TalkingLands (@TalkingLands) header
TalkingLands (@TalkingLands) profile picture

The Full-Stack Property Super Platform. One AI Engine. Infinite Insights. Location Intelligence | Instant Property Report | Verified properties

Bengaluru, India
Joined June 2021
Kengeri to Whitefield in one train? 🚆 Parijaata suburban line: 35 km via KSR, Cantonment, Baiyappanahalli 🔍 Land survey stage, tender not floated ⏳ Per reports: 2029 or later Next to the track? Check the acquisition zone 👉 insights.talkinglands.com/ap… #Bengaluru #SuburbanRail
2
161
Green Line to Harohalli? 🚇 📏 Today: 33 km, 32 stations ➡️ Proposed: Silk Institute to Harohalli via Kaggalipura, 24 km 🔍 Status: feasibility study 🌳 Forest and eco-sensitive zones near the route Check before you buy 👉 insights.talkinglands.com/ap… #NammaMetro #KanakapuraRoad
254
📍 Bidadi township: final notification out for 1,895 more acres (Byramangala, Kanchugaranahalli). 7,300+ acres now notified for GBDA's integrated township. Is your survey no. inside? Check on TalkingLands Insights 🛰️ insights.talkinglands.com/ap… #Bidadi #GBDA #Bengaluru
6
546
Going to the airport? Try the train 🚆 Sampige suburban line: KSR Bengaluru to Devanahalli, 41 km 🔍 Land survey stage, tender not finalised ⏳ Per reports: 2029 or later Property near the track? Check the acquisition zone 👉 insights.talkinglands.com/ap… #Bengaluru #SuburbanRail
4
264
Purple Line to Bidadi? 🚇 📏 Proposed ~15 km extension from Challaghatta 🔍 Feasibility stage: not approved, no construction date ⚠️ Watch low-lying areas near Byramangala lake Don't buy land just for a metro. Check the spot 👉 insights.talkinglands.com/ap… #Bidadi #NammaMetro
2
36
4,875
Tumkur Road traffic 🚗 Fresh tender for a ~500 m split flyover at MEI Junction 💰 ₹41.62 Cr + GST 🏗️ 30 months to build 📅 Bids opened 13 Nov 🔗 Eases Peenya–Yeshwanthpur traffic See what's planned near you 👉 insights.talkinglands.com/ap… #Bengaluru #TumkurRoad
15
1,514
New metro near your plot? The government can notify it first 📄 🚇 Metro Phase 3 notification: 170 properties, JP Nagar to Mysore Road 🛣️ Intermediate Ring Road: plan not approved yet Check if your survey no. is on the list 👉 insights.talkinglands.com/ap… #Bengaluru #NammaMetro
4
519
Namma Metro Phase 3: 44 km, 31 stations 🚇 🟠 Orange Line along ORR West ⚪ Silver Line along Magadi Road 📅 Land being notified now, target ~2032 One spot ~400 m from Sumanahalli Cross station sits in a Rajakaluve buffer ⚠️ Check first 👉 insights.talkinglands.com/ap… #NammaMetro
5
716
134 km ring road, Anekal to Nelamangala 🛣️ When will it be ready? 💰 ₹1,100 Cr released this week 📊 Sanctioned at ₹2,300 Cr in 2017, now revised to ₹3,400 Cr ⏳ Still no completion date Check the Ring Road layer near your land 👉 insights.talkinglands.com/ap… #Bengaluru
1
6
2
65
15,821
Bidadi land acquisition: final notification issued 30 Oct 📍 🗺️ Kanchugaranahalli + Byramangala 📏 1,895 acres for Greater Bengaluru Integrated Township 🤝 Eligible landowners may get developed sites + compensation Is your survey no. inside? 👉 insights.talkinglands.com/ap… #Bidadi
1
4
676
Metro coming? Check land acquisition first. Notifications are out: Orange Line (ORR West) 130 parcels, Silver Line (Hosahalli–Kadabagere) 407 parcels, plus Pink and Purple line pockets. Don't decide only because metro is coming: insights.talkinglands.com
2
596
Buying land near Bengaluru's Suburban Rail corridors? 3 of 4 lines have notified land, from Kanaka Line (189 parcels, 2.91 ha) to Mallige Line (152 parcels, final notification). Notified doesn't mean acquired. Check your survey no.: insights.talkinglands.com
2
8
956
Buying land near Hoskote? Check the proposed roads first. 30 m, 45 m and 100 m roads are planned here. If your land is on the alignment, approvals can be rejected and the land stays frozen. A road nearby can lift value. Check before you invest: insights.talkinglands.com
1
5
648
Own a plot on Bengaluru's outskirts? 4 new metro routes are proposed: Bommasandra–Attibele Silk Institute–Harohalli Challaghatta–Bidadi KR Puram–Hoskote All still at feasibility stage. Proposal ≠ approval. Check the routes: insights.talkinglands.com
7
1,057
Stuck at Konanakunte Cross every day? A ~1.5 km elevated corridor is proposed on Kanakapura Road by B-SMILE, and the tender has been revised. Better connectivity can lift demand, but it's proposed, not built. See what's planned near you: insights.talkinglands.com
3
497
Waited since January to buy a flat near Dommasandra? That wait cost you ~16% more. Why: BDA Special Development Zone, Wipro and RGA Tech Park nearby, the Hebbal–Sarjapura Metro awaiting approval, and Gunjur road going 2 to 4 lanes. insights.talkinglands.com
5
869
Namma Metro Phase 3: 44.65 km, 31 elevated stations, along ORR West and Magadi Road. Cabinet approval Aug 2024. Foundation stone Aug 2025. Revised design Sep 2026. Approved, not built. Check how far your plot is from the line: insights.talkinglands.com
11
976
Road on YOUR land? BMRDA's new road grid outside GBA limits links to state highways, PRR and STRR. Near Yelahanka, land in a road corridor must stay vacant and approvals can be rejected. Check before you invest: insights.talkinglands.com
2
9
1,016
Bengaluru's 2041 Master Plan and new road grid are on the way. Until it's notified, the current plan decides what you can build. Plots on 9 m+ roads could get +0.6 extra FAR; sites in a proposed road's path could lose land. Check your zone and roads: insights.talkinglands.com
9
40
5,129
Where Bengaluru prices rose most in a year 📈 KR Puram +20%, Yelahanka +18%, Tumkur Rd +16%, Marathahalli +15%, Whitefield +14%. Sarjapur Rd just +3%. (Knight Frank, year to June 2026) Metro + Ring Road layers Check any area: insights.talkinglands.com/ap… #Bengaluru #RealEstate
2
4
1,032