Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)Photo by Wilson Makembe (@WilsonMakembe)
The Chinese rig was inspected and tested in September by M&P and PURA (regulator) in Tianjin Province, China. Is expected to arrive by the end of November, with spud to commence as early as December. The campaign will take us through Q1 of 2026 (tentatively).
1
1
1
2
410
Fascinating find, @WilsonMakembe! We produced an article about the "Flying Pipeline" and a few other oil transportation options considered along with the pipeline for our 45th anniversary storytelling. Check it out: alyeska-pipe.com/45-2001-wil…
Before the feasibility of the Trans-Alaska Pipeline was certain, Boeing had a proposal to fly the oil out, making them the operators of "The First Flying Pipeline". The project was formally proposed and confirmed in 1968, after the major oil discovery at Prudhoe Bay.
1
1
303
PanAfrican Energy (T) Limited, a subsidiary of Orca Energy Group, one of the key players in Tanzania's natural gas sector. They are known for being the country's first natural gas producer.
3
1
4
399
Wilson Makembe retweeted
JUST IN: The rig has arrived at M&P's Mnazibay gas field and is fully erected, with drilling activities to commence ASAP. The 3000HP rig was moved from Tanga Port to Msimbati, Mtwara, Tanzania, over 900km. The expedition looks at 3 new wells. 2026 just got 🔥🔥lit #HereweGo🇹🇿
3
1
2
11
1,610
Wilson Makembe retweeted
The project is a bit ahead of schedule based on what was shared late last year. Signalling for "More time to navigate and handle construction work". First gas June #HereWeGo
2
1
2
8
576
Rig - collaboration for CH1 could be possible subject to prep work by ARA. The rig club could be back after its sudden death in 2015-2017.
Replying to @WilsonMakembe
The Chinese rig was inspected and tested in September by M&P and PURA (regulator) in Tianjin Province, China. Is expected to arrive by the end of November, with spud to commence as early as December. The campaign will take us through Q1 of 2026 (tentatively).
1
3
232
Chances are greater for sharing a rig with M&P (as the most economic option available). Likely for APT's programs to commence sometime in Q2 of 2026.
So we are up. PURA has given the greenlight, EoIs for the rig to be issued next week. One step closer. #HereWeGo
2
2
4
550
#AEX APT estimates the Ntorya area to contain a matured, unaudited Contingent Resource of 3.45 trillion cubic feet (tcf) of Gas Initially In Place (GIIP), with a mean unrisked GIIP potential of 16.4 tcf and a risked mean potential of 6.9 tcf for the wider Ruvuma JV area.
Natural gas discovery was made first in Tanzania around 1974 at the Songo Songo Isaland. Later came Mnazi bay in 1982, Mkuranga in 2008, Ruvu in 2017 and Ruvuma in 2018. All of the highlighted fields above are in an onshore setting with an estimate reserve of 10.41 TCF.