Deepak Mohoni (@deepakmohoni) header
Deepak Mohoni (@deepakmohoni) profile picture

Online courses Quant Dashboard AI Coined word #Sensex #COYS ๐Ÿ—PAST: ET Now, CNBC EcoTimes column Taught 3000+ investors IITK, IIMC

Pune
Joined April 2009
Photo by Deepak Mohoni (@deepakmohoni)Photo by Deepak Mohoni (@deepakmohoni)Photo by Deepak Mohoni (@deepakmohoni)Photo by Deepak Mohoni (@deepakmohoni)Photo by Deepak Mohoni (@deepakmohoni)Photo by Deepak Mohoni (@deepakmohoni)Photo by Deepak Mohoni (@deepakmohoni)Photo by Deepak Mohoni (@deepakmohoni)Photo by Deepak Mohoni (@deepakmohoni)
90% of traders lose money in both Indian and global markets Even most mutual (and other managed) funds fail to beat the index in the long run This evidence-based investing course teaches what actually works - backed by research, not opinions More details in thread ๐Ÿ‘‡ (1/3)
3
7
37
19,179
Deepak Mohoni retweeted
I've just turned off the news and put on a serial killer documentary to relax.
197
467
41
5,401
76,676
Deepak Mohoni retweeted
Nifty 500 ยท Volume Toppers ยท 2 Nov 2026
1
99
Deepak Mohoni retweeted
Nifty 500 ยท 25-Day Top Movers ยท 2 Nov 2026
1
93
Deepak Mohoni retweeted
Nifty 500 ยท 5-Day Top Movers ยท 2 Nov 2026
1
101
Deepak Mohoni retweeted
Nifty 500 ยท Today's Top Movers ยท 2 Nov 2026
2
1
104
Deepak Mohoni retweeted
IS THERE A DATA CENTRE COMING NEAR YOU SOON? ๐Ÿ‡ฎ๐Ÿ‡ณโšก Listed below are over 75 data centre projects announced or under construction (~17.5 GW total) in India, and the impact they will have on their neighbourhood. A data centre employs barely 100โ€“200 permanent staff, but can draw the electricity of a city and evaporate millions of litres of water daily. Use this emoji scale to check the data centre projects coming to your neighbourhood: ๐Ÿšจ 500 MW to 1,000 MW / 1 GW+ (The Regional Killer): Power draw of a commercial nuclear reactor (~1M homes) across 200โ€“600+ acres. Physically cannot sit inside an urban areaโ€”it gets pushed 30 to 50+ km outside cities (Vizag coast, Jamnagar, Bharat Future City), permanently altering local transmission grids, water bodies, and farmland. ๐Ÿญ 70 MW to 300 MW (The Industrial Giant): Requires 15โ€“50 acres. Power draw equals a mid-sized town, maxing out local 220 kV substations. Quarantined in heavy industrial corridors (Taloja, Rabale, Greater Noida), bringing visible high-voltage transmission lines and heat rejection plumes. ๐Ÿข 20 MW to 60 MW (The Suburban Menace): Draws continuous power equal to 20,000 to 60,000 homes. Houses 15โ€“30 industrial diesel generators and evaporates up to 1M litres of water daily if using cooling towers. When dropped next to residential high-rises (e.g., Thane, Ambattur, Chandivali), non-stop droning noise, water diversion, and exhaust trigger civic pushback. ๐Ÿ”น Under 20 MW (The Low-Profile Neighbour): Fits on 1โ€“3 acres inside an existing IT park. Power draw equals a couple of standard office tech towers. Beyond routine monthly generator testing, you won't even notice it's there. --- THE COMPLETE CITY-BY-CITY TRACKER: ALL 80+ UPCOMING PROJECTS ๐Ÿ“ PUNE ๐Ÿญ AdaniConneX Pune Campus (Hinjewadi) โ€” ~70 MW | Partners: Adani + EdgeConneX (Microsoft lease) | Status: Under construction; due 2026โ€“2027 ๐Ÿ”น NTT DATA Pune In-fill Expansion (Hinjewadi) โ€” ~15 MW | Partner: NTT DATA | Status: IFC-backed expansion; 2026โ€“2027 ๐Ÿšจ TCS HyperVault Hub (Pune Region) โ€” Part of 1 GW multi-city program | Partners: TCS + TPG + OpenAI | Status: Land acquisition phase (Oct 2026) ๐Ÿ“ THANE & OUTER MMR ๐Ÿข Amazon AWS Hyperscale Campus (Thane) โ€” 53-acre campus ($8.3B Maharashtra program) | Partners: Amazon India + Local EPCs | Status: Active construction; phased 2027โ€“2028. (Local pushback over water diversion, non-stop droning noise & diesel backup proximity) ๐Ÿข STT GDC Palava Phase 1 (Dombivli) โ€” 50 MW IT (400 MW master plan) | Partners: STT GDC (KKR + Singtel) | Status: Ground broken Mar 2026; date TBA ๐Ÿ“ MUMBAI & NAVI MUMBAI ๐Ÿšจ Panchshil โ€“ Blackstone Ghansoli Mega-Campus โ€” 500 MW (โ‚น20,000 Cr; 50 acres next to RCP) | Partners: Panchshil Realty + Blackstone | Status: Land acquired; 2028โ€“2030 ๐Ÿญ Sify Rabale Towers 6 to 12 (TTC Industrial Area) โ€” 276 MW expansion | Partners: Sify + Kotak DC Fund + IFC | Status: Under construction; phased 2026โ€“2028 ๐Ÿญ CoreWeave โ€“ AdaniConneX AI Campus (Taloja MIDC) โ€” 240 MW (NVIDIA Vera Rubin) | Partners: AdaniConneX + CoreWeave | Status: Base campus live late 2026; CoreWeave live mid-2028 ๐Ÿญ RackBank WST1 Campus (NAINA) โ€” 160 MW roadmap (20 MW Phase 1) | Partner: RackBank Datacenters | Status: Target 2027โ€“2030 ๐Ÿญ AirTrunk LBOM II (Mahape) โ€” 150 MW | Partners: Blackstone + CPP Investments | Status: Planned 2027โ€“2029 ๐Ÿญ Colt DCS Navi Mumbai Expansion (Airoli) โ€” 134 MW IT | Partners: Colt DCS (Fidelity) + RMZ | Status: Phased to 2028 ๐Ÿญ Princeton Digital Group MU2 (Navi Mumbai) โ€” 120 MW (5-storey building) | Partners: PDG (Warburg Pincus, Stonepeak) | Status: Started Apr 2026; due 2027โ€“2028 ๐Ÿญ Digital Edge BOM1 to BOM3 โ€” 120 MW | Partner: Stonepeak | Status: BOM3 started Aug 2026; phased to 2028 ๐Ÿญ Princeton Digital Group MU1 Expansion (Airoli) โ€” 100 MW expansion (50 MW live) | Partner: PDG | Status: Phase 1 due 2026โ€“2027 ๐Ÿญ CtrlS Mumbai DC6 & DC7 (Mahape) โ€” 95 MW | Partners: CtrlS + CPP Investments | Status: Under construction; due 2026โ€“2027 ๐Ÿญ STT GDC Navi Mumbai 2 & 3 (Mahape) โ€” 91 MW (NM1 live) | Partners: KKR + Singtel | Status: Due 2026โ€“2027 ๐Ÿญ Iron Mountain MUM-3 Campus (Rabale) โ€” 85 MW | Partner: Iron Mountain (ex-Web Werks) | Status: Ground broken Jan 2026; due 2027โ€“Q1 2028 ๐Ÿญ Yotta Navi Mumbai NM2 (Panvel) โ€” 75โ€“80 MW (40k GB300 planned) | Partner: Hiranandani Group | Status: Fit-out underway; 2026โ€“2027 ๐Ÿข AirTrunk BOM1 (Airoli) โ€” 62 MW | Partners: Blackstone + CPP Investments | Status: ~60 MW ready; launch late 2026 ๐Ÿข Google โ€“ EverYondr Leased DC โ€” 60 MW (28-yr lease via Raiden Infotech) | Partners: EverYondr + Google | Status: Under construction; 2026โ€“2027 ๐Ÿข Digital Connexion BOM10 (Chandivali) โ€” ~40โ€“50 MW | Partners: Reliance + Brookfield + Digital Realty | Status: Planned ๐Ÿข Nxtra by Airtel Mahape MUM 4 โ€” 42 MW IT | Partners: Bharti Airtel + Carlyle/Alpha Wave | Status: Due 2026โ€“2027 ๐Ÿข L&T-Vyoma Mahape AI DC โ€” 40 MW | Partner: Larsen & Toubro | Status: Ground broken; due 2027 ๐Ÿข CapitaLand DC Mumbai Tower 2 (Airoli) โ€” 37 MW IT | Partner: CapitaLand India Trust | Status: Handover H1 2027 ๐Ÿ”น Yotta NM1 (Panvel) โ€” 52 MW IT | Partner: Hiranandani + NVIDIA | Status: LIVE ๐Ÿ”น CapitaLand DC Mumbai Tower 1 (Airoli) โ€” 34 MW IT | Partner: CLINT | Status: LIVE ๐Ÿ”น Equinix MB3 (Chandivali) โ€” 1,370+ cabinets | Partner: Equinix | Status: LIVE ๐Ÿ“ VISAKHAPATNAM, ANDHRA PRADESH ๐Ÿšจ Google Visakhapatnam AI Hub (Tarluvada, Rambilli & Mudasarlova) โ€” 1,000 MW (1 GW) across 601 acres ($15B) | Partners: Google + AdaniConneX + Nxtra | Status: Ground broken Apr 28, 2026; Phase 1 mid-2028; full by 2030 (Active AP High Court PIL over Kambalakonda eco-zone & green cover) ๐Ÿšจ Digital Connexion Vizag (Coast) โ€” 1,000 MW (1 GW) across 400 acres (โ‚น98,000 Cr MoU) | Partners: Reliance + Brookfield + Digital Realty | Status: Early planning & coastal grid study; target 2029โ€“2030 ๐Ÿšจ TCS HyperVault Hub (Vizag Region) โ€” Part of 1 GW multi-city anchor | Partners: TCS + TPG + OpenAI | Status: Land secured Oct 2026 ๐Ÿข Sify Visakhapatnam Campus โ€” 50 MW (โ‚น1,500 Cr) | Partner: Sify Infinit Spaces | Status: Foundation laid late 2025; date TBA ๐Ÿ“ HYDERABAD, TELANGANA ๐Ÿšจ TCS HyperVault Hub (Bharat Future City, Mucherla) โ€” 100 MW initial anchor scaling to 1,000 MW (1 GW) | Partners: TCS (51%) + TPG (49%) + OpenAI | Status: 264 acres allocated Sep 2026; Phase 1 mid-2028 ๐Ÿšจ CtrlS Chandan Valley Park (Chandanvelly) โ€” 612 MW campus (Phase 1: 250 MW power) | Partners: CtrlS + CPP Investments | Status: Civil work ongoing; phased 2027โ€“2030 ๐Ÿšจ AWS Bharat Future City Campus โ€” Multi-hundred MW ($7.2B / โ‚น60,000 Cr commitment) | Partner: Amazon India | Status: Foundation laid July 2026; phased 2028โ€“2030 ๐Ÿญ Sify Hyderabad 02 (Fab City) โ€” 250 MW IT | Partner: Sify Infinit Spaces | Status: Planning stage ๐Ÿญ AdaniConneX Hyderabad Campus โ€” 100 MW (48 MW Phase 1) | Partners: Adani + EdgeConneX | Status: Due 2026โ€“2027 ๐Ÿข CapitaLand DC Hyderabad (Madhapur) โ€” 27 MW IT (42 MW power) | Partner: CapitaLand India Trust | Status: Due late 2026 / H1 2027 ๐Ÿ”น Microsoft India South Central AI Cloud Region โ€” 3 Availability Zones | Partners: AdaniConneX + Yotta | Status: LIVE (Aug 2026) ๐Ÿ“ DELHI-NCR (GREATER NOIDA, NOIDA & HARYANA) ๐Ÿšจ AM Group Jewar AI Compute Hub (Sector 28 YEIDA) โ€” 1,000 MW (1 GW; $25B MoU) | Partners: AM Intelligence Labs (Greenko promoters) + YEIDA | Status: Target 2028โ€“2030 ๐Ÿญ Anant Raj Campuses (Manesar, Panchkula & Rai, HR) โ€” 279โ€“329 MW (28 MW live) | Partners: Anant Raj + RailTel + Orange | Status: 63 MW by FY27, full by 2032 ๐Ÿญ Yotta Greater Noida D2 & D4 (Knowledge Park V) โ€” 180 MW (D2: 60 MW / 20k Blackwell GPUs; D4: 120 MW) | Partners: Yotta + NVIDIA | Status: D2 late 2026; D4 2027 ๐Ÿญ Sify Noida 02 Remaining Towers (Sector 132) โ€” 104 MW | Partner: Sify Infinit Spaces | Status: Phased 2027โ€“2028 ๐Ÿข AdaniConneX Noida Campus (Sector 62) โ€” 50 MW | Partners: Adani + EdgeConneX | Status: 2025โ€“2027 ๐Ÿข STT GDC Noida 2 โ€” 50 MW (Noida 1 live) | Partners: KKR + Singtel | Status: Due 2026โ€“2027 ๐Ÿข NTT DATA Noida 2 Building B โ€” ~30 MW | Partner: NTT DATA | Status: Due 2026 ๐Ÿข Iron Mountain Noida Campus (Greater Noida) โ€” ~25 MW | Partner: Iron Mountain | Status: Planned ๐Ÿข Techno Electric Noida Edge DC โ€” ~20โ€“25 MW | Partners: Techno Electric + RailTel | Status: Due 2026โ€“2027 ๐Ÿ”น Yotta D1 (Greater Noida) โ€” 30 MW IT | Partner: Hiranandani | Status: LIVE ๐Ÿ“ CHENNAI, TAMIL NADU ๐Ÿญ Sify Chennai 02 (Siruseri) โ€” 104 MW remaining towers | Partners: Sify + IFC | Status: Phased 2027โ€“2028 ๐Ÿญ Digital Connexion Chennai (Ambattur) โ€” 100 MW campus (20 MW live) | Partners: Reliance + Brookfield + Digital Realty | Status: Phased to 2028 ๐Ÿญ Colt DCS Chennai Campus (Ambattur) โ€” 96 MW IT | Partners: Colt DCS + RMZ | Status: Planned 2027โ€“2029 ๐Ÿข Iron Mountain CHN-1 & CHN-2 (Ambattur) โ€” 42 MW power | Partner: Iron Mountain | Status: CHN-1 late 2026; CHN-2 2028 ๐Ÿข CapitaLand DC Chennai (Ambattur) โ€” 34 MW IT (53 MW power) | Partner: CLINT | Status: Target late 2026 / H1 2027 ๐Ÿข L&T-Vyoma Chennai MAA 01 โ€” 30 MW IT (24 MW converting to 10k NVIDIA B300 GPUs) | Partners: L&T + Together AI + NVIDIA | Status: Shell live; GPU cluster commissioning late 2026 ๐Ÿข Techno Electric Chennai Phase 2 (Siruseri) โ€” 30 MW IT | Partner: Techno Electric | Status: Due 2026โ€“2027 ๐Ÿ”น STT GDC Chennai 4 Expansion (Ambattur) โ€” 18 MW | Partners: KKR + Singtel | Status: Ground broken Feb 2026; due 2027 ๐Ÿ”น STT GDC Chennai 7 Phase 1 (Siruseri) โ€” 7.2 MW IT | Partners: KKR + Singtel | Status: LIVE ๐Ÿ”น CtrlS Chennai Park (Ambattur) โ€” 72 MW campus | Partners: CtrlS + CPP | Status: DC1 LIVE ๐Ÿ”น Equinix CN1 (Siruseri) โ€” 800 cabinets | Partner: Equinix | Status: LIVE ๐Ÿ”น AdaniConneX Chennai 1 Building 1 โ€” 17 MW IT | Partners: Adani + EdgeConneX | Status: LIVE ๐Ÿ“ GUJARAT (JAMNAGAR & GIFT CITY) ๐Ÿšจ Reliance Intelligence Sovereign AI Complex (Jamnagar) โ€” 120 MW Phase 1; scaling to 2,000โ€“3,000 MW (2โ€“3 GW) | Partners: Reliance + NVIDIA | Status: Phase 1 commissioning late 2026 ๐Ÿญ Reliance โ€“ Meta Built-to-Suit AI DC (Jamnagar) โ€” 168 MW (Seawater-cooled from Gulf of Kutch to avoid freshwater draw) | Partners: Reliance (Landlord) + Meta (Tenant) | Status: Construction underway; due 2027โ€“2028 ๐Ÿข CtrlS Ahmedabad Upcoming DC โ€” ~25 MW | Partner: CtrlS | Status: Under development ๐Ÿ”น Yotta GIFT City G1 (Gandhinagar) โ€” 2 MW IT | Partner: Hiranandani | Status: LIVE ๐Ÿ“ REGIONAL & TIER-2 HUBS ๐Ÿšจ Trentar Green Hyperscale DC Park (Maharashtra Interior) โ€” 500 MW | Partners: Trentar / Dorf Ketal + Maha Govt | Status: State MoU signed Oct 2026 ๐Ÿญ RackBank Central India AI Hubs (Nava Raipur & Indore) โ€” 80 MW roadmap | Partners: RackBank + ReNew Power | Status: Phase 1 active; expanding 2026โ€“2027 ๐Ÿญ CtrlS Bodh Gaya AI DC (Bodh Gaya, Bihar) โ€” 150 MW (โ‚น10,000 Cr) | Partners: CtrlS + Bihar Govt | Status: LoI signed Oct 2026; due 2029โ€“2030 ๐Ÿข Nxtra by Airtel Kolkata Hyperscale (New Town) โ€” 25 MW | Partner: Bharti Airtel | Status: Due late 2026 ๐Ÿข STT GDC Kolkata DC2 (New Town) โ€” ~17โ€“25 MW | Partners: KKR + Singtel | Status: Due 2027 ๐Ÿ”น CtrlS Kolkata DC1 (New Town) โ€” 16 MW IT | Partner: CtrlS | Status: LIVE ๐Ÿ”น CtrlS Patna DC2 (Patna, Bihar) โ€” 12 MW | Partner: CtrlS + Bihar Govt | Status: LIVE (Oct 2026) ๐Ÿ”น CtrlS Bhopal Edge DC (Badwai IT Park, MP) โ€” 12 MW | Partner: CtrlS | Status: Due late 2026 ๐Ÿ”น National Data Center North East (Guwahati) โ€” 2 MW IT | Yotta / NIC | Status: LIVE ๐Ÿ”น CtrlS Guwahati DC (Assam) โ€” ~10 MW | Partner: CtrlS | Status: Under development ๐Ÿ“ MULTI-GIGAWATT PLATFORM PLEDGES ๐Ÿšจ AirTrunk India Mega-Expansion โ€” 5,000 MW (5 GW) roadmap ($30B pledge, incl. 3 GW Raigad LoI) | Partners: Blackstone + CPP Investments | 2030 target ๐Ÿšจ Adani Group Sovereign AI Platform โ€” 5,000 MW (5 GW) by 2035 ($100B commitment) | Partners: Adani + EdgeConneX + Adani Green | Phased to 2035 ๐Ÿšจ TeraNova DC Platform (MH, TG, AP, NCR, GJ) โ€” 2,000+ MW ($12โ€“15B plan) | Partners: Hillhouse Investment | Launched Oct 2026; target 2032 ๐Ÿšจ Cortex DC Platform (Golden Quadrilateral Corridor) โ€” 2,000 MW AI-ready | The Chatterjee Group (TCG) | Launched Oct 2026; 7-yr rollout (All verified links to project registries and state filings in the reply below ๐Ÿ‘‡)
OPINION | Indiaโ€™s AI ambitions are fuelling a data-centre boom, but who bears its environmental costs, who benefits, and what human desires are these powerful machines serving? Acharya Prashant examines the questions. timesnownews.com/opinion/indโ€ฆ
2
1
1
1
352
Deepak Mohoni retweeted
A new vaccine against pancreatic cancer, one of the deadliest cancers, prompted an immune response in 99% of the patients whose responses could be measured. Most pancreatic cancers are driven by mutations in the KRAS gene. The vaccine, called camupepimut and developed by Elicio Therapeutics, is designed to train the immune system's T cells to recognize seven of the most common KRAS mutations. In a phase 2 trial led by Mayo Clinic oncologist Ben George, 144 patients who had already completed surgery and chemotherapy were randomly assigned to receive the vaccine or to be observed without it. Among the 90 vaccinated patients who could be evaluated, 89 developed T cells that targeted mutated KRAS. In more than 80% of them, the response was over nine times stronger than at baseline. Patients with the strongest immune responses tended to remain cancer-free for longer. A larger phase 3 trial is planned, and it may include booster doses and combinations with other drugs. [George B, Singh H, Devoe CE, et al. Lymph node-targeted, mKRAS-specific amphiphile vaccine in pancreatic cancer: the randomized phase 2 AMPLIFY-7P trial. Nature Medicine. 2026. DOI: 10.1038/s41591-026-04734-7]
25
174
11
1,050
67,952
Deepak Mohoni retweeted
Marta Shahbazi spent her career discovering how the very first steps of life are taken. Today we learned that the brilliant Cambridge developmental biologist was killed in Spainโ€™s rail disaster. There's a tribute in my Substack (subscription is free): rogerhighfield.substack.com/โ€ฆ
3
11
1
54
4,393
69
225
25
2,353
60,203
And a scientific explanation of why Homeopathy still seems to work for many: "A placebo can work even when you know itโ€™s a placebo" health.harvard.edu/blog/placโ€ฆ
A mathematical explanation of why Homeopathy does not work. If you paid attention, they write CH on Homeopathic preps. This is the core concept of Homeopathy. -1 CH means 1 part of formula in 100. -30 CH means dilution of 1 in 10โถโฐ. -200 CH is 1 in 10โดโฐโฐ. Now coming to Avogadro's number. Avogadro's number (about 6.022 ร— 10ยฒยณ molecules per mole) sets a physical limit on how far you can dilute something before none of it is left. One mole of a substance contains about 6 ร— 10ยฒยณ molecules. At 12 CH (a 10ยฒโด dilution), you'd expect less than one molecule left. At 30 CH (10โถโฐ), the expected number is about 6 ร— 10โปยณโท, so you'd need 1,000,000,000,000,000,000,000,000,000,000,000,000 doses just to find a single molecule. At 200 CH (10โดโฐโฐ), the number is so small that the container would need to be vastly larger than the observable universe. If you cannot even find molecule of substance in your dose, how do you expect a treatment? This you could figure out in 11th & 12th std if they could teach you in plain words. But, even with pseudoscience, people are emotionally attached. There are simple facts in world which you cannot deny, we are conditioned to believe in the unknown and make mysteries around it. Respected medical organisations have long discarded Homeopathy & regularly warn people against it.
1
2
1
9
1,184
Deepak Mohoni retweeted
Marnus Labuschagne's wife phones Newlands, "I'd like to speak to my husband, please". Receptionist: "Sorry, ma'am. He's batting." Mrs Labuschagne: "Oh, that's okay. I'll hold."
107
702
112
7,400
227,938
51
252
29
4,112
80,021
Hello @NetflixIndia the next time you want to name a reporter character Sandhya, show her uncovering illegal sand mining, create a Tamil villain, and pick bits & pieces from MY real life story which was pitched to you TWICE in 2022 and 2023, AND not give me any credit at the least.... Think hard and well. Thankfully it was a supremely crappy movie with ham performances and @ParineetiChopra was nothing like me. In fact she was nothing like any reporter & the newsroom portrayal was idiotic & amateurish. You've been clever enough to try & escape a lawsuit by altering the story enough. You owe me a public apology at the very least but I'm certain you have no moral fibre in you to do so. Shame on you all, especially the director-writer Dhruv Tripathi. Stealing other people's hard work and making money sneakily out of it.
116
1,089
71
5,597
365,504
Deepak Mohoni retweeted
Aston Villa will initiate legal action against Jamie Carragher for his unacceptable insults about the Club and its fans. Aston Villa will not allow anyone to stop our ascension in English and European football. Nassef Sawiris, Chairman
7,957
6,265
6,579
60,354
13,505,767
Deepak Mohoni retweeted
'Racist Ryanair staff told me: People like you with your passports should expect this treatment': Cricket legend Kumar Sangakkara accuses airline - who say HE refused to show visa docs trib.al/DkooYEm
56
157
11
1,647
199,722
Deepak Mohoni retweeted
Nifty 500 ยท Volume Toppers ยท 30 Oct 2026
1
145
Deepak Mohoni retweeted
Nifty 500 ยท 25-Day Top Movers ยท 30 Oct 2026
1
143
Deepak Mohoni retweeted
Nifty 500 ยท 5-Day Top Movers ยท 30 Oct 2026
1
135
Deepak Mohoni retweeted
Nifty 500 ยท Today's Top Movers ยท 30 Oct 2026
1
120