Pinned Tweet
🏗️ Construction Update:
Mondeal One — 145m, 35-storey commercial high-rise by HN Safal — has topped out!
Glass façade work is now underway, and the tower is shaping up exactly like the renders.
Civil work by Chavda Infra.
🏰 A 34-key palace resort with event capacity of up to 1,500 guests opens in Gujarat.
WelcomHeritage has launched Balaram Palace in the Balaram Ambaji Reserve Forest.
The 13-acre estate includes:
• 34 guest rooms across four categories
• 1,000–1,500 guest capacity at the Helipad Lawn
• 300–500 guest capacity at the Crocodile Garden
• Restaurant, café, swimming pool, spa and health club
The property adds a heritage hospitality and events venue to North Gujarat.
Pic - Ease my trip
🏗️ Tremont Tower 2
Tremont Group and Aalayam Group have applied for environmental clearance for this proposed commercial high rise on SG Highway.
🏢 Configuration: G+31 floors
📐 Built-up area: Approx. 7.5 lakh sq. ft.
📍 Location: Near Gota Flyover, SG Highway
Another high-rise commercial project enters Ahmedabad's approval pipeline.
Source - Parivesh portal
📦 Ahmedabad's warehousing demand jumps 58% to 3.8 million sq. ft.
The city recorded one of its strongest warehouse expansion phases during the first nine months of 2026, according to the CREDAI–CRE Matrix report.
Key numbers for 9M CY26:
• Demand: 3.8 million sq. ft. (+58% YoY)
• New supply: 2.8 million sq. ft. (2.3x growth)
• Grade A stock: 26.3 million sq. ft.
• Vacancy: 14.1%
Ahmedabad's logistics and industrial real estate market continues to expand.
Pic - India warehousing
Gujarat Matrix retweeted
This is what proper industrialisation and good land-zoning rules can do to a state.
Gujarat's 4th-largest city, BTW. 😳
🚒 AMC floats 10 fire station tenders worth approximately ₹460.6 crore across Ahmedabad.
📍 Sarkhej: ₹42.77 crore
📍 Ranip: ₹52.20 crore
📍 Ramol-Hathijan (TP 107): ₹61.31 crore
📍 Ognaj: ₹37.24 crore
📍 Lambha: ₹31.08 crore
📍 Kathwada: ₹42.84 crore
📍 Isanpur: ₹65.74 crore
📍 Jodhpur: ₹40.28 crore
📍 Ramol Ward (TP 76): ₹41.02 crore
📍 Bhadaj: ₹46.12 crore
💰 Combined estimated cost: approximately ₹460.6 crore
The projects will expand Ahmedabad’s fire-response infrastructure across multiple zones of the city.
Pic - Ahmedabad mirror
🚇 Ahmedabad Metro Phase 3 will require 2.45 lakh sq. metres of private land.
The 58.52-km expansion will involve 61 land parcels across three corridors.
The land requirement:
• Phase 3A – Thaltej to Godhavi: 17,370 sq. m.
• Phase 3B – Shilaj Circle to Badrabad: 1,83,383 sq. m.
• Phase 3C – APMC circular corridor: 44,900 sq. m.
The project is estimated to cost ₹17,924 crore.
Source - DeshGujarat
Ashoka Buildcon has emerged as the L1 bidder for Package 8 of the Vadodara-Mumbai Expressway, quoting ₹1,465 crore in the second Call. The company has also won Package 9.
Vadodara Mumbai expressway, Package 8 Update
7 bidders clear technical round for NHAI's ₹1,475.68 Cr Vadodara–Mumbai Expressway Pkg‑VIII (Jujuwa–Gandeva).
In the race: Ceigall, Ashoka Buildcon, Kalthia, Kaluwala, Kalyan Toll, Ravi Infrabuild, RRSM Infra.
Price bids awaited.
Details in reply.
#NHAI #Tenders #Tenderkart
19
864
Gujarat Matrix retweeted
7 bidders clear technical round for NHAI's ₹1,475.68 Cr Vadodara–Mumbai Expressway Pkg‑VIII (Jujuwa–Gandeva).
In the race: Ceigall, Ashoka Buildcon, Kalthia, Kaluwala, Kalyan Toll, Ravi Infrabuild, RRSM Infra.
Price bids awaited.
Details in reply.
#NHAI #Tenders #Tenderkart
🏗️ A new G+32 commercial development proposed on Ahmedabad’s SG Highway.
Avirat Amiraj 1 has applied for environmental clearance for a project featuring:
🏢 32 floors
📐 Around 6 lakh sq. ft. built-up area
📍 Sola, beside Mahendra Showroom, near Kargil Petrol Pump
Another large-scale commercial development proposed along Ahmedabad’s SG Highway.
Pics - Parivesh
🛕 Somnath is set for a major pilgrimage infrastructure upgrade.
Tourism Corporation of Gujarat Ltd. has applied for environmental clearance for an integrated pilgrimage infrastructure project at Somnath Temple.
💰 Estimated cost: ₹2,684 crore
👥 Planned capacity: Over 3 lakh pilgrims per day
The initiative aims to develop Somnath into a world-class tourist destination.
Pic - Parivesh
🏙️ Dharavi’s proposed future is no longer just on paper. Residents can now walk through it.
A 22,500 sq ft Experience Centre in Mumbai offers a preview of the proposed homes and neighbourhood.
The centre features:
• 350 sq ft rehabilitation homes
• 500 sq ft renewal homes
• Furnished and unfurnished layouts
• Kitchen, bathroom, ventilation and storage arrangements
Maharashtra CM Devendra Fadnavis inaugurated the centre on October 2, 2026.
It gives residents a closer look at how their homes could take shape.
connect.adani.com/2026/nov20…
🏗️ Karai Sports Academy could trigger a real estate boom around the area.
The Gujarat government plans to rezone agricultural land surrounding the ₹1,450-crore project as R-1 (high-density residential).
The proposed change could open the door to:
🏢 High-rise residential projects
🏨 Hotels and hospitality developments
🛍️ Shopping complexes and commercial spaces
📐 Proposed FSI: 1.8, extendable to 2.7 through chargeable FSI.
The wider plan is to build a residential and commercial ecosystem around the sports hub ahead of the 2030 Commonwealth Games.
Pic - populous
🌬️ One wind turbine. A rotor sweeping an area larger than 3.5 football pitches.
Adani New Industries Limited (ANIL) has commenced production of 91.2-metre onshore wind turbine blades at its integrated facility in Mundra.
The blades are designed for Adani Wind’s MWL185-5.0 MW platform, featuring:
• 185-metre rotor diameter — the largest in India, according to the company
• 140-metre hub height
• Nearly 26,600 sq. m. rotor-swept area
The 5 MW platform has also received certification from Germany’s WindGuard Certification GmbH, clearing the way for serial production.
A significant step for India’s domestic wind turbine manufacturing capabilities.
📈 Jefferies turns bullish on all six Adani Group stocks.
The global brokerage has assigned Buy ratings to Adani Enterprises, Adani Ports, Adani Power, Adani Green Energy, Adani Energy Solutions and Ambuja Cements.
Its outlook for FY26–FY29:
• 23% CAGR in both EBITDA and earnings per share
• $51 billion in planned capex over three years
• Around 60% of capex directed towards power utilities
• More than 65% of funds from operations expected from regulated or sticky cash-flow businesses
Jefferies also notes an improvement in leverage, with net debt-to-EBITDA falling to 4.1x in FY26, from 6.9x in FY22.
It sees capacity expansion, market-share gains and stronger cash-flow visibility supporting the next phase of growth.
economictimes.indiatimes.com…
🚇 Ahmedabad’s Thaltej–Godhavi Metro corridor gets a push.
AUDA has approved key zoning changes and road-widening measures to facilitate the 7-km proposed Metro link connecting Thaltej with the South West Ahmedabad Sports Arena (SWASA) in Godhavi.
Key approvals include:
🛣️ Widening an 18-metre road to 24 metres
🏗️ Zoning changes in parts of Manipur and Godhavi
📍 Provisions for station access and entry/exit infrastructure
The corridor is part of GMRCL’s Phase 3 plan and is being prioritised ahead of the 2030 Commonwealth Games.
Source - TOI


























