carson《oops inc.》 retweeted
Don't forget your two year Environmental Impact Study to convert the abandoned desert junk yard into a solar array.
There was a massive oil spill yesterday in Long Beach near @TheQueenMary during @DreamstateUSA and I haven’t seen a single news report about it
2x and a shrinking pop pyramid.. I wonder what growth rate is needed to even keep up with this!
2
136
incredible team to be a part of. Northwood's capabilities are unbelievable. Phased array tech scales N² with fixed power, we are just getting started. Further, Faster.
Today, Northwood is announcing a $375M Series C.
In February of 2024, less than three years ago, we announced Northwood as a small six-person team.
We’ve grown a lot, but the goal stays the same – solve connectivity between Earth and space to take missions further faster.
The world is hungry for more data movement through space, and that is what we're building for, with scalable network capacity for the most challenging use cases.
We are proud to add new partners to our cap table and continue the journey with existing ones as we enter this new chapter.
Thanks to @a16z @DFJvc @WashingHarbour Alpine Space Ventures @stepstone and many others.
Read more: northwoodspace.io/blog/north…
what if my board is 33 layers with traces that would make lovecraft weep? can it do that?
PCBs made in America. Twice as fast as Shenzhen.
Today @CircuitHub is unveiling The Grid, our factory-scale robot in Massachusetts that builds circuit boards on demand.
No changeovers, no per-design setup. Prototypes and production batches, fully automated.
1
3
106
long $terraform and HVAC
Interesting sections on energy in Anthropic's S1 filing!
There's been speculation on how data centers are managing fuel price risk from gas offtake, whether off-grid data centers will happen at scale
- 'an increasing share of data centers being developed with dedicated onsite generation independent of the grid'
- ANT exposed to fuel price volatility as they bear cost on a pass-through basis, no cap on fuel costs
- Lack of firm gas supply can delay facilities
- For grid connected assets, ANT discusses 'investing in curtailment systems' to reduce strain during peak periods
- Cooling needs may increase over time for data centers due to changing climate
- Notes risk that utilities may reallocate capacity required by ANT data centers
1
55
Chart of the day. Unsure if this is planned capacity, but still. Light em up baby
This Post is from an account that no longer exists. Learn more
1
2
704
shhhh
For Terraform it’s much easier to be immediately price competitive with Methanol than Methane!
The targets in Casey’s blog put Terraform at 50% gross margins, whereas for undifferentiated CH4 you get -300%
ckalitin.github.io/posts/ter…
1
3
354
carson《oops inc.》 retweeted
BREAKING: Northwood Space Opens New 185,000 Sqft HQ & Factory in Torrance, CA
Interview & Tour w/ CEO @bridgitmendler
This takes @NorthwoodSpace's manufacturing footprint from 25,000 to 135,000 sqft & puts antenna production on assembly lines. Portal & Prism each get a dedicated line, PCB assembly & machining come in-house. Production moves in October 2026.
Specs:
› Prism line: 4 parabolic antennas/wk across S-, X- , & Ka-bands
› Portal line: over a full ground site's worth of panels/mo
› Adding 400 jobs over 3 years
› $136M raised to date, plus a $49.8M Space Force contract
"Building the future of space networking is as much a manufacturing problem as a technology one. This facility is how we build the network at rate."
𝐓𝐈𝐌𝐄𝐒𝐓𝐀𝐌𝐏𝐒
(00:00) Bridgit Mendler, Co-Founder & CEO at Northwood
(00:50) Inside Northwood's 180,000 sq. ft. facility
(01:50) Why space missions need Ground Stations
(04:45) What "Full-Stack" means for Northwood
(08:40) How the SpaceX IPO changed space hiring
(10:43) What makes Hardware roles so exciting
(13:32) Winning a ~$50M Government contract
(17:17) Defending against Hacking attempts
(22:45) Turning $136M funding Into a 10-year plan
(26:24) The customers behind Northwood's growth
(29:07) The hardest part of building Infrastructure
(30:44) The Mentors behind Bridgit's journey
(32:24) Learning to trust her gut as CEO
(34:54) Underwater UFOs: Real or not?
(37:22) This is where Antennas will get built
(38:04) Touring the Build & Test stations
(39:26) Anechoic testing chamber
(42:51) The NASA Astronaut
carson《oops inc.》 retweeted
birthdays just don’t feel the same without the free flow of maritime trade through the Strait of Hormuz
carson《oops inc.》 retweeted
Replying to @mattyglesias
It's because building anything at all is illegal. We have multiple canal systems built nearly a century ago that leak or can't run anywhere near capacity, because fixing them would (normatively) take two guys and a bulldozer but (descriptively) consume 10 years and billions of dollars of payoffs to a 100-turtle-deep layer of the usual suspects. We could easily desalinate another 10 million acre feet of water per year, but ... building anything at all is illegal.
carson《oops inc.》 retweeted
Access to power isnt just the current constraint, it’s the final constraint
carson《oops inc.》 retweeted
We say we want to do big things in space. Build in orbit. Move oceans of data. Command thousands of satellites at once.
So what's holding us back?
The satellites keep going up, sending back terabytes. The network to move that data never scaled. That's what we're here to solve.


































