Tissy retweeted
Jane needed new makeup.
Jane had a consultation with me where I not only recommended the best products for her based on her skin type and needs, but I also helped her purchase the products and made sure it got to her in the UK.
Be like Jane. Send me a DM today.
Tissy retweeted
Covering Grey’s presence at Moonshot as Global SMM was an intense, but incredibly fulfilling experience. Seeing the conversations we sparked online, the excitement around our activations
made every bit of the work worth it.
Shoutout to me and my amazing team🖤
See wetin I dey use my prime years read? A “whodunnit” because I no get light
TCN REJECTS IKEDC’S ATTRIBUTION OF BAND A OUTAGES TO “GRID INSTABILITY”, REFERS PUBLIC TO NISO’S CLARIFICATION
The Transmission Company of Nigeria (TCN) has noted the Public Notice published by Ikeja Electric (IKEDC) on 5th November 2026, in which several Band A feeder outages recorded on 3rd and 4th November 2026 were attributed to “grid instability” and assigned to TCN as the responsible party.
TCN wishes to state clearly that this attribution is inaccurate and misleading, for the following reasons.
1. Root-cause determination is not the mandate of a DisCo.
By virtue of Section 67 of the Electricity Act 2023, the determination of the root cause of disturbances, shortfalls and interruptions on the national grid falls exclusively within the defined functions of the Nigerian Independent System Operator (NISO). IKEDC, like every other market participant, has no authority to make such determinations, and NISO has made none attributing the outages in IKEDC’s notice to TCN.
2. NISO has already stated the true position.
In its public clarification of 5 November 2026, NISO attributed the current decline in power generation to constraints in gas supply to thermal power stations and reduced output from hydroelectric stations due to lower reservoir inflows. NISO explained that this reduced available generation, which in turn reduced the energy allocated to DisCos and led to fewer hours of supply and increased load shedding across distribution networks. The impact on each DisCo varies with available generation and its allocation.
3. The facts are inconsistent with the “grid instability” claim.
The shortfall in supply to IKEDC’s customers is a consequence of reduced generation and the resulting allocation, not of any failure of TCN’s transmission network. TCN can only transmit the energy made available to it and cannot transmit energy that is not generated.
4. The records for all feeders supplying IKEDC confirm the national picture NISO described. Of the interruptions recorded on 1 and 2 November, 68% were frequency-control load-shedding arising from low generation. A further 26% were due to IKEDC’s non-compliance with load allocation by the National Control Centre (NCC) of NISO, or to faults and works on IKEDC’s own network. The remaining 6% were TCN planned maintenance, switching or a line limitation. None of the recorded interruptions was a TCN equipment fault or trip.
The feeders named in IKEDC’s notice do not support the claim either. Of the 46 interruptions recorded on the 33kV feeders named in the notice, 29 were frequency-control load-shedding arising from low generation, and 14 were recorded against IKEDC: 9 for non-compliance with load allocation and 5 for faults or trips on its own network. The other 3 were scheduled TCN maintenance on the Ogba–Alimosho line on 1 November. On 2 November, for example, the Rack Centre feeder was interrupted by a cable fault on IKEDC’s network, which its own crew repaired. IKEDC’s notice itself assigns several of these feeders, including MTN, Iju Water Works and Rack Centre, to IKEDC (“IE”) for 33kV faults.
IKEDC’s position is therefore out of step with the true state of the Nigerian Electricity Supply Industry. Attributing shortfalls caused by generation constraints to TCN misinforms customers, undermines public confidence and obscures the real challenges that all stakeholders must work together to resolve.
TCN therefore urges IKEDC and all other DisCos to desist forthwith from making unfounded claims about the causes of supply shortfalls to their customers. DisCos should communicate based on verified information from NISO, the body responsible for the operation of the grid.
I know my problems are always different but does Revolve charge customs when you ship to lagos or is it one of those things that I’ll find out when my package reach ?
I made this album from a place of being deeply in love, while also learning how to be more intentional with the person I love.
Love is not dead. ❤️
Listen to my new project, “THE ONLY LOVER BOY LEFT,” and I hope it inspires you to find love again.
THE ALBUM IS OUT NOW!!!
Please share it with your audience, your friends and everyone around you. That’s probably the greatest gift you can give me.
Thank you for all the love and support over the years. I love you all. ❤️
Tissy retweeted
It’s very laughable really. That this election is still a contest is so funny.
You cannot believe this nonsense. Page I ordered from is blocking me because I’m asking for delivery timeline ??????
























