Attack it.
Verify it.
Then ship it.
PumpPoly.
Solana + Base.
#PumpPoly #Solana #Base #DeFi #DEX
π€ Made with AI
1
93
βοΈ Mining has officially started.
The first miners are already carving into the PumpPoly
Planet and collecting points.
60,000,000 blocks.
1,100,000 points hidden across the planet.
One shared world for everyone.
Pick your sector. Start mining. Build your position before the crowd arrives. π
The planet is live. pumppoly.com
#PumpPoly #CryptoMining #Web3 #DeFi #Crypto
82
π PLANET MINING IS LIVE.
The PumpPoly community can now start mining.
βοΈ Break the Planet
β Find PumpPoly Points
π₯ Build your team
π Get ready for the $PPOLY launch
1 PumpPoly Point = 1 $PPOLY at the Token Generation Event.
Points are tied to your account and subject to eligibility and anti-abuse verification.
The Planet is open.
Start mining π
pumppoly.com
#PumpPoly #PPOLY #Web3 #Crypto #DeFi
1
1
104
The last 4 days on PumpPoly were mostly about closing things properly.
A few concrete milestones:
β Two defects found during the latest release review were reproduced, fixed and covered in the next forward-only release
β Full PostgreSQL 17 validation passed: 589/589
β The affected backend regression run completed with 0 failures
β Another Solana release package was independently re-verified from its frozen source
β The Base graduation / liquidity migration review was completed with no P0βP2 security findings
β Several recovery, database integrity and release-safety paths were validated again before moving forward
This isnβt the most visible part of building PumpPoly, but itβs one of the most important.
At this stage Iβd rather spend another day proving something is correct than spend a month explaining why it broke on mainnet.
More pieces are now closed, fewer unknowns remain, and the path to the final DEX + launchpad integration is getting much cleaner.
Back to building. π
#PumpPoly #Solana #Base #DeFi
PumpPoly, Public Build Evidence #01
Less βtrust usβ.
More verifiable evidence.
Weβve started publishing technical proof behind the work being done on PumpPoly.
BASE MAINNET
Dedicated PumpPoly Base V2 deployer:
0x00D66A168729CCF4ddB3fd56a36800fF334C65B2
Our V2 deployment used the deterministic nonce sequence 0 β 9 for 10 core contracts.
Anyone can inspect the address and its contract-creation history directly on Base.
β
SOLANA MAINNET
PumpPoly live Solana program:
7jgvVcBnapgriRY2PeLK2x7NaZ2UxpvZhaZkoxjLWVmU
ProgramData:
3bUXbxHwGqmRCric3Jf1EiWDsMwzq6CK4iQrsqjmP24v
The program is executable on Solana mainnet and its activity is publicly visible on-chain.
β
SOURCE INTEGRITY
We also preserve cryptographic fingerprints of reviewed source packages.
Base contracts SHA-256:
cb8dab3d799db3d680b5fd6742a3a249e3899a84330f88a9bb1363121fa6ebea
Solana contracts SHA-256:
f19d074f4eeb942049f62bef7136c4c407571faa1ccffa624af129094c00558e
These hashes are commitments to exact source snapshots β they can later be matched byte-for-byte against published artifacts.
β
Next step:
Weβll publish a complete PumpPoly deployment manifest containing:
β contract addresses
β deployment transaction hashes
β runtime code hashes
β chain IDs
β authority/Safe bindings
β release commit
β verification status
No private keys.
No seed phrases.
No infrastructure secrets.
Just independently verifiable build evidence.
We shipping π
#PumpPoly #Solana #Base #DEX #DeFi
80









