Not Pac-Man (@ReallyPacMan) header
Not Pac-Man (@ReallyPacMan) profile picture

Take profits, not screenshots. 💊 (Parody)

Decentralized
Joined February 2025
Not Pac-Man retweeted
Before Doge, there was Mitsuki. 🌕🐕 According to records uncovered during our visit to Chiba, Japan, Mitsuki (みつき) may have been Kabosu's original name before she became the Doge the world knows today. $MITSUKI is our tribute to the beginning of one of crypto's greatest stories.
7
4
16
437
Not Pac-Man retweeted
The other side of home 🌍 Captured from Integrity
2
5
6
115
Not Pac-Man retweeted
During their lunar flyby, the Artemis II crew captured a stunning view of the Orientale basin’s rings.
3
7
9
114
Not Pac-Man retweeted
Inside mission control, every crew observation sparks new insight. Artemis astronauts are identifying subtle lunar color variations—key to understanding the Moon’s composition and age.
3
6
9
135
Not Pac-Man retweeted
You can now track the Artemis II moon mission in real time on our website 🚀 artemisii.space/
4
7
2
12
168
Not Pac-Man retweeted
Halfway to the Moon 🌖
We’re halfway there. At the time of posting this, the Artemis II mission is about halfway to the Moon. When the astronauts arrive, they will conduct a lunar flyby and collect scientific observations of the Moon’s surface.
1
3
4
112
Not Pac-Man retweeted
From footprints to foundations
5
6
9
119
Not Pac-Man retweeted
Gm It's going to back to the $Moon season.. Artemis II on eth is a solid play I aped ahead of this biggest historical event. 0x6eA8A0E00cfC0B21C820036CF48149219A7517f5 @ArtemisIIETH
4
5
1
7
189
Not Pac-Man retweeted
A quiet step forward — and a powerful reminder of what we’re capable of together. Humanity returns to the Moon not to conquer, but to build, to learn, and to extend the frontier a little further than before. Some of us have been positioning for this moment — not just watching history, but aligning with it. The next chapter isn’t coming. It’s already underway. 🌑🚀 #Artemis #ToTheMoon #MOON
3
3
6
52
Tracking progress as it happens. 🚀
Lead flight director Jeff Radigan informs the Artemis 2 crew that the Mission Management Team has given a go for TLI – the Trans-Lunar Insertion burn. The burn will place Orion Integrity on a trajectory that will loop it around the far side of the Moon and back to Earth.
4
3
1
6
115
Not Pac-Man retweeted
Leadership sets the direction. Execution follows teapawt.net/nasaadmin/status/20398…
Artemis II showed a new generation what’s possible. Millions watched as humans began the journey back to the Moon. The engineers, explorers, and astronauts who will build the Moon base and go to Mars are watching today. This is how the next era of exploration begins.
4
4
5
73
Not Pac-Man retweeted
🧵 How does deep-space radiation shielding actually work? ☢️🚀
4
3
7
141
Not Pac-Man retweeted
Exploration is not optional. It’s inevitable!
7
6
1
12
142
Not Pac-Man retweeted
🧵 How Artemis Il will orbit the Moon and return safely
12
6
14
244
Not Pac-Man retweeted
1972 was the last time humans traveled this far. That changes soon.
5
7
12
219
Not Pac-Man retweeted
A history in making Once in a life time opportunity to make it Ape $Moon on eth the strongest token for Artemis II out there
🇺🇸 NASA astronauts prepares for the Artemis II launch, with astronauts suiting up for a mission aimed at taking humans deeper into space than ever before. Artemis II is the first crewed U.S. mission beyond low Earth orbit since Apollo 17 in 1972.
8
9
12
415
Not Pac-Man retweeted
The view never gets old
6
9
15
186
Not Pac-Man retweeted
CA: 0x6eA8A0E00cfC0B21C820036CF48149219A7517f5
8
3
2
17
1,213
🚨 Artemis II Update🚨 — 2nd Wet Dress Rehearsal Confirmed For Thursday February 19th NASA has announced the second Wet Dress Rehearsal (WDR) of the Space Launch System for Artemis II will begin on Tuesday Feb 17th, with a simulated T-0 of 8:30pm EST on Thursday Feb 19th. 🕒 Launch Controllers Call To Stations : 6:40 PM EST (Feb 17th) 🎯 Simulated T-0 : 8:30 PM EST (Feb 19th) with 4 hour window During the test, teams will run two “terminal count” simulations — pausing at T-1:30 and again near T-33 seconds, then recycling the clock back to T-10 minutes to simulate a real launch scrub scenario. Although the Artemis II astronauts won’t participate, pad crews will rehearse Orion hatch closeout operations just like on launch day. The rehearsal will be a full launch simulation, including: • Loading super-cold cryogenic propellants into SLS • Running the full launch countdown • Practicing countdown holds & scrubs • Recycling the clock and draining the tanks Following last week’s partial fueling test, teams replaced a ground support equipment filter that had restricted liquid hydrogen flow. The line has now been reconnected and engineers are restoring proper environmental conditions at the pad. FOLLOW for latest Artemis II Updates! because we’re going back to the Moon, together. 🌙🚀 #ArtemisII #NASA #SLS #Orion #WeAreGoingBack
5
72
9
303
11,344
Not Pac-Man retweeted
As NASA prepares for the launch of Artemis II the most historic event of this century… Our team is preparing too... Artemis II token on Ethereum ready to launch and head to the moon right alongside it. 🚀
🚨 Artemis II Update🚨 — 2nd Wet Dress Rehearsal Confirmed For Thursday February 19th NASA has announced the second Wet Dress Rehearsal (WDR) of the Space Launch System for Artemis II will begin on Tuesday Feb 17th, with a simulated T-0 of 8:30pm EST on Thursday Feb 19th. 🕒 Launch Controllers Call To Stations : 6:40 PM EST (Feb 17th) 🎯 Simulated T-0 : 8:30 PM EST (Feb 19th) with 4 hour window During the test, teams will run two “terminal count” simulations — pausing at T-1:30 and again near T-33 seconds, then recycling the clock back to T-10 minutes to simulate a real launch scrub scenario. Although the Artemis II astronauts won’t participate, pad crews will rehearse Orion hatch closeout operations just like on launch day. The rehearsal will be a full launch simulation, including: • Loading super-cold cryogenic propellants into SLS • Running the full launch countdown • Practicing countdown holds & scrubs • Recycling the clock and draining the tanks Following last week’s partial fueling test, teams replaced a ground support equipment filter that had restricted liquid hydrogen flow. The line has now been reconnected and engineers are restoring proper environmental conditions at the pad. FOLLOW for latest Artemis II Updates! because we’re going back to the Moon, together. 🌙🚀 #ArtemisII #NASA #SLS #Orion #WeAreGoingBack
7
7
1
13
591