Replying to @Dr_Keefer
@Dr_Keefer asks @JustinTrudeau environment minister @s_guilbeault if he has reconsidered his opposition to #nuclearenergy in light of the IPCC scientific consensus and the success of Ontario’s CANDU-powered made in Canada's energy transition away from coal. #savepickering
Environment & #Climatechange minister #Guilbeault refuses to clarify his position on #Nuclear #energy when pressed by @Dr_Keefer . All 4 #IPCC #decarbonisation pathways call for increased nuclear. @s_guilbeault is out of touch with the scientific consensus. @SPEACanada THREAD 1/
Pickering Saved, Time to Revive Gentilly retweeted
Our conversation with the American side in Oslo was accompanied by three challenges. These were the shortage of air defense, restrictions on Starlink/Starshield, and restrictions on intelligence sharing from the United States of America. I am grateful to the Americans and our team that two of these issues – intelligence and Starlink/Starshield – have been resolved as of today.
The issue of air defense remains. There is progress on missiles for Patriot systems, but things are moving very slowly. More slowly than Russian missiles fly. You cannot say, “Yes, we will give the missiles to you,” and then not deliver them for a month or two. It simply does not work that way.
From an interview with Alla Mazur for TSN Week on 1+1, as part of the United News telethon. (1/5)
Pickering Saved, Time to Revive Gentilly retweeted
We are ready for trilateral talks between technical groups, which must yield a concrete result. The Americans asked me, “What specifics do you want?” I said, “Look, can the war end in November during a meeting of the technical group?” Without the leaders, it cannot be fully ended. Okay, if that is not possible, then give us an energy ceasefire, the sea, grain, an all-for-all exchange, or a meeting of leaders. Of course, that is a result. A result is an opportunity.
Energy, grain, people – these are concrete things, while a meeting at the level of leaders is an opportunity to have something concrete after our trilateral. This is what we are asking for and proposing. We are not demanding it, but proposing it to the American side. Then that would show seriousness. But if this is just a political trick and Putin is simply saying, “Yes, I’m ready,” because he does not want escalation with America before the elections, then we will see very quickly in November whether it was a trick or not.
From an interview with Alla Mazur for TSN Week on 1+1, as part of the United News telethon. (4/5)
Pickering Saved, Time to Revive Gentilly retweeted
"One project alone [the Champlain Hudson Power Express] could provide 1,000 megawatts of hydropower – 50 percent of Indian Point's capacity – and that project has all its approvals."
- Paul Gallay, Riverkeeper president, January 2017
Yesterday, CHPE delivered zero.
It wasn't an outage. NYISO listed the line as available at its full 1,250 MW for all 24 hours, and Hydro-Québec scheduled nothing across it. The last time that happened was July 28. The drop came fast: CHPE carried 15–20 GWh a day from Sept 28 to Oct 1, then 7.6 GWh on Oct 2, about 3 GWh on Oct 3 and 4, and nothing on Oct 5.
Is that allowed? Yes. Hydro-Québec's contract with NYSERDA has no daily or hourly delivery requirement. According to the PSC order approving it:
The only floor is seasonal. Hydro-Québec has to deliver 40% of its promised annual amount in each six-month period.
That floor isn't enforced yet. It's measured over three seasons and doesn't start counting until the third, so the first real test is around summer 2027.
Outages shrink it. It's reduced whenever the line is down, and for curtailment and force majeure.
Hydro-Québec is paid only for what arrives. A zero day costs ratepayers nothing, and also delivers nothing.
The promise was much bigger than the floor. Hydro-Québec bid 10.4 TWh a year. When the PSC approved the contract, it said that number showed the "objective to fill the CHPE line to maximum capacity for 95% of the year." Since June 1, CHPE has delivered 0.68 TWh, about 19% of that pace.
Over the entire day: New York used 378 GWh. Gas supplied 36%, nuclear 20%, hydro 18%, solar 9%, wind 9% and imports 8%. Demand peaked at 18.0 GW at noon, and NYC's highest-priced hour hit $97/MWh.
Pickering Saved, Time to Revive Gentilly retweeted
"Hydro-Québec bid 10.4 TWh a year."
they closed a nuclear power plant for this alchemy?
In 2025 ON was a net exporter of nearly 8 TWh to QC - mostly when natural gas was the marginal generator.
through Q3, 2026's net exports to QC are up another 12%
"One project alone [the Champlain Hudson Power Express] could provide 1,000 megawatts of hydropower – 50 percent of Indian Point's capacity – and that project has all its approvals."
- Paul Gallay, Riverkeeper president, January 2017
Yesterday, CHPE delivered zero.
It wasn't an outage. NYISO listed the line as available at its full 1,250 MW for all 24 hours, and Hydro-Québec scheduled nothing across it. The last time that happened was July 28. The drop came fast: CHPE carried 15–20 GWh a day from Sept 28 to Oct 1, then 7.6 GWh on Oct 2, about 3 GWh on Oct 3 and 4, and nothing on Oct 5.
Is that allowed? Yes. Hydro-Québec's contract with NYSERDA has no daily or hourly delivery requirement. According to the PSC order approving it:
The only floor is seasonal. Hydro-Québec has to deliver 40% of its promised annual amount in each six-month period.
That floor isn't enforced yet. It's measured over three seasons and doesn't start counting until the third, so the first real test is around summer 2027.
Outages shrink it. It's reduced whenever the line is down, and for curtailment and force majeure.
Hydro-Québec is paid only for what arrives. A zero day costs ratepayers nothing, and also delivers nothing.
The promise was much bigger than the floor. Hydro-Québec bid 10.4 TWh a year. When the PSC approved the contract, it said that number showed the "objective to fill the CHPE line to maximum capacity for 95% of the year." Since June 1, CHPE has delivered 0.68 TWh, about 19% of that pace.
Over the entire day: New York used 378 GWh. Gas supplied 36%, nuclear 20%, hydro 18%, solar 9%, wind 9% and imports 8%. Demand peaked at 18.0 GW at noon, and NYC's highest-priced hour hit $97/MWh.
Pickering Saved, Time to Revive Gentilly retweeted
Continuing Russian terrorist attacks on innocent Ukrainian civilians proves Russia is a terrorist state. Sanction Russia out of existence and expel Russia from the UN for these war crimes!
This morning, the Russians once again struck the Pivnichnyi Bridge in Kyiv with a drone. They attacked an ordinary pharmaceutical warehouse in Sumy with drones. Tragically, one person was killed. My condolences to the family and loved ones. In Dnipro, they struck a communications facility. Six people were injured as a result of these attacks.
Overnight, the Russians launched 135 attack drones against Ukraine, more than 50 of them jet-powered. Kyiv, the Dnipro, Kharkiv, Donetsk, Sumy, and Zaporizhzhia regions came under attack. And among the main targets of these terrorists, as always, are ordinary residential buildings, critical infrastructure – everything that makes up normal everyday life. There are power outages in some communities. Our services are working at the impact sites.
It is important that Ukraine is not left alone against this terror. This week alone, the Russians have used more than 1,900 attack drones, 1,700 aerial bombs, and 25 missiles against Ukraine. More than 800 of the drones were jet-powered, and Russia must be held accountable for this escalation.
Today, Friedrich Merz @bundeskanzler – Federal Chancellor of Germany – is visiting Kyiv. A leader of a country that consistently demonstrates leadership in protecting the lives of Ukrainians from Russian strikes. We are grateful for all the support, and today we are preparing decisions to give us in Ukraine, and all of Europe, greater capabilities to defend ourselves. There will be important agreements between Ukraine and Germany. Russia must be stopped together. Thank you to everyone who is helping.
@ZelenskyyUa
Pickering Saved, Time to Revive Gentilly retweeted
IESO delayed launch of next RFP because the Ontario municipal election was a "challenge". They didn't want proposals to be an election issue. Too bad. It is. An Ottawa (fake) enviro group asks candidates to sign a "pledge" to support renewables and make the city a "willing host".
Pickering Saved, Time to Revive Gentilly retweeted
Extending operation of CA's Diablo Canyon plant requires state legislation. Governor Newsom says that the legislation should be considered next year, and be left to the next governor. Article link in reply.
Analyses, and political leaders across the state, support operating the plant until 2045 (when it's new NRC license expires).
Newsom's statement should not be interpreted as a lack of support. After all, he spearheaded the effort to extend operation to 2030 (which also required legislation at the time). The problem is that there is only a couple weeks before the state legislature adjourns for the year. CA will have a new governor next year. Newsom's position is that there is not enough time this year for the legislature to adequately consider such new legislation.
There's reason to be confident that the CA govt. will do the right thing. There is both political and expert consensus.
Analyses show that extended operation to 2045, will save $1.3 billion annually (i.e., it will reduce power costs, vs. what would happen if it closed). It also bolsters grid reliability and reduces air pollution and CO2 emissions. The economic impacts on the local area are more profound. The plant provides a large number of very high-paying local jobs. It will also make huge contributions to the local tax base. Closure of the plant in 2030 would devastate the local economy.
For these reasons, political leaders, on both the state and local levels, are expressing strong support for extending operation to 2045. At one of the debates, all eight of the CA governor candidates said that they would keep the plant running.
Pickering Saved, Time to Revive Gentilly retweeted
seems a strange question.
Should Ottawa strategize with no interest in the outcome of a strategy?
Should an incumbent supply chain be an influence?
technological independence?
yeah.
unlikely to save CANDU- that decline was set in motion by McGuinty open bidding on Darlington B
Should Ottawa Pick Canada's Nuclear Winners?
While directionally positive, the federal nuclear strategy explicitly puts its thumb on the scale for a particular reactor type. The federal nuclear energy strategy mentions CANDU 42 times, Westinghouse three times and GE Vernova Hitachi just twice. Because it has explicitly stated it will use federal funding to back a fleets-based approach (i.e. it will push for a single reactor model for on grid applications to achieve an economy of scale), its intervention is material.
The disparity is all the more glaring as Ontario has taken a decidedly different approach. Bruce C and Wesleyville have made their impact assessment submissions explicitly technology-neutral, And Ontario has set up an expert panel to deliberate on the best reactor technology based on a host of factors. Notably, the next generation CANDU model has not yet been designed.
Are Canada’s interests best served by being a big player in the small market for heavy water reactors, or by moving more thoroughly into the larger global light water reactor market? Should Canada preserve a natural uranium option, or seek to enrich uranium fuel for the growing global nuclear market itself? Are there affordability implications for ratepayers from choosing one technology over the other?
Reasonable people can debate on the pros and cons of the different reactor types. But the federal government should be the one guiding the debate, not tilting the playing field from the outset.
My latest for @TheHubCanada
thehub.ca/2026/08/10/support…
Pickering Saved, Time to Revive Gentilly retweeted
New peer-reviewed study just dropped: adding a tiny 4% dose of $HGRAF Fractal Graphene to ordinary activated carbon nearly QUADRUPLED a supercapacitor’s energy storage. Let me translate what that means for your daily life 🧵⚡ #graphene #EnergyStorage
(Thanks 🙏🏻 @thatkidbigmike)
Pickering Saved, Time to Revive Gentilly retweeted
TC Energy reported today, and scanning the results for Bruce Power I'm feeling they're joining OPG in damaging the pro-nuclear story - and I ought to have noticed how earlier than this.
Hoping for some pushback to put me in my place on this thread...
1/5
Pickering Saved, Time to Revive Gentilly retweeted
Vintage photos from building a nuclear plant in the 1970s on a few hundred acres of corn fields in northern Illinois.
Byron still powers two million people in Chicago today and can keep going for at least half a century more.
We will get back to building.
More pics below.
Chicago folks! Come hang out with @energybants, @captain_rogerb and I on Saturday to talk about America's most nuclear-powered state ⚛️
The event is free and open to the public, register here: chipublib.bibliocommons.com/…
Pickering Saved, Time to Revive Gentilly retweeted
We're hiring broadly across nuclear and maritime disciplines at Ocean Atomics. If you've got the skills and want a challenging, fun, and impactful change, hit us up. The untapped potential of civil nuclear-powered ships and other maritime infrastructure is a thrill. Job board below
Pickering Saved, Time to Revive Gentilly retweeted
I am still confused why this man continues to present himself as an idiot-
but I'm starting to suspect he has no choice.
Gas and nukes...together like an expensive and dangerous tag-team rodeo show. Why not instead produce electricity from cheaper, cleaner renewables and batteries and not drive up electricity rates? ##Onpoli #energytransition
Pickering Saved, Time to Revive Gentilly retweeted
Aalo Atomics’ advanced reactor design, Aalo-X, successfully completed a zero-power fueled criticality demonstration on July 4. It is the fourth micro-reactor to achieve criticality under the DoE Reactor Pilot Program. Article link in reply.
Pickering Saved, Time to Revive Gentilly retweeted
My guess is NRC certification would be helpful in marketing the reactor elsewhere in the world - far more than it indicates hopes for sales within the USA
The CANDU reactor company, AtkinsRéalis Group, has started the process of getting a US Nuclear Regulatory Commission (NRC) license to build CANDUs in the US. Article link in reply.
I never thought this would happen. My guess is that it has to do with the West's shortage of non-Russian enrichment capacity. CANDUs run on natural (unenriched) uranium.
Pickering Saved, Time to Revive Gentilly retweeted
IAEA PRIS data shows Pickering B NGS had its best annual output in 37 years in 2025 - its last full year of operation before the refurbishment won by the efforts of people including @cadlam and others at @CanadiansEnergy
2025 was an excellent year for the soon-to-be refurbished @opg Pickering B units with an average capacity factor of 91.34%.
Unit capacity factors:
Unit 5 - 90.4%
Unit 6 - 75.5%
Unit 7 - 99.5%
Unit 8 - 99.9%
Total production was 16.5TWh.
Pickering Saved, Time to Revive Gentilly retweeted
A bipartisan pair of senators, and a bipartisan pair of representatives, have introduced the "Build Nuclear with Local Materials Act", which would allow use of commercial grade concrete and steel for non-safety-related structures. Article link in reply.
That would significantly reduce nuclear plant construction costs, as nuclear-grade components are much more expensive than the commercial-grade equivalent.
Nuclear-grade materials would still be required for safety-related components. The NRC would retain the authority to determine whether a component or structure is safety-related.
One would have thought that the NRC already allows the use of commercial grade for components they deem to be non-safety-related. Is the issue that NRC was not trying hard enough to determine which components were not safety-related? That they took the easy approach of just classifying every thing as important-to-safety? (I've worked for companies that took the simplistic approach of just classifying everything as nuclear grade in their licsence applications.)
One thing I would add. I hope the NRC will give small reactors proper credit for their much smaller potential hazards. For such reactors, far fewer components should be classified as important-to-safety. That would allow more use of much less expensive commerical-grade components.
Pickering Saved, Time to Revive Gentilly retweeted
Another day, another application for an NRC license to run a nuclear plant for 80 years. This time, for the Cooper Nuclear Station in Nebraska. The license will allow the plant to run until 2054. Article link in reply.
Pickering Saved, Time to Revive Gentilly retweeted
Federal @NDP Leader @avilewis has changed his mind on nuclear energy.
He has taken the courageous stance of moving from a prior nuclear phaseout position to not wanting to shut down existing nuclear plants and in so doing decimate tens of thousands of high paying union jobs and drive up emissions.
Baby steps are better than no steps but that’s not enough Avi.
Steelworkers, Unifor, building trades, power workers are not going to settle for luke warmism.




































