Fitting a new Hounsfield Boilers Ltd boiler to an old system and found the return pipework to the boiler to be blocked up heavily. 22mm copper pipe with a 6-8mm hole through it. Carried out a full Kamco power flush on the system and the end result with the pipe is in the pics