building the biggest datacenters. underwater.

Houston
Joined November 2026
Photo by risercloud (YC W27) (@risercloud)Photo by risercloud (YC W27) (@risercloud)Photo by risercloud (YC W27) (@risercloud)Photo by risercloud (YC W27) (@risercloud)
Replying to @PalmerLuckey
@PalmerLuckey We agree with you. Ocean beats land, especially if it can be done cheaper. teapawt.net/AtomsNotBits/status/21…
BREAKING: A @ycombinator startup is attempting to put data centers underwater, powered by stranded natural gas from offshore oil and gas operations. @risercloud plans to install compute hardware, including GPUs, inside standard offshore riser joints, large steel pipes used by oil and gas rigs, which would then be lowered into the ocean using existing offshore infrastructure. The startup targets a 70% reduction in infrastructure CapEx compared to traditional data center construction.
4
215
risercloud has launched. 🚀 AI needs power. Offshore, there’s enormous potential waiting to be unlocked. We’re building risercloud to unlock 100+ GW of stranded offshore power for AI compute by bringing data centers to the energy. Time to build. youtu.be/PWweExh5Z3M?is=iWPu…
2
1
5
2,366
AI's bottleneck isn't chips. It's permits and power. • $130B of US DC projects blocked/delayed in Q1
• Only ~5 of 12 GW announced for 2026 under construction
• 4–7 yr grid waits @chamath on All-In: ~$50B GW campuses won't get built under permit uncertainty.
1
2
7
1,301
Flaring is one of the most overlooked sources of emissions in energy. In 2025 the world flared 167 bcm of gas, releasing ~429 MtCO₂e. That's almost half of all CO₂ from aviation (~970 Mt). Source: World Bank Global Gas Flaring Tracker 2026