When do we use pilot schemes?
Pilot schemes simultaneously measure and monitor system parameters at all terminals of a transmission line, local and remote, and then respond according to their predetermined functions.
Learn more electrical-engineering-porta…
This booklet serves as a supportive guide, providing a summary of applied electrical measurements on power transformers. These electrical tests are crucial for assessing and confirming the parameters and dielectric strength of the transformer...
electrical-engineering-porta…
Thoughtful considerations to design MV/LV distribution substations for extended service life electrical-engineering-porta…
Contract drawings for a power transformer – The checklist you should always follow electrical-engineering-porta…
Prepare yourself for successful inspection and testing of MV metal-clad switchgear electrical-engineering-porta…
Never let an electric motor drop dead. Learn how to listen and read the motor’s soul! electrical-engineering-porta…
4 example calculations of compensation for reactive power electrical-engineering-porta…
Five good methods to apply for successful PLC troubleshooting electrical-engineering-porta…
Voltage and current measurement in modern digital high voltage substations electrical-engineering-porta…
Medium voltage and low voltage distribution systems can have a number of different configurations, including the major ones, such as standard radial, double-radial, open-ring, and closed-ring. The amount of reliability required and…lnkd.in/dq8jTguc lnkd.in/dPKsvFzj
This technical article deals with the devices that make possible the interface with the primary process (e.g. cables and switchgear) in a secondary substation from a central point, like central control databases/systems that facili…lnkd.in/eT25Q3gz lnkd.in/gp9XBnK
It is crucial to identify and organize the benefits and drawbacks of AIS and GIS in a hierarchical fashion in order to help with the decision-making process. After that, it is necessary to examine the aspects according to the requi…lnkd.in/dhcqaVGj lnkd.in/dyq-MQQ3
In this technical article a survey of different parts of the control and protection equipment is done. Equipment included in the control system are auxiliary power systems, protection system, metering equipment, control and regulat…lnkd.in/dSc2iyE3 lnkd.in/e2Ps6CJ
Electrical systems within a nuclear power plant (NPP) deserve significant design considerations. The availability of on-site as well as off-site power plays a crucial role in nuclear power plant safety and are one of the most impor…lnkd.in/dwAmDhgB lnkd.in/gx-FMkQ
However, before settling on either a standard AIS, GIS, or a system that combines the two technologies, there are a number of considerations that need to be taken into account. Because there is such a wealth of data, all of which m…lnkd.in/dAqvkaX3 lnkd.in/dyq-MQQ3
Most practical power system problems are solved by using steady state analytical methods. These methods make the assumption that circuit parameters are linear, bilateral, and constant for constant frequency circuit variables. When…lnkd.in/dANidZmZ lnkd.in/g-33UK6
Nowadays, if you do not consider harmonics distortion when designing a new network, you missed the whole point of the network design. Yes, really. The sooner you realize that harmonics problems are on the rise, the better. Modern p…lnkd.in/dP3sG2sk lnkd.in/ezVBe52X
The first remedy any operator thinks of is the readjustment of the current setting via the hit and trial method. However, this method can turn hazardous in no time if the relay cannot produce a trip signal for actual earth fault, b…lnkd.in/dH8Z-_3p lnkd.in/eC9ja4V
This technical article will try to shed some light on switching devices usually installed in low voltage switchgear – circuit breakers, contactors, disconnectors, load-break switches, switch disconnectors and fuses. There are many…lnkd.in/dzdu2HGd lnkd.in/gsVhpGv
Proper analysis of the VFD’s power and control circuit diagrams is essential for successful troubleshooting. But before starting any analysis, you must know how your system connected through VFD works and how it breathes. You must…lnkd.in/dJsZZWsQ lnkd.in/dJDaVnaA
