CHASE. retweeted
Cortex 2 at Giga Texas continues to complete phase 2 construction work, with many more Megapacks being delivered and installed on the W side, another Megapack installation on the E side, the 2nd cooling tower moving closer to completion & many deliveries of equipment being moved inside the N end.
This AI Data Center is key to the Optimus humanoid robot and also is a part of the Full Self Driving training effort. It has been partially operational since April and should be fully operational in the fall of this year.
Terafab will be built in Grimes County, Texas
In April, we broke ground on our research fab on the North Campus of Giga Texas – the precursor to Terafab.
Both Tesla & SpaceX will need far more chips than current & future global production can supply.
This is why we're building the largest chip manufacturing facility ever, with the goal of producing over 1 terawatt of compute per year
The future is built in Texas
spacex.com/updates#terafab
Elon Musk was asked how fast AI is moving, and answered by correcting the most aggressive forecaster in technology for not being aggressive enough.
Musk: “I have to give credit to Ray Kurzweil in being actually remarkably accurate in his predictions. If anything, I think he was perhaps a bit conservative in his predictions.”
Kurzweil spent thirty years publishing timelines that were treated as proof he had lost the plot. He hit nearly all of them. The word Musk used for that record was conservative.
Kurzweil built his forecasts by reading the rate of change. Musk is reading it now.
Musk: “The dedicated AI compute appears to be growing by a factor of 10 every six months.”
That is not a projection. “Appears to be growing” describes something that has already happened.
Musk: “Almost a 100x improvement per year, at least for the next few years.”
Moore’s Law was 2x every two years. That one curve produced the internet, the smartphone, the cloud, and every instinct you have about how fast the world can change.
Your sense of normal was calibrated on 2x. The system is running at 100x.
The new world is not being built next to the old one.
Musk: “Probably a lot of the data centers, maybe most of the data centers that currently do conventional compute, will transition to AI compute.”
The infrastructure holding up the current economy is being converted into what replaces it. The old world is the raw material for the next one.
Every generation assumes the speed it grew up with is the speed of history. Ours is the first to be handed the actual number and still round it down.
Everything you build takes time. A child, a trade, a life’s work. All of it rests on the assumption that the world will still be recognizable when the work is finished.
That assumption has held for every human who has ever lived. It was never a law of nature. It was a side effect of how slowly things moved.
The most extreme forecast on record came in low. Reasonable is no longer the safe position. It is only the comfortable one.
Electrical Field Engineer on this Project. 🦾
Cortex 2 at Giga Texas is getting many more Megapacks installed today, both to support the AI Datacenter operations & for the phase 2 of the cooling system/towers which are nearing operational status.
Once fully installed, there will be ~260 Megapacks supporting this one facility! This is in addition to the other 140 already on site in two different installation locations, meaning the overall Giga Texas site should have ~400 in total, once fully installed!
1
92
CHASE. retweeted
Cortex 2 at Giga Texas is getting many more Megapacks installed today, both to support the AI Datacenter operations & for the phase 2 of the cooling system/towers which are nearing operational status.
Once fully installed, there will be ~260 Megapacks supporting this one facility! This is in addition to the other 140 already on site in two different installation locations, meaning the overall Giga Texas site should have ~400 in total, once fully installed!
CHASE. retweeted
10 July 2026 Giga Texas snapshots! Beautiful non-production day, but construction never stops, especially on the E side Advance Chip Fab site & the N Optimus factory site. Additional clearing, excavation work and workshop set up noticed in the far NE of the battery cathode plant, the far NW Tesla Rd area and S of the Optimus foundation. Outbound lot absolutely full of vehicles (all versions of Model Y’s, @Cybertruck and Cybercabs) with transport trucks busy loading up! Cybercab test drives gearing up for another day of testing too!
CHASE. retweeted
8 July 2026 Giga Texas Snapshots! Great day to fly with plenty to see! Test Track getting cobble stone sections for NVH testing, E Advanced Chip Fab foundation prep, Optimus Factory steel assembly grows ever larger, River Rd extension now reached “Lone Tree” field, new workshops, Main Factory large wall opening & receiving dock reconfiguration, many Cybercabs, Model Y’s & some @Cybertruck in the outbound lot. Check it out!