Britain has an infrastructure costs problem. But what's causing this and how can we fix it? HS2 will cost up to £102.7bn for 140 miles. Spain built the second longest high speed network in the world, 2,500 miles, for less. It isn't just HS2 though. Underground extensions cost twice the per-mile average of France or Italy, and six times Spain's. Heathrow's third runway, excluding new terminals, is expected to cost 10 to 70 times more than other runways. British trams cost more than double the European average. Why are these projects so expensive? There are eight key reasons: 1. Planning: it took 14 years, £300m, and 360,000 pages for the Lower Thames Crossing to go from being designated a national priority to receiving permission. 2. Environmental and Habitats Regulations: these gave us the £216m bat tunnel and the fish disco, as well as an 18,000 page environmental statement to re-open just 3.3 miles of railway on an existing alignment. 3. Judicial review: of 36 legal challenges to approved major projects, only four forced a re-decision. All four were approved again, but fighting a legal challenge can add £120m+ to a project's cost and mountains of paperwork. 4. Funding: the Treasury pays, but cannot directly control a project's spend, so it instead requires long business cases. Once given funding, promoters don't have the incentive to build more cheaply. 5. Procurement: currently generalist teams rely on consultants and are more focused on social value than past performance and value for money. 6. Regulation: quangos and departments create regulation that they don't bear the costs of. E.g. new tram projects must pay for 92.5% of the cost of moving utilities, which means utility companies demand a completely new set of pipes and wires. 7. Lack of state capacity: Madrid trebled its metro at a tenth of London's cost led by nine in-house engineers. The DfT has the second highest staff turnover of any department and cannot effectively oversee a project from design through construction. 8. Centralisation: Mayors cannot fund and approve their own infrastructure. If they could, they'd have strong electoral incentives to build quickly and cheaply, as seen in France and Spain. The good news is that every one of these is a policy choice, which can be reversed. Some fixes need only a letter from the right minister and none require significantly more spending. My new @CPSThinkTank report lays out these fixes and how to lower infrastructure costs. If we implement them, Britain could once again build the infrastructure it desperately needs. cps.org.uk/wp-content/upload…
40
164
33
519
71,261
What happened to UK trying to lead on AI?
the uk government's official ai guidance tells civil servants to use gemini flash instead of pro, keep prompts short, and not say thank you to it, for the environment i do wonder at which point we forked the road. instead of building and using it to automate the work, we write guidance on how to use less of it we have the attitude of a high school prefect. caring more about the rules than actually doing the work
35
James Griffith retweeted
the uk government's official ai guidance tells civil servants to use gemini flash instead of pro, keep prompts short, and not say thank you to it, for the environment i do wonder at which point we forked the road. instead of building and using it to automate the work, we write guidance on how to use less of it we have the attitude of a high school prefect. caring more about the rules than actually doing the work
177
113
175
1,585
482,143
Quarter of a billion pounds for a tiny bridge. What am I missing?
A short rail bridge over a two-lane road in Oxford took longer to build and cost more (inflation-adjusted) than some of the most famous construction projects in history
2
23
Singularity playing out in real time on X before MSM has time for an editorial meeting.
14
After a quiet summer, the AI model race is back
16
Anyone disagree this is where civil engineering sits? Base matrix from @McKinsey
13
Why aren’t engineers using AI?
AI power users are showing up outside tech. The fastest-growing Codex adopters since February: Legal: 108x Sales: 41x Recruiting: 41x Marketing: 26x Healthcare: 24x Charts of the Week: a16z.news/p/charts-of-the-we…
14
If @TIME says it, it must be true
1
15
Sorry Bermondsey. Take one for the team.
16
AEC firms aren’t equal in the eyes of AI The jagged frontier means some teams are highly exposed. Others are sheltered, for now. Understanding how the jagged frontier impacts your business is critical. #AEC #CivilEngineering #AI linkedin.com/pulse/aecs-jagg…
20
4,000+ planning permissions. Delivered using AI. Within 24 months, the entire planning industry will be unrecognisable. We’re just getting started. #Planning #CivilEngineering #AEC
1
12
Transport Statements. Transport Assessments. Flood Risk Assessments. Drainage Statements. Road Safety Audits. Corridor Studies. Travel Plans…
8
Every UK government since 1970 has promised to "reform planning." Here's what actually happened: → Planning paperwork: 80 pages → 3,271 pages → Homes built per year: 362,000 → 209,000 We didn't reform the system. We fed it.
10
Building anything in Britain now requires 3,200 pages of reports. A new report gets added to the UK planning system every year. When does the paperwork become the project?
2
1
1
73
But it is rare to see the growth in this bureaucracy laid out so clearly over the past 30 years
13
The most recent additions include: - Biodiversity Net Gain reports (2024) - Social Infrastructure Assessments (2024) - Carbon Options Study (2025) - Modern Methods of Construction Statement (2025) None are inherently “bad”
16
The engineering world’s first Report Battle ⚔️ We’re pitting technical reports from top US engineering companies head-to-head. Vote for your favorite and see where your firm ranks👇
1