
doing stuff in tech and finance. Mr President @blueaprilcoop
Joined March 2014
- Tweets12.2K
- Following1.5K
- Followers1.1K
- Likes27.4K
William Olojede retweeted
GOVERNANCE THAT STARTS WITH YOUR VOICE 🇳🇬✅
In his campaign newsletter, H.E. Seyi Makinde states that no single person holds all the answers and invites citizens to share their concerns, question his assumptions, challenge his conclusions, and examine his seven-year record in Oyo State.
According to his statement, the Reset Nigeria Agenda under the Allied Peoples Movement (APM) is built on open dialogue, transparency, and serving one four-year transitional term focused on measurable results.
16 January 2027: Vote Seyi Makinde for President (APM)
#Voteseyimakinde4president #Seyimakinde4president2027 #Nigeriafirst #Resetnigeria2027 #Seyimakinde2027
APC oyo state are foolish, dem no see inspiring young man give us, na old man sharafa and that his steeze-less deputy dem won give us, leemao, we are not going back to egypt, ati cross red sea
William Olojede retweeted
Oyo Will Reject APC Again In 2027 — OYSACC To Alli insideoyo.com/oyo-will-rejec…
it’s God that will punish you, e fe ma fi prison threaten my leader bawo??
SEYI MAKINDE OLORIBURUKU NI E. I RESERVES MY MESSAGE FOR YOU TILL AFTER THE ELECTION. ERANKO JATIJATI SHAMELESS THING.
O MA LO SI PRISON THAT'S GAURANTEE FOR YOU. IN YORUBA LAND POLITICALLY YOU ARE DONE.
@Makinde2027 @seyimakinde
Vote president @officialABAT
MAKINDE NO MATTER WHAT YOU PLAN PRESIDENT TINUBU WILL WIN. ERANKO JATIJATI
53
William Olojede retweeted
#WhySeyiMakinde | Day 13: Not just constructing roads, Easing transportation
1. In May 2020, Oyo State awarded a ₦16.9 billion public–private partnership contract to build four modern bus terminals in Ibadan, at Ojoo, Challenge, New Ife Road and Iwo Road. The Ojoo and Challenge terminals opened in April 2022. The central terminal on Iwo Road was commissioned by former President Olusegun Obasanjo in November 2025. Each terminal has waiting halls, ticket counters, food courts, lifts, toilets and perimeter security, replacing the disorder of roadside motor parks.
2. The buses running through these terminals mattered most after the fuel subsidy ended in 2023 and transport fares rose sharply. Under its SAfER programme, the state committed ₦2.1 billion to keep the Omituntun buses of the Pacesetter Transport Service running at half fare. Between January and July 2025, they carried 5.8 million passengers, about 17,000 people a day. A trip within Ibadan cost ₦100 to ₦200, and inter-city fares were capped at ₦1,500. The fleet now includes about 50 CNG buses, backed by a 20-year gas refuelling partnership to bring operating costs down further.
3. The same thinking extends to air travel. Work to upgrade the Samuel Ladoke Akintola Airport in Ibadan began in September 2024. The runway was extended from 2,400 m to 3,000 m and widened from 45 m to 60 m, so it can now take wide-body aircraft. The project also added an instrument landing system and new runway lighting for night flights. The first aircraft landed on the new runway in September 2025, and by February 2026 there were daily domestic flights, including to Abuja. A new international terminal is designed to raise capacity from 100,000 to one million passengers a year.
Follow me to receive more updates.
Use hashtag #WhySeyiMakinde in your quotes and replies.
#WhySeyiMakinde | Day 12: Ibadan Circular Road, a 20-Year Plan Now on the Ground
1. For more than twenty years, the Ibadan Circular Road was a plan that never got built. The idea goes back to the early 2000s: a 110 km ring around the city that would take through traffic off its busiest roads. The road was flagged off in 2017, but little was built. In July 2021, the Makinde administration re-awarded it as a public–private partnership. Under this build, operate and transfer model, the private partner carries 80% of the cost and the state 20%. Construction began in 2022 on the South-East wing, and the road was named after Senator Rashidi Ladoja, who first conceived it.
2. The South-East wing is 32.2 km long. It runs from the Lagos–Ibadan Expressway to the Ibadan–Ife Road and has six bridges, two of them interchanges where it meets the two expressways. When the acting governor inspected it in August 2026, about 32 km of dual carriageway had been asphalted, with streetlights, toll gates, lay-bys and a medical bay installed. The state’s project list shows the 36 km North-East wing under construction. The rest of the ring is planned for later phases. When complete, the road will pass through six local government areas: Oluyole, Ido, Egbeda, Ona-Ara, Lagelu and Akinyele.
3. Motorists are already feeling the difference. Commercial drivers told Tribune that the Ikire–Lagos trip has dropped from about two hours to around 1 hour 15 minutes. Traffic between Lagos and Ife can now skip the Ibadan toll gate, the Iwo Road interchange, Gbagi, Alakia and Adegbayi, which are some of the most congested points in the city. The road also links to the Moniya rail station, the Ilutuntun business district and the proposed Oluyole Free Trade Zone. At its inauguration in March 2024, Makinde described it as Oyo State’s largest investment in 50 years.
Follow me to receive more updates.
Use hashtag #WhySeyiMakinde in your quotes and replies.
William Olojede retweeted
The best way to help poor people is to create better paying blue collar jobs and a pathway to upward mobility for their children.
It starts with how we can use policy to drive domestic capital formation so more real sector businesses can scale.
More importantly, we need to get off our Twitter thread-writing and big grammar-speaking high horse and have real conversations about helping poor people. That’s why I’m strongly pro-social protection like my Oga @eta_habyb.
speaking of, for @blueaprilcoop, i now have a club/association/society registered with bariga lcda, the Mr President on my bio is no joke, it’s a title recognized by the good people of bariga, talk to me nice, i’m not your mate 🙂↔️😂😂
100





















