
Founder CEO @smsolarpower ☀️EPC & Development in 🇮🇩 #OwnYourPower
Indonesia
Joined June 2022
- Tweets2.1K
- Following1.4K
- Followers173
- Likes5.6K
IDX says it will remove stocks with high shareholder concentration from the benchmark. Those are about 18% of the index.
This is the response to MSCI’s consultation on moving Indonesia from Emerging Market to Standalone. Friday the JCI dropped 11.6%. Today it bounced around 4%.
Removing names is the easy part. MSCI’s issue is whether the trading is clean, not whether the index looks cleaner.
Source: Bloomberg, Reuters
The old Indonesian energy argument was simple: coal is cheapest.
IEEFA’s latest numbers say that is breaking.
They put 2025 coal generation cost at about IDR 930/kWh, up 46%, and heading toward ~IDR 1,060/kWh in 2026.
On LCOE, they range utility solar at USD 5.6–8.4¢/kWh versus coal at USD 10.0–15.1¢/kWh.
If those ranges hold, the bottleneck is no longer “solar costs too much.”
It’s land, interconnection, contracts, and political economy.
#Indonesia #coal #renewables #lcoe
Source: IEEFA
Indonesia’s data-center power requests are no longer 100–200 MW.
PLN has said new orders are coming in at 1 GW, 2 GW, even 3 GW per project.
The utility already serves about 159 data-center customers with roughly 2 GW connected. Almost all of that sits on the Java–Bali grid.
The 2034 planning number being briefed internally: about 25 GW of data-center electricity demand.
The constraint is not cheap land.
It’s substations, transmission, and how fast PLN can energize a site.
#Indonesia #grid #datacenter #electricity
Sources: Kontan, Republika, S&P Global
Indonesia just launched a 100 GW solar program.
At the end of 2025, the country had about 1.5 GW of solar installed (in history total).
On 25 August in Bali, President Prabowo kicked off the first 14 projects — 5.3 GW combined. Two already run. Six are under construction. Six still need investors.
The full program is being sold as a 2029 target, with tens of billions of dollars attached.
The gap between the speech and the installed base is the real story.
Not whether solar works. Whether Indonesia can actually build at this speed.
#Indonesia #solarenergy #renewables
Sources: Reuters, pv magazine, The Diplomat
1/
I’m Aditya.
I run a solar EPC company in Indonesia called SMSolar @smsolarpower
Studied electrical & computer engineering in the US (BU → Columbia). Now back home building renewable energy projects on the ground.
Most content about solar energy in Indonesia is either too salesy or too theoretical.
I try to share what actually happens when you try to install, finance, and operate in 🇮🇩.
2/
On this account you’ll mainly get:
• Practical solar power realities in Indonesia
• Local insights that foreigners (and many Indonesians) rarely hear
• Occasional personal notes — basketball, anime/manga, capital markets, crypto, life in between projects
No heavy sales. Just observations from someone who’s in the middle of it.
Everyone who played Dota in the covid era must be rooting for @NigmaGalaxy
@SumaaaaiL finish strong king!
Imu is ____ ???
#ONEPIECE #ONEPIECE1191
Chapter 1191 Of One Piece: "Loki Is Here" Is Out Now!
Read It Ad-Free In Our Bio Or In The Replies!
PS: All Our Links Are Always Ad Free!
Aditya Wikara retweeted
#ONEPIECE #ONEPIECE1191
Chapter 1191 Of One Piece: "Loki Is Here" Is Out Now!
Read It Ad-Free In Our Bio Or In The Replies!
PS: All Our Links Are Always Ad Free!
1 Terrawatt 🤯
Terafab will be built in Grimes County, Texas
In April, we broke ground on our research fab on the North Campus of Giga Texas – the precursor to Terafab.
Both Tesla & SpaceX will need far more chips than current & future global production can supply.
This is why we're building the largest chip manufacturing facility ever, with the goal of producing over 1 terawatt of compute per year
The future is built in Texas
spacex.com/updates#terafab









