Aus Singapore Cable (@TheASCproject) header
Aus Singapore Cable (@TheASCproject) profile picture

The Vocus Australia Singapore Cable (ASC) is a ~4,600km submarine cable system linking Australia to Singapore and Indonesia, delivering over 40Tbps of capacity.

Joined December 2016
SPECIAL ANNOUNCEMENT: With the flick of a switch, Vocus Communications’ $US170m Australia Singapore Cable was today connected to the company’s terrestrial network, providing the country with a massive increase in capacity into the Asian region. australiasingaporecable.com/…
8
1
18
Our appetite for bandwidth is voracious and growing which is why the arrival of the Australia Singapore Cable is so exciting! It will deliver incredible speeds of up to 40 terabits per second and improvements in connectivity, bandwidth and reliability. vocus.com.au/news/why-pieces…
6
7
MILESTONE: The cable lay phase of the Australia Singapore Cable is now DONE! The final splice has been completed south-east of Singapore; now the project team start the make-ready phase of installation, configuration and testing of the cable system. australiasingaporecable.com/…
1
9
1
23
Get ready. Settle in for a technology tour de force as we take a look at the tech in the Vocus ASC australiasingaporecable.com/…
5
9
This is a nifty piece of kit. It’s a remotely operated vehicle which is used to take underwater footage of the ASC and verify burial depth during the post lay burial inspection.
1
3
1
7
The @VocusComm team are on the ground at the ITW conference in Chicago, with a packed schedule of meetings with telco wholesalers over the next few days #ITW2018
2
4
7
Hey Indigo, this one has your name on it! See you at the finish line – we’ll keep the beers cold, if there are any left when you get here… 😉 @SubPartners @superloopnet #ITW2018
1
3
1
15
The Ile de Batz has completed the final stage of the southern lay. A 40 tonne plough was used to bury the ASC to protect it from ships and other threats, before it was joined to the Perth shore end cable.
1
3
1
14
The @VocusComm ASC team will be at #ITW2018 taking place 6-9 May in Chicago. This is the last major telco event before the ASC goes live so get in quick if you want to meet the team to secure capacity! itw2018.com
ASC Ship Watch: The Ile de Re has started laying the ASC about 100km north of Christmas Island. Over the next few months the ship will make its way north to Singapore via Indonesia, where it will complete the final splice, joining the ASC cable end to end.
2
5
13
How much does the ASC weigh? The Ile de Batz was loaded with 2930km of cable weighing 1830 tonnes, while the Ile de Re carries 1710km of cable, weighing 3275 tonnes!
1
1
1
5
ASC Ship Watch: The ASN ship Ile de Re is loading the remaining ASC cable in Singapore and is soon to depart for Christmas Island, where it will begin laying the northern section of the cable
3
1
12
Big day for the ASC with the first repeater hitting the water!
1
5
1
21
It was all quiet on board the Ile de Batz prior to the ship leaving Singapore harbour. The ship is now in transit to Christmas Island to start the ASC main lay