StatementDog | AI & Tech Supply Chains (@statementdog) header
StatementDog | AI & Tech Supply Chains (@statementdog) profile picture

Tracking the companies and technologies behind the AI buildout. Research informed by company interviews, site visits, analysts, and industry experts.

Taipei City, Taiwan
Joined June 2024
Photo by StatementDog | AI & Tech Supply Chains (@statementdog)Photo by StatementDog | AI & Tech Supply Chains (@statementdog)Photo by StatementDog | AI & Tech Supply Chains (@statementdog)Photo by StatementDog | AI & Tech Supply Chains (@statementdog)Photo by StatementDog | AI & Tech Supply Chains (@statementdog)Photo by StatementDog | AI & Tech Supply Chains (@statementdog)Photo by StatementDog | AI & Tech Supply Chains (@statementdog)Photo by StatementDog | AI & Tech Supply Chains (@statementdog)Photo by StatementDog | AI & Tech Supply Chains (@statementdog)
InP laser supply is still short in AI optics, and Taiwan's monthly sales show where it's stuck before $LITE and $COHR report again. We track LandMark, VPEC and EZconn, the three companies our Taiwan AI optics map rates as benefiting most directly from the buildout. LandMark is limited by capacity, VPEC by InP substrate, and EZconn by optical fiber supply. Coherent doubled its in-house InP output over the past year and said transceiver growth absorbed the extra volume. LandMark Optoelectronics (3081 TT) booked NT$570M in October, its 15th straight monthly gain and 6.5x its 2023 monthly average. On its Oct. 28 call, the CFO said orders still exceed capacity and backlog is larger than full-year 2026 revenue. He guided Q4 revenue up about 16% from Q3 and plans 2.5x today's capacity in 2027. Our read: the 4% to 6% monthly gains since August are what LandMark can get from current lines and partners. A clear step up in monthly sales as new capacity arrives in 2027 would be the first sign this bottleneck is easing. VPEC (2455 TT) sat at NT$310M to 326M a month from February to June. Sales jumped 29.5% in July, when InP substrate from $AXTI arrived, and have held at NT$449M to 471M since. Local research outlet UAnalyze reports VPEC ran at only about half its capacity in Q3, so the limit is material, not equipment. Headline growth understates the shift. We estimate optical products reached a record 42.5% of VPEC's Q3 revenue, up from about 25% to 30% in 1H26. About 20% of optical revenue now comes from customers who supply their own substrate, and VPEC books only a processing fee on that work. VPEC's substrate is also expected to supply to last through 1Q27, with a German supplier adding volume in 2H27. EZconn (6442 TT) shows a separate limit further down the chain. It makes high fiber-count cables for data centers, and its August to October sales averaged 8.4x its 2023 monthly level. According to our supply chain check, the company is running at full capacity and shipments depend on how much optical fiber it can get, with suppliers' new capacity arriving in 2027. Over the next few monthly reports, we're watching whether LandMark steps up when its new capacity starts running in 2027, and whether VPEC keeps getting substrate after 1Q27.
If you follow $LITE and $COHR, the AI optics buildout also runs through 17 Taiwan-listed companies. We mapped them across five layers and rated how directly each one benefits. Supply is tightest in laser materials today, while CPO parts are mostly a 2027 and 2028 revenue story. Top tier: LandMark (3081 TT) VPEC (2455 TT) EZconn (6442 TT). LandMark and VPEC grow the InP and GaAs epitaxial wafers that laser and photodetector chips are built on. LandMark has a four-year agreement with a US customer for data center CW lasers covering 2027 to 2030. WIN Semiconductors (3105 TT) and IntelliEPI (4971 TT) sit in the same layer, with less of their revenue tied to AI optics. Modules and laser packaging are where 2026 demand shows up first, because pluggable 800G and 1.6T modules remain the volume product. LuxNet (4979 TT) began volume production of 800G products this year and expects 1.6T NPO mass production in the second half of 2027. Elite Advanced Laser (3450 TT) mounts laser chips onto submounts for module makers. Fiber passives are benefiting from denser data center cabling now. EZconn makes high fiber-count trunk cables and MPO cords. High fiber-count products passed half its sales in 1H26, when gross margin reached 59.5%. FOCI (3363 TT) is developing fiber array units for CPO and has told local media it expects shipments to pick up clearly in 2027. Optical module boards need mSAP HDI from 800G up. Zhen Ding (4958 TT) and Compeq (2313 TT) both make them. A US broker expects the mSAP market for 1.6T and faster modules to grow from $0.8B in 2026 to $2.9B in 2028. Accton (2345 TT) builds AI data center switches and also sells optical transceivers. How much it benefits depends on AI networking’s share of its revenue. What we’re watching closely: -How fast 1.6T replaces 800G in 2027 -Whether new InP substrate and CW laser capacity eases pricing -CPO switch volumes, which decide when FAU and CPO parts turn into revenue
2
4
41
2,840
“NVIDIA purity,” Taiwan investors’ term for how much of a supplier’s sales come from NVIDIA, is what I think Washington’s new China compute rule hurts most. The biggest custom-chip buyers end up with more supply and a stronger hand on price. Until now, higher purity earned a higher valuation. The rule caps compute, whatever the chip. But what Chinese companies rent in overseas data centers is mostly general-purpose GPUs, which run anywhere. A Google TPU is built around Google’s own systems and is hard to rent out elsewhere. So when that demand is blocked, GPUs and their suppliers take the hit first. Custom-chip work for U.S. customers, including the projects tied to Anthropic and OpenAI, should hold up near term. ASIC design houses with Chinese clients are a different story: the rule also adds checks on foundries making advanced chips for Chinese designers. Memory doesn’t pick sides. HBM is still close to a standard part, and TPUs use the same kind. If NVIDIA buys less, I think AMD and TPU programs can absorb some of it. Near term I still expect total memory demand to dip. The bigger shift is bargaining power. With fewer buyers chasing the same capacity, the largest ones, which increasingly build on ASICs, can push suppliers on price. Stock prices can’t sort this out yet. $NVDA is down 23% since Nov. 13, against 12% for Broadcom, but that also reflects Jensen Huang’s exit and a Reuters report of an SEC probe. $GOOG $AMD $AVGO
1
193
AI selloffs now hit Taiwan well beyond TSMC, and I think the reason shows up when you compare this cycle with the iPhone era. iPhones built Taiwan’s chip industry, but I think AI ties Taiwan far more tightly to one product cycle, because this time Taiwanese companies keep both the chips and the server assembly. On chips, TSMC needs one customer that pulls volume onto each new node: Apple then, NVIDIA now. High performance computing was 68% of TSMC’s Q3 2026 revenue. Smartphones were 21%, down from 30% a year earlier. Assembly is where the eras split. In the iPhone era, much of the hardware money flowed to China. In 2020, Catcher Technology, a Taiwanese maker of iPhone metal casings, agreed to sell two China units to Lens Technology for $1.4 billion, and Wistron sold its Kunshan iPhone plant to Luxshare. Foxconn is the one company that won both waves. Cloud and networking products made up 54% of its Q3 revenue. Smart consumer electronics, which includes iPhones, made up 29%. I look at Foxconn’s operating profit, not its margin. Server assembly passes expensive GPUs and memory through revenue. Operating profit topped NT$100 billion in a quarter for the first time, according to local media. Taiwan’s exports have shifted the same way. The U.S. took 31.7% of Taiwan’s exports in the first 10 months of 2026, the highest share in 36 years. China and Hong Kong fell to 23.8%, the lowest in 27 years. With supply chains split into China and non-China camps, more AI hardware value stays with Taiwanese suppliers, and more of Taiwan’s market moves with AI spending expectations.
4
2
1
61
9,178
I consider $DELL and $HPE more exposed to the new US curbs on China’s overseas compute rental than the Taiwanese manufacturers that build servers for the big cloud providers. The rule requires a license for GPUs going to any data center that supplies more than 12 million TPP of compute to China-headquartered companies. Google, AWS and Azure are busy filling US demand, so most of that rental went to smaller clouds and neoclouds in Southeast Asia. The law firm Sidley says the rule appears aimed in part at a structure common there, where Chinese hyperscalers finance a neocloud’s data center in a third country and lease the compute back. WSJ reported ByteDance used about 36,000 B200s through Aolani Cloud in Malaysia. Those buyers lean on branded servers. They need the deployment support and financing that Dell and HPE sell with the hardware. DIGITIMES Research expects neoclouds to make up 17% of high-end AI server purchases in 2026 and says they are more likely to buy branded systems. The big cloud providers mostly design their own racks and order directly from Quanta (2382 TT), Foxconn (2317 TT) and Wiwynn (6669 TT), buying branded machines only when short. Their US demand keeps those lines full. Licenses are reviewed case by case, and existing sites have 90 days to apply. Dell reports on Nov. 24 with a $95 billion AI server backlog. It doesn’t break out how much comes from neoclouds in Asia.
3
5
1
35
9,726
U.S. AI chip rules that took effect Nov. 19 close three routes China used to reach advanced compute, and I think the cost falls mostly on non-U.S. operators in Southeast Asia, not on the U.S. cloud providers building there. (1) Renting compute abroad. Data centers supplying more than 12 million TPP to companies headquartered in China, or owned by a parent there, now need a license. The count is aggregate across linked data centers, so splitting a cluster across sites doesn’t get around it. BIS says that includes knowingly serving a non-Chinese customer that trains models for a Chinese company. Existing operators have 90 days. (2) Smuggling. Advanced AI chips shipped to Singapore, Malaysia, Thailand, Indonesia and Brazil now need a license, reviewed case by case. Buyers headquartered in the U.S. are exempt if they file monthly reports. (3) Front companies at the foundry. A chip designer could once avoid controls by keeping a chip under a transistor-count limit. Designers based in China and other countries of concern, or in the five countries above, lose that option. Any logic chip they order at 16/14nm or below is now presumed controlled unless they’re on BIS’s approved list. That’s what $TSM now has to screen for. The U.S. exemption is why I don’t read this as the end of Southeast Asia’s data center buildout. U.S. cloud providers can keep shipping GPUs into Malaysia by filing reports. A local operator needs a license for the chips, and if Chinese labs are its customers, a second license to serve them.
1
3
2
26
7,103
[Taiwan’s Weekly Standout #5] CrowdStrike is in talks to buy Zscaler, Reuters reports. That got us looking at the business of running those tools for companies that need someone watching around the clock. In Taiwan, one answer is CHT Security (7765 TT), the cybersecurity arm of Chunghwa Telecom. Its teams monitor customers’ systems, investigate alerts and respond to threats. CrowdStrike is one of several vendors it works with. About 48% of CHT Security’s revenue in the first nine months of 2026 was recurring. That includes subscriptions for managed detection and response, website protection and other security services. Management says its security monitoring and managed response services have a renewal rate above 90%. CHT Security shares rose 9.3% in the week ended Nov. 20, while Taiwan’s benchmark fell 17.5%.
1
1
19
1,455
Taiwan’s AI suppliers tell me nothing has changed when I check in this week, and I think that reflects how slowly a shock like the new U.S. AI chip rules reaches company level. In an event this big, supply-chain checks lag, and a low forward P/E can get more expensive as the stock falls. The new rules have to pass through customers, license reviews and order books, and companies then need time to reassess. Taiwanese suppliers mostly see little impact for now because demand still exceeds supply. I think this one calls for a top-down view first, with supply-chain checks showing how it plays out later. Valuation is where the lag matters most. A low forward P/E rests on today’s estimates. If orders are cut and estimates fall by half, a stock at 10x becomes 20x at the same price. Each downgrade makes it look more expensive on the way down, and the risk is larger for stocks that already trade at high multiples. So I’m setting aside forecasts made before this month and starting again from each company’s position in the supply chain.
5
7
1
84
14,250
Enterprise SSD is the first thing China’s cloud providers are cutting, and I think it’s a GPU problem, not a storage one. If you can’t get the most expensive chip, you cut the second most expensive part. The land is already bought. By my estimate memory is 20% to 30% of AI data-center capex, so it’s the biggest line left to cut. TrendForce said on Nov. 19 that Chinese cloud providers cut their total 2027 enterprise SSD orders, citing GPU shortages, high inventory and token price competition, by more than U.S. cloud providers raised theirs. It sees overall NAND contract prices flat to down 5% QoQ in 1Q27. Sources quoted by DIGITIMES put the GPU and CPU shortfall at 30% or more, so servers can’t ship as complete sets. Even if this is only a delay, I think it still does damage. When prices are rising because supply is tight, a 90-day slip is enough to take away the reason for the next increase, and buyers who ordered extra to lock in supply start cancelling. Some of the volume has somewhere to go. ZDNet Korea reports Samsung and SK hynix are shifting some eSSD supply from Chinese talks to U.S. customers. Whether other buyers take all of it is still open. So I’d date a China storage recovery by GPU access, more than by AI usage. DIGITIMES’ sources expect late 1Q27 at the earliest, some the end of 2Q27. Until then, I expect pricing to give way before volumes do.
2
1
13
1,338
Replying to @2025Updated
Contacts in Taiwan’s supply chain. Can’t name them, so take it as a supply chain read
2
1
411
The AI supply chain selloff looks like a valuation reset to me, not the end of AI spending. I think upstream orders could be cut by 10% to 20%, while many Taiwanese AI supplier stocks have already fallen 50% to 65% from their highs. Three things hit at once. (1) U.S. data-center approvals were already slowing. (2) New BIS rules now require licenses to ship advanced chips to Singapore, Malaysia, Thailand, Indonesia and Brazil. (3) Renting large amounts of compute to Chinese customers now needs a license too. The Institute for Progress estimates China will have about 8.8 million H100-equivalents of AI compute by the end of 2027, with about 2.8 million, roughly 32%, accessed remotely in data centers outside China. About 75% of that capacity sits in Southeast Asia. I put the loss at about 3% to 5% of new AI compute demand. Which sounds small, but delays compound it. When a project slips a quarter, customers cancel orders placed to secure capacity, and the case for price increases weakens. The revenue side is easier to test now that Anthropic’s S-1 is public. Earlier this week I estimated 2028 capex comes in 5% to 15% below consensus, and higher rate expectations make the funding gap harder to close. But I think 2028 capex would still run about 50% to 70% above 2026. AI demand is definitely still growing. What has changed is the multiple investors will pay, and forecasts made before the BIS rules need redoing. I’d worry most about suppliers that relied on overflow orders. Leaders still sold out on core products should hold up better.
4
4
1
69
10,691
Replying to @jukan05
i've been hearing the same thing during my supply chain checks. apparently this is about v10.
2
318
Google’s reported move back to TSMC for TPU packaging is about v10, based on what i've been hearing in the supply chain. MoneyDJ reported today that Google tested EMIB-T for part of its next-gen TPU packaging, saw yields fall short of expectations, and recently asked TSMC for help again. m.moneydj.com/f1a.aspx?a=04b…
7
3
2
60
4,290
I think AI circuit-board suppliers in Taiwan are heading for a split in their order books with those that relied on overflow orders losing business first. Their stocks haven’t made that distinction yet: the group is down 50% to 65% from its 2026 highs, leaders included. As of the Nov. 19 close, Elite Material (2383 TT), the leading supplier of high-speed CCL for AI servers, was down 52% from its high. Unimicron (3037 TT), the largest ABF substrate maker, was down 58%. Four other CCL and substrate makers I checked were down 55% to 64%. The TAIEX was down 23%, TSMC 19%. Many second- and third-tier suppliers won AI orders because the leaders were fully booked with NVIDIA work. If AI demand cools, the leaders get room to win back other customers, and overflow orders are the first to go. TSMC shows what this looks like for a leader. Reuters reported that TSMC has told some China-linked customers to halt orders at 16nm and below unless they hold a U.S. export license. That capacity can be sold to other customers. Prices are likely to move before volumes. Customers that placed extra orders to lock in capacity can cancel them once projects slip by a quarter, which weakens the case for this year’s price increases. For many suppliers, holding volumes while giving back price hikes would already be a good outcome. I’ll watch whether the leaders’ monthly sales hold up while smaller suppliers slow. That would be the first sign the split has started.
1
2
1
58
12,182
Google’s TPU v9 has an encouraging production update. MediaTek told Morgan Stanley’s Asia Pacific Summit that it’s comfortable with how yields and output are progressing. It still sees EMIB-T substrate supply as key to the ramp. MediaTek also said Google could use TPU v8t and v9 in rack systems for outside AI labs, in addition to using them internally. That could give both chips another source of demand. Timing still matters. A later start would give v9 less time to ramp before v10 arrives, and the report didn’t give an updated shipment timeline.
3
8
1
89
9,232
Standard MLCC pricing is firming up, too. China’s Three-Circle (6951 HK) told Morgan Stanley’s Asia Pacific Summit that its average MLCC selling price rose 20% to 30% quarter over quarter in Q3 2026, mainly because it raised prices on mid- and low-capacitance parts. As Murata and Samsung Electro-Mechanics shift capacity toward higher-end parts, buyers of standard MLCCs have started qualifying other suppliers. That’s why Morgan Stanley sees Three-Circle’s price increase as a positive signal for Yageo (2327 TT)’s standard MLCC business. Three-Circle expects to end 2026 with capacity to make more than 70 billion MLCCs a month, up from about 50 billion at the start of the year. It still sees a shortage of high-capacitance parts through the first half of 2027 and says it has yet to close the technology gap in making those parts in smaller sizes.
1
1
19
1,613
Taiwan stocks fell 4.4% yesterday and were down more than 1,600 points early this morning. Japan’s Nikkei was down 4.1%, and South Korea’s Kospi was down 4.7%. Taiwan stock market’s NT$10,000 club is now empty. As of this morning, only 30 stocks were still trading above NT$1,000 (around US$30.32) a share. Let's not stare at our brokerage app today. Luckily one of my favorite directors just dropped the trailer for his new film about ChatGPT and Sam Altman. What an interesting time to be telling this story and i'm excited to see his take on it. Hope this gives y’all a little break from the markets like it did for me.
Our future is in their hands. Luca Guadagnino’s ARTIFICIAL stars Andrew Garfield, Yura Borisov, Monica Barbaro, Cooper Hoffman, Jason Schwartzman, Chris O’Dowd, with Ike Barinholtz, and Mark Rylance. In select theaters Christmas Day. Everywhere January 8.
2
1
32
2,140
I think Street forecasts for 2028 AI chip spending, aka the numbers behind $NVDA and $AVGO estimates, are too high for the capex that’s supposed to pay for them. The market has GPU and ASIC spending growing about 46% in 2028, to roughly $1.0T. Consensus capex for the big five cloud providers and neoclouds grows only about 14%, to roughly $1.78T. Put those side by side and chips rise from about 35% of that capex in 2026 to 44% in 2027 and 57% in 2028. That implies spending on everything else, from racks and power gear to networking and buildings, falls about 11% in 2028. I expect that spending to grow with the chips. New GPUs and ASICs need power, cooling, networking and floor space before they can earn anything. To support the chip forecasts with chips holding 2027’s 44% share, 2028 capex would have to come in about 28% above consensus. I think it’s more likely to come in 5–15% below. When the two numbers have to meet, I think the chip forecasts are the ones more likely to come down. Some chips go to buyers outside these companies, so the ratio is approximate. A 13-point jump in a single year is still hard to explain that way. The chip forecasts also leave less room for growth than the headline suggests. On the market’s own numbers, the 2028 increase in chip spending, about $318B, is already about 6% smaller than 2027’s $339B. At a 44% share, it would be about 70% smaller. Fab and advanced-packaging expansion follows that yearly increase. I think a smaller increase shows up first in new equipment orders for 2028–29 capacity. 2027 tool shipments are still backed by orders already placed, with $LRCX guiding 2027 WFE above $200B.
I think 2028 AI capex is more likely to come in 5–15% below consensus. OpenAI and Anthropic are growing revenue too slowly to cover the rent on everything being built for them. By my model, the two labs need about $15B of net new ARR every month through 2028 to pay their compute bills. This year they’ve averaged about $10.5B. I started from the landlord’s side. NVIDIA puts a gigawatt of Rubin capacity at about $60B. Depreciate the IT gear over 5 years and the building over 14, charge a 9% cost of capital, add power and operations, and the owner needs roughly $14B a year in rent per GW to break even. That’s on the low side. CoreWeave says its new 4–5 year contracts price at $20–25M per MW. Consensus has the big five cloud providers plus neoclouds spending about $1.0T, $1.6T and $1.8T in 2026–28. After stripping out non-AI spend and capacity they use themselves, I estimate OpenAI and Anthropic will be paying about 70% of the rent on leased-out AI capacity by 2028. Covering that would take about $441B of combined revenue in 2028. At this year’s pace, I estimate they reach about $347B, 21% short. Monthly net new ARR is the number that matters, and it has been choppy even as the base grew. Anthropic’s annualized revenue rose about ninefold this year, yet it added about $16.7B in April, around $3B a month in August and September, and about $10B in October. Token prices roughly halve every year, so usage has to grow about 4x a year just to keep revenue on track. GPU life is the one variable that closes the gap by itself. CoreWeave said Ampere and Hopper pricing rose 30–50% quarter over quarter in Q3. If older chips keep renting at strong prices and servers last 7 years instead of 5, the revenue needed in 2028 falls to about $342B, just under this year’s pace. That has only been tested while compute is scarce, so I keep 5 years as my base case. Most 2027 spending is already under contract, so I expect the adjustment to land on 2028 expansion. Oracle and the neoclouds look most exposed. Analysts estimate OpenAI accounts for roughly half of Oracle’s backlog, and by my math OpenAI alone needs about $90B of outside money to cover 2028 compute, while Anthropic has about $19B to spare. Neoclouds also borrow at higher rates. Financing drives the size of the cut. My base case assumes OpenAI raises about $27B more. With no new money, the 2028 cut widens to 16–26%. With about $65B, consensus holds. A 5–15% cut would slow 2028 GPU and ASIC spending growth from the roughly 46% the market expects to 24–39%. Chipmakers would need less new equipment for 2028–29 capacity, so tool orders could soften first, as early as 2027. Even after that cut, 2028 capex would still run about 50–70% above 2026. I still see AI demand expanding over the long run. Capex expectations got ahead of revenue. Anthropic’s Q4 roadshow guidance implies the two labs’ combined ARR barely grows from October to year-end, which lifts the monthly pace needed in 2027 to about $16.5B. Two straight quarters at that level would ease the pressure on 2028 capex and change my view. $NVDA $CRWV $ORCL #OpenAI #Anthropic
5
1
58
11,696