Yash Vardhan retweeted
the $13.5 billion Semicon 2.0 framework approved on 15 July 2026 and gazette-notified on 31 Aug 2026 correctly acknowledges design, material and advanced packaging across 6 pillars.
Pillar 3 offers 40% fiscal capex support for 300mm silicon wafer fabs with a ₹20k crore minimum
Yash Vardhan retweeted
You are absolutely right, Vishnu !
Many anons are being paid by CCP to oppose rafales which once operational will obliterate chotu motu 5th gen J20s as told to us by ex ACM.
Chinese are very particularly worried that this GaAs based 4.5 gen fighter with MASSIVE 838 TRM module radar can detect J20s- which has GaN based electronics, puny radar of ~2000 TRMs, thousands of km away and swat it like a fly.
One Rafale is enough to swat 25 J20s that's why Chinese are shit scared of induction of 114 Rafales in IAF in a 10 yr timeframe even when they are inducting 300 J20s per year.
They are ofc not at all worried of and don't fund guys to oppose induction of mk2s which can wage a real network centric warfare in wartime in mass, raising a rocket force etc which is not that big a threat to them than very partially integrated Rafales which are just a fkin gamechanger as I've already described.
This is absolutely correct, Ajay. Most of these responses are not innocent - the fact that these are anonymous handles is a give away. Most of these are motivated. The goal is to create noise to disrupt capability enhancement by promoting non-existent weapons systems or those not tested. This is a dangerous playbook. Some tell me its a sophisticated disinformation strategy. Thanks for categorically explaining how this works.
Yash Vardhan retweeted
Starting a twin-engine HWF/MWF in the 80s backed by Rupee-Rouble soviet propulsion JVs would have avoided the single biggest trap of the LCA programme: building an unforgiving, ultracompact single-engine airframe with zero margin for an immature domestic engine.
And mind you
‘China angle’
Let’s put it this way- would China prefer India spent 100s of billions on increasingly niche defence solutions- much of it decades old in design that China has already got deep understanding of via their espionage efforts- that India will struggle to integrate with each other and certainly will never have masses of support for to sustain during protracted real world conflict operations
Or a fully integrated indigenous defence industry that can match Indian user operational needs at the design stage, that can scale and prioritise their Indian needs accordingly
Every serious warfighting nation has known the very basic fact that wars are won on industry, Indians have convinced themselves that they can import their way to capability- this will backfire spectacularly time and again
Today the defence secretary of India feels confident enough to talk of sacrificing the LCA MK.2 for Rafale, you truly have to have zero foresight to be making such claims
Yash Vardhan retweeted
This is because the billionaire class in India are, by and large, in legacy industries and tech. They don't hold the state by the balls because even they know their capabilities are replaceable.
US corporations, like Magnificent Seven, OAI, $ANT , as well as $BA, $LMT, $NOC, $RTX, $GE, $GD, have critical and classified capabilities.
Such capability in India only exists with state-owned companies like HAL, BARC, BEL, NTPC etc.
Much of our private companies are not technology but management firms. Their job is largely the import, construction, operation and maintainance of technology. Those are certainly important things, but that also makes them more easily replaceable.
Yash Vardhan retweeted
Replying to @VishnuNDTV
If everything that comes out of IAF has to be blindly trusted then we should go on a crusade against any 5th gen import no? Cuz many in IAF said Rafale can do it all & we shouldn't be calling out the yrs of bullshittery that was peddled to keep the aircraft out of critical debate
Yash Vardhan retweeted
Some clarifications on various themes being discussed about @SarvamAI in the last few days:
1. Government Support: The IndiaAI Mission under MeitY has played a pivotal role in bootstrapping India's AI ecosystem. It gave ~20 startups subsidised access (40% discount) to GPUs for training models. We used that access to train Sarvam 105B from scratch, which we completed and open-sourced this February. The government did not pay Sarvam directly, instead like with every supported startup, the subsidy went to GPU cloud providers, helping seed AI infra in the country.
2. Sarvam Token Factory: Open-weight models saw massive adoption globally this year. They offer a cost advantage over closed models and let enterprises own their AI stack. But this choice is not available to all Indian enterprises, which often need data to remain within the country and low latency for interactive use cases. Sarvam Token Factory is one of the first large inference offerings in India. We serve multiple open-weight models on GPUs we have privately procured, without any government support. We have optimised datacenter scale inference to make our token cost comparable to or lower than established providers such as Fireworks, Baseten and Together.
Today, India consumes a few trillion tokens a day and imports the majority of them. Scaling this consumption up and building sovereign capability requires investing in GPU infra, running efficient token factories, and guaranteeing advantages in cost, latency, and data residency. This is the key objective of Sarvam Token Factory. We will continue to reduce costs further and widen access for inferencing in India.
3. Our own models: Building inference capability does not conflict with our core mission: training our own models. Over the last few months, alongside putting together the token factory and scaling up our enterprise offerings, we optimised our training stack for Blackwell GPUs and achieved significantly higher performance. We used this optimised infra to train an improved checkpoint: Sarvam 105B-1711, which we are open-sourcing today. It improves on reasoning, tool-calling, and co-work tasks, while excelling in Indian languages. It is one of the best Flash-Lite class models, open or closed, achieving high accuracy at a low cost of ₹25 per million output tokens. We also optimised it to run on a single RTX Pro GPU with our agentic product Indus. Along with the weights, we release inference and training recipes so others can build upon it.
In the coming two weeks we will release multiple other models across vision, speech, and edge. And crucially, we are working with partners to get the latest training grade compute into India. This will set us up for training our next generation of much larger models.
4. The Sarvam Journey. To put things in perspective, most AI labs invest 100s of millions of dollars into infra to train from scratch, scaling up to billions for frontier capabilities. We are determined to climb that ladder from India, while building a sustainable commercial engine across population scale and enterprise use cases.
Irrespective of the different narratives, some of which appear manufactured, we firmly believe that India can and must win across the full-stack of AI - we have the talent, the demand, and positivity to adopt AI. At Sarvam we will stay focused and build towards this outcome.
Yash Vardhan retweeted
Hindustan photo film (HPF) established in 1967 ooty,TN with a 300acre campus, was india's pioneer in mfg of magnetic LTO tapes & supplied over ~100M sqm of coating materials. Today's LTO tapes that Sony & Fujifilm have monopoly in, could have been achieved by🇮🇳 if HPF were alive
Yash Vardhan retweeted
Proud of my defence twitter fellas. They go after everyone who lies on aatmanirbharta, even the biggest of “national champions”! None spared.
Yash Vardhan retweeted
-Anonymous handles
-Industrial scale response
-Attack in herds
Saying this while you were in space where everyone treated you with respect
It is clear that you don't have the courage to question your institution nor have the shame to address these things when you are talking to people face to face
Replying to @VishnuNDTV
It's a playbook:
- Anonymous and pseudonymous handles
- Immediate response, at an industrial scale.
- Attack in herds- like street dogs
- Throw allegations, slur and inuendoes- without context
- When countered with fact- throw more slur and inuendoes
- They ascribe to themselves wisdom greater than the collective institutional knowledge at Service HQs and MoD.
To be fair
- All is not well with our decision making at HQs and MoD.
- Errors, double stds, short sightedness and outright stupidity must be called out
- Some points are valid and must be followed through. Credible journalism demands that tough question be asked of the leadership. Our (services) feet must be held to fire.
However
- To hide behind anonymity and paint everyone black is a scoundrel's tactic
- Rage comes easy, when you dont have to answer for your garbage
- To all those who are screaming of corruption: has anyone of you filed an RTI, written a letter to your MP/MLA, submitted a complaint on CPGRAM, written to CVC/CBI. Why not do your patriotic duty and raise a voice on proper chn instead of just spilling garbage on sm.
Hope he knows how those Indian Craftsmen are treated there at the end of the day
Yash Vardhan retweeted
Nothing surprising. Islamic banking rests on three lies: Islam bans all interest, not just debt slavery; interest-free economies have existed; and Islamic banks avoid interest instead of disguising it. This dishonesty predisposes Islamic banks to nepotism, cronyism, and fraud.
"I hope he had a good time. It was the most expensive sex since Helen of Troy."
Senator John Kennedy (R-LA), quoted by NBC News, on whether U.S. national security was put at risk with Jensen Huang at Nvidia.
“I’m less interested in talking to Mr. Huang. You know, he did what he did. I hope he had a good time. It was the most expensive sex since Helen of Troy.”
nbcnews.com/meet-the-press/v…
3
335
Yash Vardhan retweeted
Updated paper (w\ @ArnabDutta1991 Richard Green) estimates both informal (slum) and formal housing supply elasticities for India.
Informal: −0.94 (Informal supply curve slopes down)
Formal: +1.37
We decompose informal supply elasticity
🧵👇
1/4
🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣😂😂🤣🤣🤣😂🤣🤣🤣😂🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣😂🤣🤣🤣🤣🤣😂🤣🤣🤣🤣🤣🤣🤣🤣🤣🤣😂😂🤣🤣🤣🤣🤣🤣🤣🤣😂😂🤣🤣😂😂😂😂🤣😂😂🤣🤣😂😂🤣🤣😂🤣😂🤣🤣😂😂🤣🤣😂😂😂😂🤣😂😂😂😂🤣😂😂😂😂🤣😂😂🤣🤣😂😂😂🤣
And India suffers the Gandhi dynasty economist.com/asia/2026/11/2…
1
4
135
Yash Vardhan retweeted
“They didn't sit in AC offices making PowerPoints.”
There’s been a ton of empirical research done on this: in tropical countries, people will accept comparatively lower salaries if they can work in air conditioning.
I’ve never run a manufacturing unit, so I’m out of my element here. However, I would guess that if electricity becomes cheap enough, some manufacturers can save on labor costs by advertising that their units are air conditioned
"IIT ho ya ITI ho, yahi mere desh ka bhavishya hai."
Modi Ji said this yesterday and I had goosebumps.
I've spent 35 years on factory floors in China. I watched a nation build itself with its hands: welders, toolmakers, mould fitters, and operators who could diagnose and fix a machine faster than most engineers with degrees.
They didn't sit in AC offices making PowerPoints. They built things. And today the world buys from them.
We are the IT back office of the planet. Rightly proud of it.
But AI is coming for that, and fast. Code, reports, emails, spreadsheets, customer support. A lot of this is already being automated. In five years, most of it will be.
What AI still cannot do:
Fit a mould
Set a 250-ton injection machine
Fix a burnt motor at 2 am before a shipment leaves
Feel when a product is "not right" in your hands
That is blue-collar work. And it is the future of Bharat.
The painful truth is this:
We are world-class in bits.
We are embarrassingly weak in atoms.
We have millions of engineers who have never held a spanner. Parents who would rather their son sit jobless with a degree than work with dignity on a shop floor.
That mindset is holding us back.
The winning formula is simple:
Give ITI-level skills the same respect we give IIT degrees. Scale manufacturing capability the way we scaled software. Build atoms with the same seriousness with which we built bits.
I was born outside India. But I wake up every day thinking about how we make it in Bharat.
China did it with its hands. We can too. 🇮🇳
Yash Vardhan retweeted
You are missing the entire point of indigenous development.
Here’s the full, consistent counter: Capability, economics, sovereignty & industrial depth.
1/n
The original thread and many online arguments suffer from a fundamental inconsistency.
They demand world-class capability against China tomorrow while opposing the very investments that build the industrial depth needed to sustain it. China didn’t become a 5th-gen + 6th-gen power by buying handfuls of expensive foreign fighters. It built systems of systems through decades of focused indigenous effort. India has only just begun that journey with Tejas Mk1A, Mk2 and AMCA. That is the point being missed.
👉Arguments ensconced in a warm, fuzzy feeling of desh-bhakti will not win us air battles in the mid 2030s when the Tejas Mk 2 may enter squadron service in significant numbers.
👉 Cherry-picking parts of podcasts while ignoring the context of arguments & suggesting that anyone who doesn't back Tejas is a paid foreign lobbyist is part of what makes so much of our online defence commentary a joke - hide under anonymous veils and fire away. An easy `solution' to not liking an argument is imputing motives.
👉Lets consider the facts - The heart of the mismatch between a new-build Tejas variant in the 2030s and what China is flying presently can be defined in one word - GENERATION.
👉Tejas Mk2 is explicitly a 4th generation, single-engine, non-stealth design.
👉The J-20 is a genuine 5th-generation platform with a stealth planform, internal weapons bays, and DSI intakes.
👉By the time Tejas Mk2 reaches squadrons in meaningful numbers, China's 6th-gen prototypes (the tailless J-36/J-XDS-type designs seen flying since late 2024) will have matured to a point of early-stage induction.
👉Mk2 would be entering service roughly two full generations behind China's frontline development curve.
👉Mk2's first flight has already slid from originally-envisioned 2023 to now early 2027. Every year of delay is a year in which China's 5th- and 6th-generation jet programs mature and scale-up. This gap is widening in real time.
👉Superficial vs. true low-observability: Tejas Mk2's reduced radar cross-section (a significant improvement over Mk1) is a shape optimisation on an aircraft that still carries weapons externally on most stations.
👉While this is a meaningful improvement over Mk1, it is CATEGORICALLY different from the J-20's ground-up stealth design with internal carriage. RCS reduction without internal weapons bays and edge alignment doesn't confer genuine low-observability against modern radars.
👉Engine constraints - Single vs twins: One F414 gives Mk2 solid thrust for its class, but the J-20 (now moving to the WS-15) has far more power margin for payload, supercruise, range, and future growth.
👉This capability gives China an edge in controlling contested airspace over Tibet/the northern border while flying at altitude and at distance from Indian bases.
👉Software/sensor-fusion: There is a potential "system of systems" gap between the Tejas Mk 2 with some reports suggesting that Beijing's newer J-20s (particularly the J-20 twin-seater) is already built around manned-unmanned teaming and distributed sensor networks.
👉Add to that AI-assisted battle management as a likely design premise from day one in the in-service Chinese fighters.
👉At the moment, there is a race against time to induct Tejas Mk2 - the philosophy appears to be induct first, upgrade later. This means that the first in service fighters may not host a spate of new technologies still under development in India. A key question - will avionics and weapons integration on the Tejas Mk-2 be playing catch-up for years after induction?
👉Production and supply-chains: China has ALREADY inducted 300 odd J-20s per some reports and is well on the way in trials of 6th-gen types. Mk2's approved order is around 120 aircraft and the program will remain dependent on U.S-sourced GE F414 engines — unless there is a genuine transfer of technology in engine hot section tech that results in a critical mass in engine manufacturing capabilities in-house. China doesn't have to deal with this. They have achieved engine maturity.
👉In simple terms, Tejas Mk1A and Mk2 cannot be considered a J-20 counter and yet that is PRECISELY the nature of the threat that we face. Pakistan is moving to Chinese stealth platforms as well. In the mid-2030s, we will still have a more than 250 Su-30 MKIs in service - massively upgradeable with significant airframe life remaining in addition to Rafale jets which are being procured and represent the best of what you have.
👉As mentioned - repeatedly - in several of our podcasts - India needs to move to AMCA quickly - and consider the argument that AMCA too may be dated by the time it enters squadron service since China will already have inducted its 6th generation platforms.
👉Does that mean India WILL give up on Tejas and AMCA - No - both projects are too far down the road contractually and otherwise to be scrapped in my opinion. The purpose of this thread is to ask a basic question - does this acquisition make sense given the nature of the threats that we see.
👉Ending this here - will address the `why do we need Rafale if we have Tejas Mk 2' thread when I get around to it.



































