Today our team lifted and installed New Glenn's second stage (GS2) at @NASAStennis. The vehicle was tandem lifted from its cradle using the Main Derrick Crane at the historic B-2 Test Stand to lift the forward end, while a mobile tailing crane simultaneously lifted the aft end. GS2 was shifted to a vertical orientation, lifted 218 feet above ground, and lowered into the B-2 test position. A great example of what Team Blue and our NASA partners can accomplish together. Final preparations for our first hotfire test are ongoing.
The type of shit ULA is gonna do to the CEO of northrop if theres another SRB nozzle failure:
The launch of a United Launch Alliance Vulcan VC6L rocket carrying the next batch of production satellites for @AmazonLeo, Vulcan Leo 1, is planned for Friday, Nov. 13, pending range approval. bit.ly/vulcan_leo1
MCPro24 retweeted
The core stage of the Artemis III rocket is officially stacked.

ALT The bottom half of the orange core stage of the Artemis III rocket is suspended vertically in High Bay 3 of the VAB as a crane moves it into place above the mobile launcher. Several levels of observation platforms are visible behind the core stage and one of the solid rocket boosters is seen below. Credit: NASA/Sean Cannon
MCPro24 retweeted
Was in the lecture hall with my earbuds in and had to sit there like this and try not to burst into laughter when Spotify auto played this bs
MCPro24 retweeted
"The Simpsons cannot predict stuff, that's impossible"
The Simpsons predicting the biggest indie sensation of 2026:
MCPro24 retweeted
Starship Flight 15: Ship 42 conducts a six-engine static fire test.
➡️youtube.com/watch?v=C0lC4tb1…


























