Tay Bridge Tweeter (@TayBridgeTweets) header
Tay Bridge Tweeter (@TayBridgeTweets) profile picture

Completely and utterly unofficial. Created by @mealybar

Between Dundee and Newport
Joined December 2011
Tay Bridge Tweeter retweeted
Gotta go round by Perth if anyone is looking to cross the Tay Bridge tonight. Trailer been blown over 😬🙈 #Dundee #TayBridge #Fife
Update, Bridge will be closed for a considerable time in both directions. We advise all motorist to divert via Perth. Walkway will remain closed as well.
2
3
7
Tay Bridge Tweeter retweeted
Further update. It is anticipated that the bridge will be closed for at least 4 hours. Vehicle recovery, Lampost inspections and walkway damage to be dealt with, as well as high winds. Divert via Perth.
5
23
36
Tay Bridge Tweeter retweeted
Update, Bridge will be closed for a considerable time in both directions. We advise all motorist to divert via Perth. Walkway will remain closed as well.
11
36
4
36
Tay Bridge Tweeter retweeted
Incident – The Bridge is Closed in Both Directions.
24
7
3
31
Tay Bridge Tweeter retweeted
For Information: Permitted to cross during "cars only" Cars without trailers Cars without loaded roof racks Transit van style – with no modifications or raised roof line and no loaded roof racks Single Decker Buses (defined as 11 ton 45-49 seats and low floor 9.5 ton 42 seats)
1
5
15
Tay Bridge Tweeter retweeted
Southbound open. No restrictions on Bridge. Thank you all for your co-operation.
1
1
1
15
Tay Bridge Tweeter retweeted
Police incident. Bridge closed in both directions.
1
7
3
16
Tay Bridge Tweeter retweeted
NOTE: The Police have asked us to close our Aberdeen Off Ramp (East Bound) to Dock Street, Dundee, due to a dangerous building. Traffic Management will be in place. We will need to carry out a short term northbound closure to facilitate the ramp closure.
1
15
2
15
Tay Bridge Tweeter retweeted
PLANNED BRIDGE CLOSURE: We will be closing the bridge in the early hours of Wed 4 Aug between 1230am and 5am to facilitate joint repairs. Emergency vehicle access will be maintained and the walkway will remain open at all times. We apologise for any inconvenience this will cause.
2
1
Tay Bridge Tweeter retweeted
PLANNED BRIDGE CLOSURE: We will be closing the bridge to allow us to undertake essential carriageway repairs in the early hours of 4 June, 1230am to 4am. Emergency vehicle access will be maintained at all times. More information at: https://teapawt.net/t.co/Ktldxv5oC7
Tay Bridge Tweeter retweeted
ADVANCED NOTICE OF NIGHT TIME BRIDGE CLOSURES The bridge will be closed for essential joint repairs on Tuesday 12, Wednesday 13, and Thursday 14 January (midnight to 5am). We apologise for any inconvenience this will cause. See link for details: https://teapawt.net/t.co/JcJ7BE836H
1
9
3
10
Tay Bridge Tweeter retweeted
The Tay Road Bridge will be closed during the early hours of Wednesday 29, Thursday 30 and Friday 31 Jan 2020 from midnight to 0500hrs for the essential replacement of joints. The walkway will remain open and access for emergency services will be maintained at all times.
1
16
9
Tay Bridge Tweeter retweeted
PERMITTED TO CROSS: Cars without trailers Cars without loaded roof racks Transit van style – with no modifications or raised roof line and no loaded roof racks Single Decker Buses (defined as 11 ton 45-49 seats and low floor 9.5 ton 42 seats) (14:56 15/01/2020)
1
6
2
Tay Bridge Tweeter retweeted
High winds – BRIDGE OPEN TO CARS AND SINGLE DECKER BUSES ONLY - 30 mph speed restriction in place. CENTRAL WALKWAY CLOSED. (14:55 15/01/2020)
4
1
Tay Bridge Tweeter retweeted
High Winds – Bridge Closed to Double Decker Buses, 30mph speed restriction in place (04:30 14/01/2020)
1
1
Tay Bridge Tweeter retweeted
Permitted to cross: Cars without trailers Cars without loaded roof racks Transit van style – with no modifications or raised roof line and no loaded roof racks Single Decker Buses (defined as 11 ton 45-49 seats and low floor 9.5 ton 42 seats) (14.36 07.01.2020)
1
7
4
Tay Bridge Tweeter retweeted
The bridge will not close at any time tomorrow (Friday 9 Aug), but please do expect some delays around the Dundee end from around 1215 as the peloton leaves Slessor Gardens and crosses the bridge. Good luck to all cyclists and teams from everyone at the Tay Road Bridge. #WTOS
Tay Bridge Tweeter retweeted
The bridge will be closed in the early hours of tomorrow morning (Friday) from 1am to 4am to permit safe installation of LED street lights, and for the removal of obsolete equipment. Emergency vehicle access will be maintained. We apologise for the inconvenience this will cause.
11
4
Tay Bridge Tweeter retweeted
Our Aberdeen off ramp will be closed from 2pm this afternoon until Monday morning. This is to mitigate congestion due to the emergency gas main repairs in Dock Street. Diversions will be in place. Traffic signal timing's will be adjusted to accommodate the additional flow.
2
4
1
Tay Bridge Tweeter retweeted
Repairs complete. The northbound carriageway will be open in five minutes. Southbound to follow in approximately 15 minutes time. (18:03 19/09/18)
2
18
5
31